For owners of prime London homes
Best High-End Builders in London: How to Choose (2026)
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
The best high-end builders in London are the ones who have finished homes like yours, in buildings like yours, without the neighbours, the freeholder or the programme going wrong. Compare them on finished prime homes, on who designs, and on who holds the price.
- Visit a finished home of your size and call the owner.
- Ask who designs, and who answers if the drawings and the build disagree.
- Ask for a fixed price for a written scope, not an estimate.
- Check who deals with the neighbours, the freeholder and the party wall.
A prime London home is easy to draw and hard to build. The neighbours, the freeholder and the programme are where jobs go wrong. When you compare high-end builders in London, ask how they handled those on homes like yours.
This guide is written by a London team that designs and builds prime homes. Our house renovation service covers whole houses, and our apartment renovation service covers flats and penthouses. Below we also say when another kind of builder will suit you better. Have a home in mind? Book a site visit before you sign anything.
What decides which builders you need for a prime home
Every high-end builder shows beautiful finished rooms. Fewer can explain how they handled the five things below. Use them as your interview.
1. Homes like yours
A Georgian townhouse, a mansion-block flat and a new penthouse are three different jobs. Ask each builder for two finished homes like yours, and visit one.
2. Who designs
If the designer and the builder are different firms, gaps open between the drawings and the build. Ask who designs, and who answers when the drawings and the site disagree.
3. The price and what is left out
An estimate can grow; a fixed price for a written scope should not. Ask what is excluded. Our guide on why builders' quotes vary explains how to compare them.
4. The neighbours and the freeholder
In London, a big job happens next to people's homes. Ask who deals with the neighbours, the party wall and, in a flat, the freeholder's licence.
5. The budget
A full renovation with us is usually about £1,530 to £1,800 per m², ex VAT and fees. Our guide to house renovation cost in London explains what moves it.
The main types of high-end builders compared
Renovation companies in London come in five main types. These are typical patterns, not judgements on any one firm. Every type has strong and weak names in it.
| Type of builder | Best for | Watch out for | Who holds the price and the programme |
|---|---|---|---|
| Prime-home main contractors | Large houses built to an architect's drawings | The design sits with another firm | The contractor, for the build only |
| Design and build firms (Craftex) | One team for the design, the price and the build | Fewer outside architects to choose from | The design and build firm, for the whole job |
| General builders | Smaller houses and simpler finishes | Prime details, listed work and big programmes | The builder, often as an estimate |
| Trade-led renovation firms | Kitchens, bathrooms and decorating | Structure, services and consents left to you | You, trade by trade |
| Project managers who tender the work | Running a tender for you | They advise; someone else builds | You, with the contractor chosen at tender |
When you compare the best builders in London, ask who holds the price and the programme. If nobody does, every delay becomes your problem. Ask for it in writing before you sign.
Eight checks before you sign
Use these eight checks on every shortlist. They take an afternoon and can save months.
- Finished prime homes of your size. Visit one and call the owner.
- Who designs. One firm, or two, and who answers for the gaps.
- Fixed price or estimate. Ask for a fixed price for a written scope.
- Programme and penalties. The finish date should be in the contract.
- Listed and conservation work. Ask for homes they have done with consents.
- Neighbours, freeholder and party wall. Ask who handles each one.
- Insurance. We carry £10M of professional indemnity cover; ask each builder for theirs.
- Certificates and aftercare. Ask what you receive at handover and who you call later.
You can also check a builder's membership of a trade body such as the FMB, the Federation of Master Builders. Comparing interior designers too? See our high-end interior designers compared.
Where Craftex fits and where it does not
We are a London design and build team for prime homes. We design, price and build whole houses and flats under one contract, with the finish date in the contract.
We are a good fit for whole-house refurbishments, prime flats and penthouses, and period homes. Prime homes start from £100,000 with us. Every job carries £10M of insurance cover. For a period home, read our guide to a Victorian house renovation.
One client wrote: "We bought a house in Hampstead and wanted to redesign and renovate it."
Another wrote: "Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality."
Where Craftex is not the right fit
- Single rooms. One kitchen or bathroom suits a local fitter.
- Small repairs. A local builder will be quicker and better value.
- Handyman jobs. Shelves, doors and odd jobs suit a handyman service.
Prime homes behind our team
Two homes we designed and rebuilt in occupied buildings, and one from our senior team's earlier careers, show the work a prime home needs.
Kensington Olympia: a penthouse in 12 weeks
At Kensington Olympia we designed and rebuilt a 400 sq m penthouse for £550K. It took 12 weeks, with every other flat in the block lived in, and was handed over with zero snags.
Pan Peninsula, Canary Wharf: 290 sq m with the tower occupied
At Pan Peninsula we refurbished a 290 sq m penthouse in 10 weeks, for £274K. The tower stayed occupied, so the works and the deliveries were agreed with the management team.
Herbert Crescent, Knightsbridge: a prime house in 32 weeks
Herbert Crescent is a 450 m² house refurbished in 32 weeks, with neighbours all round. It is our senior team's earlier experience, from before Craftex.
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.
Questions to ask every high-end builder
Take these to each meeting. A builder who answers them clearly, in writing, deserves a place on your shortlist.
We build across London, including Belgravia, Chelsea, Holland Park, Notting Hill, Marylebone, Maida Vale, Earls Court and Putney.
Our house renovation team is happy to answer every one of these. If you are comparing builders now, book a site visit and put the questions to us.
Ten questions to ask every high-end builder
- Which two finished homes like ours can we visit, and can we call the owners?
- Who designs, and who answers if the drawings and the site disagree?
- Is your price fixed for a written scope, and what is excluded?
- How do you price and agree a change?
- Is the finish date in the contract?
- Which listed or conservation-area homes have you done?
- Who deals with the neighbours, the party wall and the freeholder?
- What insurance do you hold, and can we see the certificates?
- What certificates do we receive at handover?
- Who do we call if something fails in the first year?