For landowners in England
How to Make Money From Land You Own
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
There are five main ways to make money from land in England: sell it, sign an option or promotion agreement, go into a joint venture, develop it and keep the profit, or let it while you wait.
- The more planning risk you keep, the more of the gain you can keep.
- A developer or promoter can pay for planning, so you do not have to.
- Farming and short temporary uses can bring income while planning is worked on.
- We offer three routes: we buy it, joint venture, or we deliver it for you.
There are five main ways to make money from land in England. You can sell it, or sign an option or promotion agreement. You can go into a joint venture, develop it and keep the profit, or let it while you wait.
The right one depends on three things. What planning could the land get? How long can you wait? And how much risk do you want to carry? This guide covers England only. Scotland and Wales have different planning rules.
We work with owners on three of these routes. You can sell, partner or develop with us: we buy the land, we go into a joint venture, or we deliver the scheme for you. To find out which fits, send us your site.
Five ways to make money from land, side by side
Each route splits the work, the wait and the risk in a different way. The table shows the pattern. The details are agreed deal by deal.
| Route | Who pays for planning | When you are paid | Your risk |
|---|---|---|---|
| Sell it now | The buyer, after the sale | On completion | Lowest |
| Option or promotion agreement | The developer or promoter | When planning is won and the land sells | Low, but a long wait |
| Joint venture | Shared, as agreed | From the scheme, as agreed | Shared |
| Develop it and keep the land | You, with a team running it | When the homes sell | Highest |
| Let it or use it | No one: no new planning | As rent or income | Low |
A simple rule sits behind the table. The more planning risk you keep, the more of the gain you can keep.
Sell the land now, with or without planning
A sale is the simplest route. Land sells with or without planning permission, and there are two common forms:
- A sale at an agreed price. You are paid when the sale completes. The contract can add an overage, which is a further payment if planning is won later.
- A sale subject to planning. The contract is binding, but the sale completes when the buyer gets a planning permission it is happy with.
The law firm Michelmores points out that an overage depends on future events outside the landowner's control. So treat it as a possible extra, not as part of the price. Our guide to selling land to a developer covers the steps.
Option or promotion agreement: paid when planning is won
With these two agreements, someone else pays for planning and you are paid when it is won. They suit land that needs years of planning work.
In an option, a developer gets the right to buy your land within a set time. Savills says the term is usually five to 10 years. The price is usually a pre-agreed discount to open market value. The developer applies for planning at its own cost.
In a promotion agreement, a promoter pays for planning. The land is then sold and you share the proceeds. Lodders Solicitors says it is not uncommon for one to last ten years or more.
| Agreement | Range the firm gives |
|---|---|
| Option: price as a share of open market value | 75% to 90% |
| Promotion: promoter's fee from the sale price, after deductions | 10% to 25% |
These are one firm's published ranges, not our terms. We agree terms site by site. We do not publish a price. Our guide to option, promotion and joint venture agreements compares them in detail.
Joint venture: put in the land and share the result
In a joint venture you put in the land. The developer brings the planning, the build and the sales. You share the result as the agreement sets out.
You stay in the scheme for longer, so you carry more risk than in a sale. In return you can share in the profit from building, not only the land value. Our joint venture property development page explains how we structure one.
Ask two questions before you sign. Who pays if costs rise? And what happens if planning is refused?
Develop the land and keep the profit
You can keep the land and have the scheme built for you. A development manager runs planning, design, building and sales for a fee. The profit from the finished homes stays with you.
This route has the most reward and the most risk. You pay for planning and building, or raise the money for them. It suits owners with capital who want the full gain. Our development management service is built for this.
Strategic sites take time on any route. Savills says such projects can take 10 years or more and rarely complete in less than three.
Let the land or use it while you wait
Land can earn while planning is worked on. Three options need little or no new planning:
- Farm it or let it for farming. Using land for agriculture is not development, so it needs no planning permission. Grazing counts as agriculture.
- Use it for short events. The planning rules allow land to be used for any purpose for up to 28 days a year. Markets and motor racing get 14 days. Limits apply.
- Sell biodiversity units. Land managers in England can sell these units to developers. You need a legal agreement and must look after the habitat for at least 30 years.
Think hard before the third one. Thirty years is a long tie on land you may want to build on.
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Which route fits your land, and the three we offer
Craftex is a London-based property development and construction company. We buy and develop sites across England. We offer three of the routes above:
- We buy it. We buy the land or building, with or without planning permission.
- Joint venture. You put in the site. We bring the planning, the build and the sales, and we share the result as agreed.
- We deliver it for you. You keep the land. We take the scheme from planning through building to sales for a fee.
We take on sites from about £3M GDV. GDV is the total sale value of the finished scheme. We typically take on schemes of £3M to £150M GDV, and larger schemes are welcome.
Is your land like one of these?
- The roof of a block of flats
- A yard that could take 30 to 60 homes
- An empty office
- Village-edge farmland for 100 or more homes
- A large site for several hundred to 1,000 or more homes
- A stalled scheme
Our team's combined experience covers 11,127 homes taken through planning and £228M of land acquired for development.
We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day. One next step: send us your site.
What to have ready when you send us your land
- The address or postcode
- The Land Registry title number, if you have it
- The size of the land and how it is used now
- Any planning history you know of
- How you would like to be paid: a sale, a share or a finished scheme