Skip to content
Request a callbackCallback
Showroom lounge with curved velvet sofas on a patterned floor, lit display shelves and a crystal chandelier

Commercial Interior Design

Designed by the team that prices and builds it, so the scheme you approve is the one that opens.

Combined team experience

834 design projects delivered
by our team

What stands behind your project

  • 10 yearson the market, trading since 2016
  • £10Mprofessional indemnity cover on our design work
  • 17 weeksfrom concept to handover at Medusa, a Knightsbridge salon and spa
  • 8 weekson site at Drake's, Savile Row, after 4 weeks of design, with the shop open throughout

Drawn, priced and built by one team

Craftex provides commercial interior design for brands, operators and landlords in London and across the UK, from the first layout to construction drawings and the build itself. We take on projects from £100,000 to £10M and above in construction value: at Medusa in Knightsbridge our team took a 180 sq m salon and spa over four levels from concept to handover in 17 weeks.

You get one team from the first sketch to the keys. The people who draw your space also price it and build it, so the design you sign off is one you can afford and open on time.

What we design: showrooms, flagship stores, salons and spas, receptions, client suites and studios. For whom: brands, operators and landlords with a site or a lease. Where: London first, then the rest of the UK.

A floor plan sketched on tracing paper on a timber desk, with marker pens and a sketchbook beside it

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What do we design for commercial clients?

Six kinds of work, one contract, one team that answers for all of it.

Drake's Savile Row flagship after our refit: a curved timber rail of jackets, shelving and a patterned rug

Showrooms and flagship stores

Layouts, displays and lighting that show the product and lead people through the space.

The nail bar at Medusa, Knightsbridge, as built: a marble counter, green velvet chairs and gold circle screens

Salons, spas and wellness spaces

Treatment rooms, wet areas and styling floors planned around water, power and fresh air.

The rebuilt Portsoken House reception: a dark grey desk, a stair with lit treads and rectangular light frames overhead

Receptions and client suites

The first room your clients see, designed to match your brand and built to last.

Glass-walled offices and a meeting room off the main floor at Portsoken House in Aldgate

Studios and branded workspaces

Places to work, meet and present, drawn around how your team uses them. Planning an office? See office design.

Timber shoe wall at Drake's Savile Row: rows of shoes on oak shelves under trailing plants

Bespoke joinery and lighting

Counters, wall units and display pieces drawn by us, made to order and lit as part of the design.

New ductwork, cable trays and lighting under an open ceiling at Portsoken House

Services: heating, cooling, power and data

Air conditioning, fresh air, power and data points planned with the layout, so nothing is cut in later.

Which projects do we take on?

Reception and retail counter at Medusa on Beauchamp Place, with fitted shelving and green bar stools

Right for us

Brands, operators, landlords and developers with a site or a lease, and building work worth £100,000 or more. Our largest jobs go past £10M.

Not for us

Design-only work with no build to follow, and projects under £100,000. A smaller studio will serve you better there.

What to tell us first

Where the space is, how big it is, roughly what you want to spend and the day you need to open.

How it works

How does a commercial interior design project run?

01

Brief and survey

Our design lead and quantity surveyor visit, measure the space and write down what you need.

02

Concept and layout

Our interior designer draws the layout and the look. A first cost plan comes with it.

03

Approvals

We deal with your landlord's licence, planning for signs and outside units where needed, and building control.

04

Drawings and fixed price

Designers and services engineers complete the construction drawings. Our RICS-qualified quantity surveyor then fixes the price.

05

Build and handover

Our site team builds it and hands you the certificates, as-built drawings and manuals.

Cover of the free Craftex guide to commercial interior design

The Craftex Guide to Commercial Interior Design

Our free guide was written for office projects, and its steps hold for any commercial interior: how to size the space, what drives cost and time, and the checklist that keeps your opening date safe. Ten minutes to read.

Our promises

Six promises, written into your contract

These are terms in your contract, not sales lines. They apply to every interior we design and build.

  1. One team from layout to handover

    The designers, the surveyor and the builders work for one company, under one contract.

    Medusa, Knightsbridge: concept to handover in 17 weeks

  2. The agreed price stands

    We fix the price when the drawings are done. A change is written down and priced before anyone starts it.

  3. Your business keeps trading

    We plan the works around your opening hours and your customers.

    Drake's, Savile Row: shop open throughout

  4. Built faster with our own labour

    Around 60% of the labour on site is our own, so the programme does not wait for other firms.

  5. £10M insurance cover

    Public liability, employers' liability and professional indemnity: £10M each.

  6. Every certificate at handover

    Electrical, fire and building control certificates in one file, with the drawings of what was built.

A printed quotation for a commercial interior on a desk with a note saying send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a builder's quote, or a designer's scheme that came back over budget? Send it to us. After a survey we come back with our price for the same scope and a programme to your opening date.

Compare the two routes

Where do commercial interior design projects go wrong?

Most problems start when one firm draws the space and another prices and builds it. Compare the two routes below. More in design and build vs traditional procurement.

AreaSeparate designer and builderWith Craftex
The priceThe design is finished first and priced after, so the first real figure comes lateOur surveyor prices the scheme while it is being drawn
After the tenderThe tender comes back too high and the design is redrawnThe budget shapes the design from the first layout
When drawings clashDesigner and builder each blame the otherOne company answers for the drawings and the build
ApprovalsLandlord and building control sign-off left for you to chaseWe apply, follow up and collect every approval
The programmeWeeks lost in the hand-over from designer to builderOne programme from the brief to opening day
HandoverMissing paperwork and no record of what was builtA full handover file on the day you get the keys

What do you receive at each design stage?

Each stage ends with something you can check and sign off before the next one starts.

StageWhat you receive
BriefA measured survey and a written brief: what the space must do, your budget and your opening date
ConceptA layout, the look and materials, and a first cost plan
ApprovalsDrawings and forms for your landlord, planning and building control
Construction drawingsThe full technical design and one fixed price for the build
BuildA programme, regular updates and every change agreed in writing first
HandoverThe finished space, certificates, as-built drawings and operating manuals

Design fees are set at the consultation, from your brief. These steps follow RIBA Stages 1 to 6; our guide to the RIBA stages explains each one.

Free cost calculator

How much will the build cost?

Enter your floor area and pick a level of finish. You get a first range for the build cost at our 2026 rates. It is the cost of the building work, not a design fee.

Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, construction only, ex VAT and fees, for a unit with sound services. Your fixed figure comes after a survey.

Commercial interior design in London and across the UK

The pedicure lounge at Medusa, Knightsbridge: velvet recliners on a tiled platform and a lit round mirror

London first. We design and build commercial interiors in Knightsbridge, Mayfair, the City and Kensington, and take the same team to projects across the UK.

A treatment room at Medusa as built: blue hand-finished walls, a treatment couch and sash windows

Medusa, Knightsbridge: from an early concept to the keys

Medusa is a beauty salon and spa on Beauchamp Place: a basement and three floors, 180 sq m in all. The owner came to us with an early concept and a few 3D visuals. Our team took that concept to full technical design, then built it. The keys went back 17 weeks after the concept, for a project value of £460K.

Read more

The construction drawings covered plans of all four floors, sections, wall finishes and a data sheet for every room. We also ran the paperwork. We applied for planning permission for the outside sign and for the ventilation and air conditioning units, including the noise assessment they need. We managed building control and collected the certificates. At handover the owner received as-built drawings and the operating and maintenance manuals.

When the design is agreed, the build runs as a commercial fit out by the same team.

Looking for a commercial interior designer or a commercial interior design company in London? Ask who prices the scheme and who builds it. Our commercial interior design services cover the layout, finishes, lighting, joinery and services, and the same firm then builds the interior. We also design restaurants and cafes and hospitality interiors, each on its own page.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Commercial interior design: your questions

How much does commercial interior design cost?

The design fee is set at the consultation, once we have your brief. The build is priced by our quantity surveyor as the scheme is drawn, and the calculator above gives a first range for it.

What does a commercial interior designer do?

A commercial interior designer plans the layout, finishes, lighting and joinery of a business space, fits the services around them and prepares the approvals and the construction drawings. At Craftex the same company then builds it.

Can you design only, or do you design and build?

We do both, but our work is set up for design and build. A design with no build to follow, or a build under £100,000, is not for us.

Can you work with our architect or brand designer?

Yes. We take their concept, turn it into construction drawings and build it. Medusa in Knightsbridge started the same way: an early concept from the client that our team developed and delivered.

Do you handle landlord approval, planning for signage and building control?

Yes. We prepare the licence drawings for your landlord, apply for planning where a sign or outside plant needs it, and manage building control through to the final certificate.

How long does a commercial interior design project take?

It depends on the size and the approvals. Two of ours as a guide: Medusa took 17 weeks from concept to handover, and Drake's on Savile Row took 4 weeks of design and 8 weeks on site.

Can we keep trading during the works?

Often, yes. We phase the work and use evenings and weekends where the building allows. Drake's flagship stayed open for the whole of its refit.

Is the price fixed once the drawings are done?

Yes, for the scope in the drawings. If you ask for a change, we price it and agree it in writing before the work is done. We advise keeping a contingency of 5 to 10% of the construction cost, depending on how complex the job is.

Do you design offices?

Yes. Office layouts, space planning and office interiors have their own page: office design and space planning.

Do you work outside London?

Yes. Our base is in Victoria, London, and we design and build across the UK when the project fits our size range.

What our clients say

See all reviews on Google
  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Planning a commercial interior?

Send us your brief: floor plan, address, rough budget and opening date.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us