Skip to content
Request a callbackCallback
The frame of a new residential tower in London at sunset, with the city and trees below

Fire Engineering and Fire Strategies

For developers, landlords and building owners: a fire strategy that gets your scheme through planning and building control, drawn in from day one.

Combined team experience

834 design projects delivered
by our team

What stands behind your project

  • 11,127homes taken through planning (combined team experience)
  • 10 yearson the market, trading since 2016
  • £10Mprofessional indemnity cover on our design work
  • 28 weeksto remodel the Sloane Place hotel while the club next door stayed open

A fire strategy drawn into the design, then built as written

Our fire engineering team writes fire strategies and fire statements for new builds, conversions, extensions and refits in London and across the UK, and works them into the architects' drawings so the building is designed to pass Part B the first time. Because the same team designs and builds, the fire strategy on paper is the building you get on site.

We take on fire engineering for commercial, mixed-use and residential buildings, including blocks of flats and change-of-use schemes; not fire risk assessments for occupied premises. Our fire engineers sit with a team of architects with 50 years of experience between them, and with the builders who fit the doors, the walls and the alarms.

Who it is for: developers, landlords, building owners, contractors and architects. What you get: a fire strategy report, fire statement and drawings, answers for building control, and the information the owner needs at handover.

First-floor plan from the construction drawings our team made for Medusa, Knightsbridge

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does our fire engineering cover?

Six parts of one service. Take all of it, or the part your scheme needs now.

Ground floor and basement plans from the construction drawings our team made for Medusa, Knightsbridge

Fire strategy reports

How the building warns, protects and gets people out, in one report.

A residential tower core rising beside tower cranes on the London skyline

Fire statements for planning

The fire statement a planning application for a tall block of flats needs.

Ground floor plan from our Allitsen Road study, drawn by our team

Fire strategy drawings

Escape routes, fire doors and compartment lines marked on the plans.

A concrete escape staircase with a red handrail rising through a building

Means of escape and compartmentation

Stairs, corridors and walls that hold a fire back while people leave.

A green Fire exit, Keep clear sign on a grey metal gate beside a brick wall

Fire engineered solutions

A design worked out from first principles when the standard guide does not fit.

The common stair and landing of a modern block of flats, with doors off the landing

Building Safety Act approvals

What a block of flats needs for the Building Safety Regulator.

Which projects do we take on?

Design visual of a lounge at Sloane Place, Chelsea, the boutique hotel our team delivered

Right for us

New builds, conversions, change of use, extensions and refits: offices, shops, hotels, restaurants, student homes, mixed-use schemes and blocks of flats.

Not for us

Fire risk assessments for a building that is already open and in use. That is a job for a fire risk assessor.

What to tell us first

Where the building is, what it will be used for, how tall it is, and any plans you have.

What is a fire strategy report?

Upper floor plans of a block of flats from our Allitsen Road study

A fire strategy report sets out how people stay safe when a fire starts: how the alarm is raised, how people get out, how walls and floors hold the fire back, and how the fire service gets in.

Building control reads it to approve the design. The fire service, the insurer and later the person who runs the building use it too.

Read more

Fire strategy plan, fire safety strategy and fire strategy drawings are names for the same work: the written report plus the plans that show escape routes, fire doors and compartment lines. We write the report and draw the plans together, so they never disagree.

Fire statements for planning in London

Summary sheet of four design options for a block of flats from our Allitsen Road study

Some planning applications must come with a fire statement. Under planning gateway one, it is needed for a building with two or more homes (or student rooms) that is 18 metres or more tall, or has 7 or more storeys.

We write it with the planning drawings, so the layout, the fire engine access and the water supply are settled before you apply.

Read more

GOV.UK says a fire statement should be focused, specific to the development and in proportion to its size. It covers fire safety as it relates to planning: site layout, water supplies for firefighting and access for fire appliances. Our planning team puts it into the application.

How it works

How does a fire engineering appointment run?

01

Brief and drawings

You send the drawings and the use. Our fire engineer tells you what the scheme needs.

02

Options with the architect

Fire engineer and architect agree the stairs, routes and compartments while the design can still move.

03

Report and drawings

The fire engineer writes the strategy and marks it on the plans.

04

Approvals

Planning, building control or the Regulator, and the fire service: we answer their questions.

05

Site checks and handover

We check the fire walls and doors as they go in, then hand over the fire safety information.

Cover of the free Craftex guide for investors and developers

The Craftex Guide for Investors and Developers

Bringing a scheme forward? Our free guide covers the services a developer needs from site to handover, so the fire strategy, the planning and the build are lined up from the start.

Our promises

Six promises, written into your contract

These are terms in your contract, not sales lines. They hold for one report and for a whole building.

  1. Fire, design and build in one team

    The fire engineer works inside the design team from the first sketch.

    Sloane Place: 27 hotel rooms finished next to a working members' club

  2. A fixed fee, agreed first

    You know the fee before we start. Nothing is added without your written yes.

  3. Built the way it was drawn

    Fire walls, doors and stopping are checked before they are covered.

  4. Built faster with our own labour

    Around 60% of the labour on site is our own, so fire works keep pace with the programme.

  5. £10M insurance cover

    Public liability, employers' liability and professional indemnity: £10M each.

  6. Fire safety information handed over

    The strategy, the drawings and the records the building owner needs, in one file.

    Medusa: building control and every certificate managed

A printed quotation for fire engineering work with a note saying send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a fire engineer's fee proposal, or a price for the fire works? Send it to us. We look at the scope and come back with our figure for the same work.

Compare the two routes

Where do fire strategies go wrong?

Most fire problems start when the strategy is written apart from the design and the build. Check your scheme against these six.

AreaThe usual riskWith Craftex
TimingThe strategy is written after the design is fixedOur fire engineer works with the architect from the first sketch
DrawingsThe report says one thing and the plans show anotherOne team writes the report and draws the plans
StairsA second staircase is found to be needed lateStairs and routes are settled while the layout can still change
ApprovalBuilding control rejects the escape designWe agree the approach with the approver early
On siteWorks on site cut through compartment wallsOur site team builds to the fire drawings and we check it
HandoverThe owner gets no fire safety informationYou get the strategy, drawings and records in one file

Building Regulations Part B and the standards we design to

Basement plan from the construction drawings our team made for Medusa, Knightsbridge

Part B of the Building Regulations is about fire safety. The government guide to it, Approved Document B, comes in two volumes: volume 1 for homes and volume 2 for every other kind of building.

We design to the guide where it fits, and work out a fire engineered answer where it does not, so the design stays the one you want.

Read more

When building work puts up or extends a building, or changes its use, the person doing the work must hand fire safety information to the person who will run the building (Building Regulations 2010, regulation 38). We collect it as we build and hand it over at the end.

Blocks of flats and the Building Safety Act gateways

Section through a block of flats from our Allitsen Road study, from basement to roof

A higher-risk building is one with at least 7 storeys or 18 metres, and at least 2 homes (or a hospital or care home). For these, the Building Safety Regulator must approve the building work before it starts, often called Gateway 2.

At the end the Regulator issues a completion certificate, often called Gateway 3, and the building must be registered before people live there. We prepare the fire side of both.

Read more

GOV.UK says the Regulator aims to assess an application for a new higher-risk building in 12 weeks, and for work to an existing one in 8 weeks. Building work started without the approval is a criminal offence. Our guide to the second staircase and Gateway 2 explains what goes into the application.

Fire engineering and the works: one team

Works in progress at Medusa, Knightsbridge, where our team fitted the fire alarm as part of the build

When the fire strategy needs work on an existing building, the same company carries it out: compartment walls, fire stopping and new doors. See our fire safety remediation and fire door installation services.

One team means the strategy, the works and the paperwork all match.

What do you receive?

Each item is a document you can hand to the planners, building control, the fire service or the building owner.

DocumentWhat it is forWho reads it
Fire statementPlanning applications for tall blocks of flatsThe council and its fire safety consultee
Fire strategy reportHow the building meets Part BBuilding control or the Regulator
Fire strategy drawingsPlans marked up with the routes, doors and fire wallsApprovers and the site team
Answers to questionsReplies until the design is approvedBuilding control and the fire service
Fire safety informationWhat the person running the building needs to knowThe building owner or manager

The fee is agreed before we start, from your drawings.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Fire engineering: your questions

What is a fire strategy?

It is the plan for how a building keeps people safe in a fire: the alarm, the escape routes, the walls and doors that hold a fire back, and access for the fire service.

Do I need a fire strategy report?

For most new buildings, conversions and large refits, building control will ask for one. Send us the drawings and we tell you on the first call.

What is a fire statement and when is it needed?

It is a planning document about fire. In England it is needed with applications for tall blocks of flats and student homes: see the fire statement section above.

How much does a fire strategy cost?

We agree a fixed fee from your drawings before we start. It depends on the size and use of the building.

Fire engineer or fire risk assessor: what is the difference?

A fire engineer designs the fire safety of a building before and while it is built. A fire risk assessor checks a building that is already in use. We do the first.

Can you help with Gateway 2 for a block of flats?

Yes. We prepare the fire side of the application to the Building Safety Regulator and answer its questions.

Do you work with our own architect?

Yes. We work with your architect, or ours designs the building with our fire engineer from the start.

Can you also do the fire safety works?

Yes. Our team builds compartment walls, fire stopping and fire doors. See fire safety remediation.

Do you work outside London?

Yes, across the UK. Send us the drawings and the address wherever the scheme is.

What our clients say

See all reviews on Google
  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Send the drawings, the address, the use and the number of storeys.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us