Skip to content
Request a callbackCallback
Restaurant dining room with pink velvet banquettes, white tablecloths, a globe lamp and framed prints on the walls

Restaurant Interior Design

A dining room designed around covers, kitchen flow and your opening date, then built by the same team.

Combined team experience

834 design projects delivered
by our team

What stands behind your project

  • 10 yearson the market, trading since 2016
  • £10Mprofessional indemnity cover on our design work
  • 17 weeksfrom concept to handover at Medusa, Knightsbridge: one of our design-and-build programmes
  • 28 weeksto remodel a 27-key Chelsea hotel with a restaurant and cocktail bar, delivered by our team

Your restaurant, drawn around covers and the kitchen

Craftex provides restaurant interior design for owners and operators in London and across the UK: the layout, the kitchen and bar, the dining room, the approvals and the build. We take on restaurant and cafe projects from £100,000 to £10M and above in construction value, and our design team drew Aunties in Seven Sisters, an 83.35 m² deli-restaurant zoned into service, work and relaxation areas.

You get one team from the first layout to opening night. The people who draw your dining room also price it and build it, so the design you approve fits your budget and your date.

What we design: the dining room, bar, kitchen, entrance, lighting and services. For whom: owners and operators opening or redoing a restaurant, cafe or deli. Where: London first, then the rest of the UK.

Design visual of the Aunties counter, bar seating along a brick wall and the open kitchen

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What do we design in a restaurant?

Six parts of one restaurant, drawn together so they work as one room on a full night.

Restaurant dining room with set timber tables, dark chairs, a textured stone wall and open shelving

Dining room and seating plan

Tables, banquettes and routes for staff, set out to reach the number of covers you need.

Marble bar counter with striped stools in front of a lit timber back bar

Bar and counter

The bar, the back bar and counter seating, with drinks service and storage worked out.

Open restaurant kitchen seen through a glass pass, with a dark stone counter and a row of seats in front

Kitchen layout and extraction route

The cook line, prep and wash-up planned first, with a route for the extract duct to the outside.

Bistro tables and chairs between clipped bay trees outside a stone-fronted London building

Front of house and entrance

The entrance, host stand, waiting area and outside tables: what your guests see first.

Black pendant lights over dining tables in front of a dark textured wall

Lighting, acoustics and finishes

Light levels for day and night, sound control and finishes that stand up to service.

White ceiling with exposed pipework, spotlights and ventilation grilles

Services: ventilation, gas, power and drainage

Fresh air, kitchen extract, gas, power and drains designed with the layout, not after it.

Which projects do we take on?

Design visual of the Aunties grill counter in front of a slatted wall with planting

Right for us

A new restaurant, a new concept in an existing site, a second site, or a cafe or deli with a full kitchen. The building work is worth £100,000 or more, and our largest jobs go past £10M.

Not for us

Decoration-only refreshes and projects under £100,000.

What to tell us first

Where the site is, how many covers you want, roughly what you plan to spend and the night you need to open.

Bright cafe with a tiled counter, a glass pastry case, pendant lights and bentwood chairs at a long timber table

Cafes and coffee shops

We design cafes and coffee shops when the job includes a full fit-out. Cafe interior design is about flow: where the queue forms, how the counter serves, how many seats fit and where grab-and-go sits. Cafe design follows the same steps as a restaurant, with a smaller kitchen.

How it works

How does a restaurant design project run?

01

Brief and covers

Our design lead and quantity surveyor agree the concept, the covers and the budget with you.

02

Layout and kitchen plan

Our interior designer and our kitchen and services engineers draw the layout and the extract route. A cost plan comes with it.

03

Approvals

We handle the landlord, planning for signs and extract where needed, licensing drawings and building control.

04

Drawings and fixed price

The construction drawings are completed and our RICS-qualified quantity surveyor fixes the price.

05

Build and opening

Our site team builds it and hands you the certificates and manuals before you open.

Cover of the free Craftex guide to restaurant design

The Craftex Guide to Restaurant Design

Our free guide to hospitality design, planned around the guest: layout, atmosphere, cost and the steps before opening. Read it before you brief a designer.

Our promises

Six promises, written into your contract

These are terms in your contract, not sales lines. They apply to every restaurant we design and build.

  1. One team, layout to opening night

    Designers, surveyor and builders in one company, under one contract.

    Aunties, Seven Sisters: an 83.35 m² scheme drawn by our design team

  2. The agreed price stands

    We fix the price when the drawings are done. A change is written down and priced before anyone starts it.

  3. Your opening date, planned backwards

    The programme starts from the day you open and works back through the build, the approvals and the design.

  4. Built faster with our own labour

    Around 60% of the labour on site is our own, so the programme does not wait for other firms.

  5. £10M insurance cover

    Public liability, employers' liability and professional indemnity: £10M each.

  6. Every certificate before you open

    Gas, electrical and fire certificates, with the manuals, in your hands before the first service.

A printed quotation for a restaurant interior on a desk with a note saying send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a fit-out quote, or a design that came back over budget? Send it to us. A survey comes first, then our price for the same scope and a programme to your opening night.

Compare the two routes

Where do restaurant design projects go wrong?

The same six problems can sink a restaurant project before it opens. Here is how each one is avoided when one team designs and builds.

AreaThe usual riskWith Craftex
ExtractionThe route for the kitchen extract is found after the lease is signedWe check the extract route before the layout is drawn
The kitchenA kitchen too small to serve the covers in the dining roomKitchen and covers are sized together at the start
The priceThe design is drawn first and priced laterOur surveyor prices each stage as it is drawn
Landlord and licensingDrawings for the landlord and the licence are missing or lateWe prepare and submit them with the design
The opening dateThe date slips in the gap between designer and builderOne programme and one team, from brief to opening
HandoverYou open without the full set of certificatesThe handover file is complete before the first guest

What do you receive at each design stage?

Each stage ends with something you can check and sign off before the next one starts.

StageWhat you receive
ConceptThe concept, a covers plan and a first cost plan
LayoutThe floor layout and the kitchen plan, with the extract route
ApprovalsDrawings for your landlord, planning, licensing and building control
Construction drawingsThe full technical design and one fixed price
BuildA programme to your opening date and every change agreed in writing
HandoverThe finished restaurant, certificates and the operating manuals

Design fees are set at the consultation, from your brief.

Free cost calculator

How much will the build cost?

Enter your floor area and pick a scope. You get a first range for the build cost at our 2026 rates. Add a commercial kitchen if you need one. It is the cost of building work, not a design fee.

Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, ex VAT, fees and loose furniture, for a sound building with services available. Your fixed figure comes after a survey.

Restaurant interior design in London and across the UK

Design visual of the Aunties deli-restaurant scheme: deli counter, green walls and rattan pendant lights

London first. We work in Chelsea, Knightsbridge, Seven Sisters and Victoria, and take the same team to restaurants across the UK.

Design visual of the Aunties deli display, built-in refrigerated counter and shelving under rattan pendants

Aunties, Seven Sisters: a restaurant we designed

Aunties is a deli-restaurant scheme our team designed in Seven Sisters, on a floor of 83.35 m². It is a full interior redesign: new flooring, walls and ceilings and a new layout. The images here are design visuals of the scheme, not photographs of a finished restaurant.

Read more

The layout is planned for both the guest and the staff, with clear zones for service, work and relaxation. The design mixes natural textures, wood, tiles and metal with planting. Warm light accents work with natural light. Custom furniture and display zones are part of the scheme, and the refrigeration is built into the interior.

When the design is agreed, the same team can build it as a restaurant fit out. For ideas before you brief us, read our guide to restaurant design ideas that work.

Looking for a restaurant interior designer in London, restaurant architects or a team for bar and restaurant design? Ask who prices the scheme and who builds it. Restaurant interior designers who also build can tell you the cost while the design can still change. We work as a commercial interior design team for shops, salons and showrooms too, and for groups with several venues we offer hospitality interior design.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Restaurant interior design: your questions

How much does restaurant interior design cost?

The design fee is set at the consultation, once we have your brief. The build is priced by our quantity surveyor as the scheme is drawn, and the calculator above gives a first range for it.

What does a restaurant interior designer do?

A restaurant interior designer sets the concept, the covers and the layout, plans the kitchen and bar, chooses finishes and lighting, and prepares the approvals and the construction drawings. At Craftex the same company then builds it.

Do you design the kitchen as well?

Yes. The kitchen and its extract route are drawn first, because they decide what the rest of the room can do.

Can you design a cafe or coffee shop?

Yes, when the cafe needs a full fit-out and the build is worth £100,000 or more. Smaller refreshes are better served by a local shopfitter.

Do you handle planning for extraction and signage, licensing drawings and building control?

Yes. We prepare the drawings and make the applications. On Medusa in Knightsbridge we obtained planning for the outside sign and the ventilation units, including the noise assessment, and managed building control.

How long does it take from design to opening?

It depends on the kitchen and the consents. As a guide to one of our design-and-build programmes, Medusa in Knightsbridge took 17 weeks from concept to handover.

Can you work with our brand designer or architect?

Yes. We take their concept, turn it into construction drawings and build it.

Do you also fit out the restaurant?

Yes. Design and build under one contract is how we prefer to work, so the people who drew the room are the people who build it.

Can you design a bar or a pub as well as a restaurant?

Yes. We design the bar counter, the back bar, the seating, the lighting and the services as part of a restaurant, hotel or venue project. Our team designs and builds bars and pubs. The Aunties scheme has bar seating, and our team delivered a Chelsea hotel with a cocktail bar. For the build, see bar and pub design and build.

Do you design restaurants outside London?

Yes. Our base is in Victoria, London, and we design and build across the UK when the project fits our size range.

What our clients say

See all reviews on Google
  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Opening or redesigning a restaurant?

Send us your brief: floor plan, address, rough budget and opening date.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us