Architectural Design Services
For developers, property owners and businesses: from sketch to planning approval and construction drawings, build cost known at every stage.
Combined team experience
834 design projects deliveredby our team
What stands behind your project
- 11,127homes taken through planning (combined team experience)
- 10 yearson the market, trading since 2016
- £10Mprofessional indemnity cover on our design work
- 17 weeksfrom concept to handover at Medusa, a Knightsbridge salon and spa
One team draws it, gets it approved, prices it and builds it
Craftex provides architectural design services in London and across the UK: feasibility, concept design, planning drawings and applications, and full technical design, drawn by our architects and priced by our own construction team. We take on projects from £100,000 to £10M and above in construction value, and our combined team experience covers 834 design projects delivered.
A design studio hands you drawings. We hand you a building. One team draws it, takes it through planning, prices it and builds it under one contract, and you know the build cost while it is still being designed.
What we design: commercial buildings and their interiors, hospitality venues, warehouses, prime homes and schemes of flats. For whom: owners, developers, investors and private clients. Where: London first, then the rest of England.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do our architectural design services cover?
Six parts of one service. Take all of it, or bring us in part way through.
Feasibility and site appraisal
What the site or building can take, what it may cost and what could stop it. More on our feasibility studies.
Measured survey and existing drawings
We measure the building and draw it as it stands, so the design starts from true sizes.
Concept design and options
Several ways to lay out the scheme, each with a first cost beside it, so you choose on real numbers.
Planning drawings and applications
Plans, elevations and the supporting statements, sent in and followed up by our planning team.
Technical design and construction drawings
Every wall, door and finish drawn so that it can be priced and built without guessing.
Building control, tender pack and build
Building regulations approval, a priced pack, then the build by our own site team. Heating, power and fresh air are designed with our MEP engineers.
Which projects do we take on?
Right for us
Offices, shops, salons and clinics, restaurants and hotels, warehouses, high-end homes, apartment schemes and conversions, with building work worth £100,000 or more. Our largest jobs go past £10M.
Not for us
Drawings only for a small extension or a loft, and any project with less than £100,000 of building work. A local practice will serve you better there.
What to tell us first
Where the building or site is, what you want to do with it, roughly what you can spend and when you need it finished.
How it works
How does an architectural design project run?
01
Brief, survey and feasibility
Our architect and quantity surveyor visit, measure and test what is possible. You receive options and a cost plan.
02
Concept design
Our architect and interior designer draw the option you chose. You see how it will look and what it will cost.
03
Planning drawings and application
The architect and our planning team prepare the drawings, send in the application and deal with the council.
04
Technical design and fixed price
Architect and MEP engineer complete the construction drawings. Our RICS-qualified quantity surveyor then fixes the price.
05
Build and handover
Our site team builds it and hands you the operating manuals and the as-built drawings.
The Craftex Guide to Residential Design and Build
Our free guide was written for home projects, and its steps hold for any building: the design stages, planning, programme and budget, and what to settle before you appoint anyone. A short read before your first meeting.
Our promises
Six promises, written into your contract
These are terms in your contract, not sales lines. They apply to every building we design and build.
-
One team from first sketch to keys
Architects, surveyor and builders work for one company, under one contract.
Medusa, Knightsbridge: concept to handover in 17 weeks
-
The agreed price stands
We fix the price when the drawings are done. A change is written down and priced before anyone starts it.
-
Your building keeps working
We plan the works around the people who use the building.
Banbury warehouse: the site kept running for all 8 weeks
-
Built faster with our own labour
Around 60% of the labour on site is our own, so the programme does not wait for other firms.
-
£10M insurance cover
Public liability, employers' liability and professional indemnity: £10M each.
-
Every certificate at handover
Building control sign-off, test certificates, manuals and drawings of what was built, in one file.
Already have a quote? Send it to us. We'll beat it.
Have an architect's fee proposal, or a builder's price for a scheme another practice drew? Send it to us. We look at the scope and come back with our figure for the same work.
Compare the two routes
Architect and builder separately, or one team?
When one firm draws and another builds, the gaps between them become your problem. Compare the two routes below. More in design and build vs traditional procurement.
| Area | Architect and builder apart | With Craftex |
|---|---|---|
| The cost check | The design is drawn first and nobody checks the cost until it is finished | Our surveyor prices each stage while it is being drawn |
| The tender | Builders' prices come back over budget and the scheme is redrawn | The budget shapes the scheme from the first option |
| Planning conditions | Conditions on the consent are found late and hold up the start on site | Our planning team reads them early and clears them before work starts |
| Drawings and site | Details that cannot be built as drawn are found on site | The people who will build it check the drawings as they are made |
| Who answers | Two contracts, and each side blames the other | One contract, and one person who answers for design and build |
| Handover | No record of what was really built | As-built drawings and manuals handed over with the keys |
Design and build architects: one contract from drawings to keys
Looking for design and build architects, or for an architect and builder who work as one firm? That is how we are set up: our architects sit beside the people who price and build the job. It is the design side of our turnkey contracting, usually under a JCT design and build contract.
Price checked as the drawings are made
Each stage is costed before you sign it off, so the tender holds no surprise.
One person answers for design and site
You call one director, whether the question is about a drawing or about the build.
No gap between drawings and building
The team that drew the detail is the team that builds it.
What do you receive at each RIBA stage?
The RIBA Plan of Work 2020 splits a project into eight stages, numbered 0 to 7. Each one ends with something you can check and sign off.
| Stage | What you receive | Who does it |
|---|---|---|
| 0 Strategic Definition | A clear statement of what you need, and whether a building project is the right answer | You, with our architect and quantity surveyor |
| 1 Preparation and Briefing | A written brief, a measured survey and a feasibility report with a first budget | Architect and quantity surveyor |
| 2 Concept Design | Concept drawings of the chosen option and a cost plan | Architect and interior designer |
| 3 Spatial Coordination | Coordinated plans, sections and elevations, and the planning application | Architect, MEP engineer and planning team |
| 4 Technical Design | Construction drawings, the building regulations application and a fixed build price | Architect, MEP engineer and RICS-qualified quantity surveyor |
| 5 Manufacturing and Construction | The build itself, a programme, regular reports and every change agreed in writing first | Our site team |
| 6 Handover | The finished building, its certificates, manuals and as-built drawings | Site team and architect |
| 7 Use | Answers to your questions once the building is in use | The same team |
Design fees are set at the consultation, from your brief. The stage names are those of the RIBA Plan of Work 2020; our guide to the RIBA stages explains each one.
Free cost calculator
How much will the build cost?
Enter your floor area and pick a level of finish. You get a first range for the build cost of a commercial interior at our 2026 rates. It is the cost of the building work, not a design fee.
Architectural design services across the UK and London
London first. Our office is in Victoria and most of our design work is in central London. The same team travels: at our Banbury warehouse in Oxfordshire we did the full design and then built it, 2,500 sq m for £350K in 8 weeks, with the site kept running.
Medusa, Knightsbridge: the whole service in one job
Medusa is a salon and spa on Beauchamp Place: 180 sq m over four levels. The owner came to us with an early concept. Our team took it to full technical design, a construction issue of 53 sheets with 33 room data sheets among them. We applied for planning permission for the sign and for the plant outside, with the noise assessment it needs, managed building control and collected the certificates. Then we built it. Concept to handover took 17 weeks, for a project value of £460K.
Read more
At Allitsen Road in St John's Wood the job was feasibility alone: our residential architects drew four options for a derelict club, for a scheme with a GDV of £6M.
What is architectural design? It is the work of deciding what a building will be: its layout, its look, its structure and services, and the drawings that let it be approved and built. An architectural practice is the firm that does this work. Ours sits inside a construction company, so every drawing is priced as it is made.
Need a narrower service? See our commercial architects, residential architects and apartment and housing architects.
Projects our architects designed
A salon and spa taken from concept to keys, a warehouse designed and built around a working site, and a feasibility study with four options.
-
Medusa, Knightsbridge A £460K salon and spa over four levels: an early concept taken to full technical design, approvals run, then built. View case study
-
Banbury warehouse, Oxfordshire A whole warehouse of 2,500 sq m: full design, then design and build for £350K in 8 weeks. View case study
-
Allitsen Road, St John's Wood A feasibility study, not a build: four options drawn for a derelict club. GDV £6M. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Architectural design services: your questions
What do architectural design services include?
Feasibility, a measured survey, concept design, planning drawings and the application, technical design, a priced tender pack and help on site. You can take all of it or start part way through.
How much do architectural design services cost?
The design fee is set at the consultation, once we have your brief. We take on projects with £100,000 or more of building work. The calculator gives a first range for the build, and our guide to architect fees explains how fees are worked out.
Do I need an architect for planning permission?
No. The planning system lets anyone apply for permission. For more than a simple change, though, the drawings and the planning case do most of the work, so most owners appoint an architect. Ours work beside our own planning team.
Are your architects registered?
In the UK, only people registered with the Architects Registration Board (ARB) can legally use the title architect. The ARB and RIBA marks sit with our accreditations lower on this page.
Can you just draw it, without building it?
Yes, on projects above our size line, and the fee for that is agreed at the consultation. Most clients keep us for the build, because by then the price is already known.
What are the RIBA stages?
They are the eight steps of the RIBA Plan of Work, from the first idea to the building in use. Stages 2 to 4 are the design stages.
How long does the design take?
It depends on the size and the approvals. Two of ours as a guide: Medusa took 17 weeks from concept to handover, build included, and Drake's on Savile Row took 4 weeks of design and 8 weeks on site.
Do you work outside London?
Yes, across England. Our Banbury project is in Oxfordshire. Site visits are part of the service.
Do you also do interior design and MEP?
Yes. See interior design and MEP design. Both teams work on the same drawings as our architects.
Read before you appoint an architect
Guides from our own projects: the stages, the fees and the drawings you will need.
-
Guide RIBA Stages Explained: What You Decide at Each Read the guide
-
Guide Architect Fees in the UK: How Architects Charge, by RIBA Stage, and What Changes the Number Read the guide
-
Guide Planning and Building Regulations Drawings Explained Read the guide
What our clients say
See all reviews on Google-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Planning a building project?
We reply within one hour, Monday to Saturday, 8am to 6pm.
Urgent? Message us on WhatsApp: we reply straight away, any day.
Send us your brief: floor plan or site plan, address, rough budget and target date.



























