Skip to content
Request a callbackCallback
New steel beams held on props over the opened back wall of a London house, ready for a rear extension

Structural Engineers

For homeowners, developers and building owners: calculations, drawings and site checks from engineers who work beside our architects and builders.

Combined team experience

834 design projects delivered
by our team

What stands behind your project

  • 561major construction projects delivered (combined team experience)
  • 10 yearson the market, trading since 2016
  • £10Mprofessional indemnity cover on our design work
  • 8 weeksto design and build the Banbury warehouse, with the site kept running

Calculations and drawings that match what is built

Our structural engineers design and check the structure of homes, developments and commercial buildings in London and across the UK: structural calculations, beams and walls, lofts, extensions, basements, frames and temporary works. Because the same team draws, gets approval and can build it, your calculations match what is built on site.

We take on structural design for one beam or wall as part of a wider home project, through to new-build schemes, basements and commercial frames. Our engineers work beside a team of architects with 50 years of experience between them, and beside the builders who put the steel in.

Who it is for: homeowners, landlords, developers, contractors and owners of commercial buildings. What you get: calculations, drawings, answers for building control and checks on site. Where: London first, then the rest of the UK.

Steel beams with new timber joists resting on them, held up by adjustable props in a house being extended

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What do our structural engineers design?

Six kinds of job, one team. Pick yours, or send us the project and we will tell you what it needs.

Section drawing through a block of flats from our Allitsen Road study, showing floors, roof and basement

Structural calculations

Loads, member sizes and connections, set out for building control.

Steel props and scaffold holding the walls of the Gloucester Arms while the inside was opened up

Walls, beams and chimney breasts

Openings in load-bearing walls and chimney breasts taken out safely.

New roof timbers going in under a temporary roof at the Gloucester Arms, Marylebone

Lofts, extensions and basements

Steels, new floors and retaining walls for more space at home.

Inside the Banbury warehouse: the steel frame, high roof and the new block of rooms our team built

Commercial and industrial frames

Steel and concrete frames, mezzanines and new openings.

A new residential tower under construction in London at sunset, with two tower cranes beside it

New-build and development schemes

Foundations, frames and drainage for homes and mixed use.

Full-height scaffold holding the kept façades of Slingsby Place, Covent Garden, from inside the site

Temporary works

Propping, façade retention and support while the work goes on.

Which projects do we take on?

The new base laid inside the kept walls at Slingsby Place, with the tower crane mast, seen from above

Right for us

Homes, blocks of flats, developments, and commercial and industrial buildings. One beam as part of a home project, or the full structure of a new scheme.

Small single jobs

One beam, one wall or a letter for a sale? Send us a photo and a sketch: we tell you on the first call whether a calculation is all you need, and quote a fixed fee for it.

What to tell us first

The address, what you want to change, and any drawings or photos you already have.

Structural calculations for Building Regulations

Section through all four floors of Medusa, Knightsbridge, from the construction drawings our team made

A calculation package shows building control that your structure will stand up. Ours sets out the loads, the size of every beam and column, how each one connects, and the padstones and lintels that carry them.

We send it to building control for you and answer their questions until it is signed off.

Read more

When is it needed? Whenever building work changes how the structure carries its load: a new opening in a wall, a wall taken out, a new floor or roof, an extension, a basement or a change in use that adds weight.

Steel beam calculations, RSJ calculations, padstone and lintel calculations are all parts of the same package. We size each member for its span and load, then check where it sits, so the wall below can take it.

Removing a load-bearing wall or chimney breast

Steel props and braces holding the walls and the floors above inside the Gloucester Arms during the works

First we check whether the wall carries load: what sits on it, which way the joists run and what is above. If it does, we design the beam, the padstones and the temporary support that holds the house while the wall comes out.

Building control then signs it off. Our guide on steel frame buildings shows how steel carries the load.

Read more

Is an engineer needed to take a wall out? If the wall is load-bearing, yes: building control will ask for calculations. A chimney breast is the same. Taking it out leaves the stack above with nothing under it, so it needs a beam or gallows brackets that are designed and approved.

Removing a chimney breast in a party wall is also work you must tell your neighbour about (see party walls below).

Steel beams and RSJs

A new steel beam carrying timber floor joists over an opened brick wall, with props still in place

The size of a steel beam comes from three things: how far it spans, how much it carries, and what it sits on at each end. We work out all three, pick the section and specify the bearings.

Order the steel only once the calculation is approved. Send us the opening size and a photo of the room above, and we tell you what the beam needs.

Read more

RSJ is the old name for a rolled steel joist. Today most beams in homes are universal beams or columns, and some jobs use a box section or a flitch beam. We say which one, and why, in the calculation.

Structural engineers for extensions, lofts and basements

Works in progress across the floors of Medusa, Knightsbridge, during the build our team carried out

For a loft we design the new floor, the steels and the roof changes. For a rear or side extension, the beam over the opening and the new foundations. For a basement, the retaining walls, the slab and the underpinning of the walls above.

Our team also builds them: see our basement conversion and house extensions pages.

Read more

A structural engineer for a loft conversion looks at the existing joists, the walls the new steels sit on and the roof that is cut. A basement needs the most care: the walls of your house and your neighbour's are held up while the ground below them is dug out, in short sections.

How it works

How does a structural engineering job run?

01

Call and photos

You send photos or drawings. Our engineer reads them and tells you what the job needs.

02

Site visit

The engineer visits, measures and looks at what holds the building up today.

03

Calculations and drawings

The engineer designs the structure, with our architect where there is one.

04

Building control

The engineer sends the package in and answers every question until it is approved.

05

Checks or the build

We inspect the work on site, or our own site team builds it.

Cover of the free Craftex Guide to Residential Design and Build

The Craftex Guide to Residential Design and Build

Planning a loft, an extension or a basement? Our free guide walks through the design stages, the approvals, the budget and the programme, so you know what to settle before the engineer and the builder start.

Our promises

Six promises, written into your contract

These are terms in your contract, not sales lines. They hold for a single beam and for a whole building.

  1. Engineer, architect and builder in one team

    The people who calculate it sit beside the people who draw it and build it.

    Banbury warehouse: one team from drawings to handover

  2. A fixed fee, agreed first

    You know the engineering fee before we start. Nothing is added without your written yes.

  3. Your building stays safe

    Temporary works are designed before anything is taken out.

    Slingsby Place: kept façades held at every stage of the demolition

  4. Built faster with our own labour

    Around 60% of the labour on site is our own, so the steel goes in when the drawings say.

  5. £10M insurance cover

    Public liability, employers' liability and professional indemnity: £10M each.

  6. Signed off at the end

    Building control approval, inspection notes and the drawings of what was built, in one file.

A printed quotation for structural engineering work with a note saying send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have an engineer's fee proposal, or a builder's price for the structural work? Send it to us. We look at the scope and come back with our figure for the same work.

Compare the two routes

Engineer, architect and builder: one team or three?

When three firms each do one part, the gaps between them land on you. Compare the two routes below.

AreaThree separate firmsWith Craftex
The steel orderThe beam is ordered before the calculation is approved, then it does not fitSteel is ordered only from approved calculations
Drawings and sumsThe architect's drawings and the engineer's sums show different thingsOur engineer and architect check one set of drawings together
Changes on siteThe builder changes the design on site to make it easierAny change goes back to our engineer before it is built
Building controlQuestions from building control sit unanswered for weeksThe engineer who wrote the package answers them
Before it is coveredNobody looks at the steel before it is boxed inWe inspect it before plaster or concrete covers it
When it goes wrongThree firms blame each otherOne company answers for the design and the build

Commercial and industrial structural engineering

The bright, refurbished floor of the Banbury warehouse with pallet racking and storage

For offices, shops, warehouses and factories we design steel and concrete frames, mezzanines, new openings in walls and floors, and supports for plant on roofs. When a building changes use, we check that its floors can carry the new loads.

At the Banbury warehouse our team did the full design and the build: 2,500 sq m in 8 weeks, with the site kept running.

Read more

Commercial structural engineers are asked for structural design, structural steel design and steel frame design. We do all three, and our MEP engineers fit the services around the frame before site.

Civil and structural engineering for new-build and development schemes

The new ground slab cast inside the kept walls at Slingsby Place, Covent Garden

For housing and mixed-use schemes we design the foundations, the frame, the drainage, and the roads and levels around the buildings. We work with our planning team and our architects for apartment schemes, so the structure is right from the first sketch.

Developers get one team for the whole building, from the ground up.

Read more

Looking for civil engineering companies or civil and structural engineering consultants? This is the same service: the civil design (ground, drainage, roads) and the structural design (foundations and frame) done by one team that can also build it.

Temporary works design

Demolition behind the retained façades at Slingsby Place, Covent Garden, with scaffold holding the old walls

Temporary works hold a building up while it is changed: props and needles under walls, support for the sides of a dig, and frames that keep a façade standing while the building behind it is rebuilt.

At Slingsby Place in Covent Garden our team delivered the works behind kept façades, held by a full-height temporary works system until the new structure took the load.

Read more

Under the CDM 2015 rules, anyone who prepares designs for construction work, including design calculations, is a designer and must reduce the risks to the people who build it. Our temporary works designs are made that way: the method of taking a wall out is planned before the first brick moves.

Party walls and your neighbours

Red-brick mansion blocks side by side on a street in St John's Wood, London

If your work cuts into a party wall, builds on the boundary or digs near your neighbour's foundations, the law says you must tell your neighbour first. GOV.UK says to give notice between 2 months and a year before the work starts.

We design the structure and give your party wall surveyor the drawings and details they need. Our guide to the Party Wall Act explains the steps.

Read more

Work you must tell your neighbour about includes building a new wall on the boundary, cutting into a party wall, making it taller, shorter or deeper, removing chimneys from it, and knocking it down and rebuilding it (GOV.UK, Party walls and building work). If you and your neighbour cannot agree, a surveyor is appointed and makes a party wall award.

Building Regulations Part A: what we submit

Basement plan from our Allitsen Road study, drawn by our team

Part A is the part of the Building Regulations about structure. It says a building must carry its loads safely to the ground, stay stable if the ground moves, and not collapse out of all proportion if something goes wrong.

Approved Document A is the government guide to meeting it. Our calculation package shows building control that your design does what Part A asks.

Read more

The three requirements are A1 loading, A2 ground movement and A3 disproportionate collapse (Building Regulations 2010, Schedule 1, Part A). Approved Document A covers the loads on a building and the construction of its structure, including foundations, walls, floors, roofs and chimneys.

Structural surveys and reports

Upper floor of the derelict Allitsen Road club, recorded by our team during the condition survey

Buying a building, worried about cracks, or need a letter for a sale? A structural survey tells you what is wrong, why, and what it will take to fix.

Our engineers visit, look at the cracks, the walls and the floors, and write a report in plain words with what to do next. See our structural survey page for how it works.

What do you receive?

Each step ends with something you can keep, check and hand to building control or your builder.

StepWhat you receiveWho does it
First callNotes of what the job needs and a fixed feeEngineer
Site visitMeasurements and notes on the existing structureEngineer
DesignCalculation package and structural drawingsEngineer, with our architect
ApprovalAnswers to building control until sign-offEngineer
On siteInspection notes, and a completion letter where agreedEngineer and site team

You know the engineering fee before any of these steps start.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Structural engineers: your questions

Do I need a structural engineer to remove a wall?

Yes, if the wall carries load. We check what sits on it and which way the joists run. If it is load-bearing, building control will want calculations for the beam that replaces it, and we provide them.

How much does a structural engineer cost?

It depends on the job, so we fix the fee after the first call, from your photos or drawings. You know the figure before any work starts.

What do structural calculations include?

The loads, the size of each beam and column, the connections, and the padstones and lintels. They are set out so building control can check and approve them.

Can you design the steel for my loft or extension?

Yes. We design the steels, the new floor and the foundations, and our team can build it too. See our extension page.

Do you design basements and underpinning?

Yes. We design the walls that hold back the ground, the new floor slab and the support for the house above. Our basement team builds them.

Do you work for developers and contractors?

Yes. We design structures for new-build schemes, frames for commercial buildings, civil design for sites and temporary works for contractors.

Will you deal with the party wall surveyor?

Yes. We give the surveyor the structural drawings and details, and answer their questions. The surveyor is appointed under the Party Wall Act.

Can you also build it?

Yes, under one contract with our own site team. Or we provide the calculations and drawings only, and you use your own builder.

Do you inspect the work on site?

Yes, where agreed. We check the steel and the foundations before they are covered, and note what we saw.

Do you work outside London?

Yes, across the UK. We arrange the site visit on the first call.

What our clients say

See all reviews on Google
  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Send us photos, a sketch or the architect's drawings, and the address.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us