Conservation Architects for Listed Buildings
For owners of listed and period buildings: we design changes the council can approve, then build them with the craft the building needs.
Combined team experience
834 design projects deliveredby our team
What stands behind your project
- 11,127homes taken through planning (combined team experience)
- 10 yearson the market, trading since 2016
- £10Mprofessional indemnity cover on our design work
- 28 weeksto remodel a five-storey Victorian building at Sloane Place, Chelsea
Changes the council can approve, built with the craft the building needs
Our conservation architects design alterations, extensions, conversions and repairs to listed buildings, churches and buildings in conservation areas in London and across the UK, and prepare the heritage statement and listed building consent application. Our team has designed and built in period buildings for years, and the same team prices and builds what is approved.
We take on projects from £100,000 to £10M and above in construction value. Behind every drawing is a team of architects with 50 years of experience between them, and builders who know lime, timber and stone.
Who it is for: owners and developers of listed homes, period commercial buildings, pubs, churches and barns. What you get: a survey, a heritage statement, consent drawings, the application and the build.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do our conservation architects work on?
Old buildings of every kind. Tell us which one is yours and what you want to change.
Listed homes
Georgian and Victorian houses changed with care for what makes them special.
Listed commercial buildings and pubs
Shops, offices and pubs given a new life behind the old front.
Churches and chapels
Repairs, new layouts inside and conversion to new uses.
Buildings in conservation areas
Extensions and changes that fit the street.
Barn and farm building conversions
Old barns and farm buildings turned into homes.
Repairs with traditional materials
Lime, stone, brick and timber repaired the way they were built.
Which projects do we take on?
Right for us
Listed homes, period commercial buildings, pubs, churches, barns and buildings in conservation areas, with building work worth £100,000 or more. There is no upper limit.
Not for us
A single like-for-like repair under £100,000. A local repair specialist will serve you better there.
What to tell us first
Send the address, the listing grade if you know it, photos and what you want to change.
Listed building consent: what needs it and how we get it
If you want to demolish, alter or extend a listed building in a way that affects its character, you need listed building consent first. Doing the work without it is a criminal offence.
We survey the building, draw the changes, write the heritage statement and send the application. Read more in our guide to listed building consent.
Read more
The rule is in section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, and the offence in section 9. GOV.UK guidance says listing covers the whole building, inside and out, unless the list entry says otherwise, and that there is no fee for a listed building consent application.
Heritage statements and heritage impact assessments
The council expects you to explain what makes the building special and how your changes affect it. That is the heritage statement, also called a heritage impact assessment.
We write it alongside the drawings, so the design and the case for it are made together.
Read more
GOV.UK planning guidance says applicants should describe the significance of any heritage assets affected, including the contribution made by their setting, in proportion to their importance. The statement can sit inside the design and access statement.
How it works
How does a listed building project run?
01
Survey
Our architect measures the building and records its condition and history.
02
Options and advice
We draw options and, where it helps, take advice from the council first.
03
Consent
We write the heritage statement, draw the consent plans and apply.
04
Drawings and price
Construction drawings are made and our quantity surveyor fixes the price.
05
Build
Our team builds it with trades who work in lime, timber and stone.
The Craftex Guide to Residential Design and Build
Changing a period home? Our free guide walks through the design stages, consents, budget and programme, so you know what to settle before you appoint anyone.
Our promises
Six promises, written into your contract
These are terms in your contract, not sales lines. They hold in every old building we touch.
-
One team from survey to keys
Architects, quantity surveyor and builders work for one company, under one contract.
Sloane Place: a Victorian building remodelled in 28 weeks
-
No work before consent
Nothing on site starts until the consent and its conditions are in place.
-
The right materials
Lime where the building was built in lime, and repairs that match the original.
-
Built faster with our own labour
Around 60% of the labour on site is our own, so the programme does not wait for other firms.
-
£10M insurance cover
Public liability, employers' liability and professional indemnity: £10M each.
-
A record at handover
Drawings of what was built and the approvals, in one file for the next owner.
Gloucester Arms: the old pub front put back
Already have a quote? Send it to us. We'll beat it.
Have an architect's fee proposal, or a builder's price for work to a listed building? Send it to us. We look at the scope and come back with our figure for the same work.
Compare the two routes
Where do listed building projects go wrong?
Old buildings punish shortcuts. These are the six places we see projects fail, and what we do instead.
| Area | The usual risk | With Craftex |
|---|---|---|
| Consent | Works start before consent is granted | Nothing starts until consent and its conditions are clear |
| Materials | Cement used on walls built in lime | We repair in the materials the building was made from |
| Surprises | Historic fabric is found late and the design changes | We survey and open up early, before the design is fixed |
| Conditions | A consent condition is missed on site | Every condition is tracked and signed off |
| Price | The price is set before anyone has looked behind the walls | The price comes after the survey and the drawings |
| Builder | A builder with no heritage experience | Our own team, used to period buildings |
Church and chapel architects
We design repairs, new layouts inside, extensions and the conversion of churches and chapels to new uses, such as homes, schools or community halls.
Our team surveys the fabric first, so the design works with the building, not against it.
Conservation areas: what changes need permission
In a conservation area, councils look harder at changes that alter how a street looks: extensions, new windows, roofs and demolition. Some work that is allowed elsewhere needs planning permission here.
Our planning team checks what your change needs before we draw it.
Read more
The Planning Portal says there is no application fee for planning permission for relevant demolition in a conservation area. Your council's conservation officer can say early whether a change is likely to be accepted, and we take that advice into the design.
What do you receive at each stage?
Each stage ends with something you can check before the next one starts.
| Stage | What you receive | Who does it |
|---|---|---|
| Survey | Measured drawings and a record of the condition | Architect |
| Options | Sketch options and early advice from the council | Architect and planning team |
| Consent | Heritage statement, consent drawings and the application | Architect |
| Construction package | Construction drawings and a fixed price | Architect and quantity surveyor |
| Build and handover | The finished work and a record of what was done | Our site team |
Design fees are set at the consultation, from your brief.
Period buildings our team has delivered
An old London pub given a new use behind its front, a new structure behind kept façades, and a Victorian building turned into a boutique hotel.
-
The Gloucester Arms, Marylebone A corner pub propped, re-roofed and rebuilt behind its frontage as school premises. View case study
-
Slingsby Place, Covent Garden Structural works behind façades that had to stay, delivered by our team. View case study
-
Sloane Place, Chelsea A 27-key boutique hotel in a five-storey Victorian building, £1.29M: our team delivered it. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Conservation architects: your questions
Do I need listed building consent?
Yes, for any work that would affect the character of a listed building, inside or out. Repairs like for like may not need it, so we check with you first.
Is there a fee for listed building consent?
No. There is no council fee for a listed building consent application. You pay for the drawings and the heritage statement.
Which listing grades are there?
Grade I, Grade II* and Grade II. The grade changes who the council must tell about your application, not whether you need consent.
What is a heritage statement?
It is the written case for your design: why the building matters and why the change respects it. The council reads it with the drawings.
Do you design church and chapel projects?
Yes: repairs, new layouts inside, extensions and conversion to new uses.
Can you convert a barn or a listed building into homes?
Yes. We design the conversion, get the consents and build it with our own team.
Can you also build it?
Yes, under one contract, with our own site team and specialist trades.
Do you work outside London?
Yes, across the UK. Send us the address and photos wherever the building is.
Read before you change a listed building
Guides on consent, drawings and old buildings, from our own projects.
-
Guide Listed Building Consent in London: Converting a Listed Building to Homes Read the guide
-
Guide Planning and Building Regulations Drawings Explained Read the guide
-
Guide Pub Conversion in London: Change of Use from Pub to Residential Read the guide
- More guides
What our clients say
See all reviews on Google-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Own a listed or period building?
We reply within one hour, Monday to Saturday, 8am to 6pm.
Urgent? Message us on WhatsApp: we reply straight away, any day.
Address, listing grade if known, photos and the change you have in mind.



























