For developers, businesses and owners choosing an architect
Best Architects in London (2026): How to Choose
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
There is no single best architect in London: the best London architects for you are the ones who design your type of building at your size. Last checked 21 Nov 2026, this list sorts nine practices by what each is best for.
- Large offices, schools and mixed-use schemes: AHMM.
- Build to rent and large housing schemes: Assael, Formation Architects, ColladoCollins.
- Hotels: Studio Moren. Private homes and extensions: Scenario Architecture, Urbanist Architecture, Extension Architecture.
- One team to design and build a commercial or high-end project: Craftex.
Ask ten people for the best architects in London and you get ten names. That is fair, because the best London architects for an office tower are not the best for a house. So this list sorts practices by what each is best for.
Craftex wrote this list and is in it, so weigh that. We are commercial architects in London who also build. Our wider team of architects and interior designers in London covers homes and interiors too. Have a building in mind? Book a free design consultation.
How we chose and checked this list
We did not rank firms from one to nine. A rank needs data nobody outside those firms has. We used five rules, and we show the same facts for every firm.
- A London base. Each practice has a London studio or names London as its home.
- A clear type of work. Each one says on its own site what it designs.
- Facts from the firm's own website. We opened every site on 21 Nov 2026 and used only what it says.
- Real named projects. Where a site names a project, we name one. Where it does not, we say so.
- A spread of sizes. The list runs from practices of hundreds of staff to small studios.
Comparison table of practices and project sizes
Start with your building, not with a famous name. Find your type of project in the table. Then read that firm's entry below it.
The size column shows only what each practice says about itself. Most do not publish a typical project size. Where a site gives a staff number, we show that instead. Where it gives nothing, we write "not stated".
| Practice | Best for | Model | Size shown on its own site | Website |
|---|---|---|---|---|
| AHMM | Large offices, schools and mixed-use schemes | Design practice | Over 400 staff | ahmm.co.uk |
| Assael | Build to rent and large housing schemes | Design practice | Not stated | assael.co.uk |
| Formation Architects | Housing for developers and super prime homes | Design practice | A staff of 90 | formationarchitects.co.uk |
| ColladoCollins | Student, co-living and mixed-use schemes | Design practice | Not stated | colladocollins.com |
| Studio Moren | Hotels and serviced apartments | Design practice | Not stated | studiomoren.co.uk |
| Urbanist Architecture | Planning-led homes and small developments | Architecture and planning | Not stated | urbanistarchitecture.co.uk |
| Scenario Architecture | Private homes | Design, with construction management | Not stated | scenarioarchitecture.com |
| Extension Architecture | Extensions and change of use | Architecture and planning | Not stated | extensionarchitecture.co.uk |
| Craftex | Commercial and high-end projects designed and built by one team | Design and build | Builds from £100,000 to £10M and above | craftex.co.uk |
The best London architects compared by type: large practices
These four practices design large buildings for developers, investors and public clients. Their own sites show the size of their teams and their schemes.
AHMM: best for large offices, schools and mixed-use schemes
- Base: studios in London, Bristol, Oklahoma City, Madrid, Sydney and Fayetteville.
- Founded: the year is not stated on the page we read.
- Model: design practice.
- Size signal: "over 400 highly skilled staff".
- Sectors it lists: office, residential, education, mixed use, masterplanning and reuse.
- A project it names: Burntwood School.
- Website: ahmm.co.uk
Assael: best for build to rent and large housing schemes
- Base: "studios in London and Bahrain".
- Founded: not stated on the page we read.
- Model: design practice with five disciplines, from architecture to landscape design.
- Size signal: staff numbers are not stated.
- Sectors it lists: private, affordable, build to rent, co-living and later living homes.
- A project it names: Union Wharf.
- Website: assael.co.uk
Formation Architects: best for housing for developers and super prime homes
- Base: a studio at the Oval, Kennington, and a second office in Cardiff.
- Founded: not stated on the page we read.
- Model: design practice, from concept design to construction delivery.
- Size signal: "a staff of 90 and growing".
- Sectors it lists: mainstream residential, super prime, commercial offices and hotels.
- A project it names: The Green Quarter, Phase 2.
- Website: formationarchitects.co.uk
ColladoCollins: best for student, co-living and mixed-use schemes
- Base: 17-19 Foley Street, London W1.
- Founded: 2004.
- Model: design practice.
- Size signal: staff numbers are not stated.
- Sectors it lists: build to rent, co-living, student, hotel and leisure, mixed use and office.
- A project it names: One Maidenhead.
- Website: colladocollins.com
Architects compared by type: hotels and homes
These four practices are smaller or more focused. Pick them when your project matches their one clear type of work.
Studio Moren: best for hotels and serviced apartments
- Base: a London phone number; no office address on the page we read.
- Founded: the year is not stated; the site says "over the past three decades".
- Model: design practice: architecture, interior design, sustainability and principal designer services.
- Size signal: staff numbers are not stated.
- Sectors it lists: hotels, build to rent, serviced apartments and student living.
- A project it names: none in the text of the page we read.
- Website: studiomoren.co.uk
Urbanist Architecture: best for planning-led homes and small developments
- Base: offices in Greenwich and Belgravia.
- Founded: not stated on the page we read.
- Model: architecture and planning practice with three service packages.
- Size signal: project numbers are not stated.
- Sectors it lists: extensions, flat conversions, new-build flats, change of use, listed buildings and Green Belt.
- A project it names: none on the page we read.
- Website: urbanistarchitecture.co.uk
Scenario Architecture: best for private homes
- Base: Wandsworth, London SW18.
- Founded: the year is not stated; the site says nineteen years in business.
- Model: a RIBA-chartered practice: design, interior design, and project and construction management.
- Size signal: staff numbers are not stated.
- Sectors it lists: residential projects only, for private homeowners.
- A project it names: none on the page we read.
- Website: scenarioarchitecture.com
Extension Architecture: best for extensions and change of use
- Base: Roehampton Lane, London SW15.
- Founded: the year is not stated; the site says "over 11 years of experience".
- Model: architect and planning consultant practice.
- Size signal: project numbers are not stated.
- Sectors it lists: extensions, lofts, change of use, and hotel, retail, restaurant and bar projects.
- A project it names: none on the page we read.
- Website: extensionarchitecture.co.uk
Where Craftex fits and where it does not
Craftex is the one firm on this list that both designs and builds. Our architects draw the scheme, our quantity surveyor prices it as it is drawn, and our own team builds it.
- Base: Unit 5, 160 Buckingham Palace Road, Victoria, London SW1.
- Founded: trading since 2016.
- Model: design and build under one contract.
- Size signal: projects from £100,000 to £10M and above in construction value.
- Sectors: offices, shops, restaurants, hotels, warehouses and high-end homes.
- A project we name: Medusa, Knightsbridge.
- Website: craftex.co.uk
At Medusa in Knightsbridge our team took the concept to full technical design, then built it. In Banbury we designed and built a 2,500 sq m warehouse for £350K in 8 weeks. Our guide to design and build vs traditional procurement explains the two routes.
Where Craftex is not the right fit
- Towers, masterplans and landmark public buildings. A large practice such as AHMM suits those.
- Design only, with no build. A design practice that tenders the build will suit you better.
- Small house extensions. Our projects start at £100,000 in construction value.
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
Five checks before you appoint an architect
Use these five checks on every practice, ours included. They take one afternoon.
- Check the Register. ARB says only people on its Register can legally use the title architect. Search it before you hire.
- Ask for buildings like yours. Ask for two finished projects of your type and size, and visit one.
- Ask how the fee is set. RIBA names three ways: a percentage of the construction cost, a lump sum or a time charge.
- Ask who prices the design. A design priced only at tender can come back over budget.
- Ask who builds it. Find out who holds the build contract and who answers for the cost.
Our guides to architect fees and the RIBA stages explain the fee and the steps. For a longer method, read how to choose an architect.
Want one team for the drawings and the build? Book a free design consultation and bring the plans you have.