Estimate vs Quotation vs Detailed Cost Plan

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 12 min read

Large office floor stripped back for a fit-out, with the ceiling services exposed and plasterboard stacked by the windows

The short answer

An estimate is a guide price that can change, and a quotation is a fixed price for the scope it describes. A detailed cost plan prices your real scope line by line after a site visit, so you know what every pound buys.

  1. A free price is a bulk figure or a list of assumptions, and it tends to rise once you say yes.
  2. Prices for the same job differ because each contractor priced a different scope.
  3. Our detailed cost plan includes a site visit, a consultation and value engineering advice.
  4. It starts from £750 + VAT and is credited against the project if you build with us.

Estimate vs quote, in one line each. An estimate is a builder's guide price, and it can change. A quotation, or quote, is a fixed price for the scope it describes. A detailed cost plan is your real scope, measured on site and priced line by line, before you sign anything.

In November 2026 a client came to us with four prices for the same strip-out and demolition. All four were completely different, with a huge spread. The client did not need a fifth price. The client needed someone to look at the building.

This guide explains why prices spread like that, and why paying for a detailed cost plan is often the cheapest step in a project.

We write these prices ourselves, so this is the view from the inside. A detailed cost plan is the first step of our pre-construction services. Want your project priced properly from day one? Book a site visit and detailed cost plan.

Estimate vs quote: the short difference

An estimate is an informed guess. A builder gives it after a phone call, a few photos or a short walk round. It is quick and free, and it carries no promise. The final bill can be higher.

A quote is an offer to do a defined piece of work for a fixed price. Once you accept it, that price applies to the work it describes. Anything outside that description is an extra, and extras are priced later.

A ballpark figure is an estimate with even less behind it. It is useful for one thing only: deciding whether to take a project further. It is not a budget, and nobody should sign against it.

On larger commercial work, the quote is often called a tender. The rules are the same. A tender prices the documents it was sent, and nothing more.

So the real question is not "estimate or quote". It is: what exactly is the price based on? A quote for the wrong scope is still the wrong price. That is the gap a detailed cost plan closes.

Estimate, quotation and detailed cost plan compared

All three give you a number. Only one tells you what the number buys. Here is how they differ, side by side.

Estimate, quotation and detailed cost plan compared
EstimateQuotationDetailed cost plan
What you getOne figure, often with no breakdownA total, sometimes split by tradeA price against every item of work
What it is based onA call, photos or a quick lookThe drawings or scope the builder was sentA site visit, your brief and a measured scope
How the price changesFreely: it is only a guideThrough extras outside the scopeEach change is priced against a known line
What it costs youNothingNothing, for a simple jobFrom £750 + VAT, credited if you build with us
When to use itDeciding if a project is worth exploringComparing bids on a finished designBefore you set a budget, pick a builder or sign

The estimate and the quote are free because the contractor puts little time into them. The cost plan is paid because an expert spends real time on your building. That time is where your savings come from.

What a free price really contains

Everyone starts the same way: "I'll get a few free prices." It feels sensible. But look at what a free price is made of.

Open office floor after strip-out, with ductwork and materials on pallets and the ceiling services left exposed

A contractor who prices for free invests almost no time. Nobody measures the site, lifts a ceiling tile or asks what you really need. So the number is built in one of two ways.

  1. A bulk figure. An average for "this kind of job", often one total with no breakdown at all.
  2. A price full of allowances. Provisional sums and assumptions stand in for everything nobody checked, so the total is tied to nothing.

Why so little time? Pricing is unpaid work, and a contractor does not win every job it prices. It cannot spend days on each free price. So the free price is built to be quick, not to be right.

Then you say "OK, let's go". Now the contractor looks properly. The assumptions meet the real building, and the price changes. It almost never changes downwards.

That is what happened to the client with four strip-out prices. Each contractor had priced a different idea of the job. None had priced the job the client actually had. A strip-out and demolition price is only as good as the survey behind it.

Allowances are the quiet part of every free price. Our guide to provisional sums in construction shows how to spot them and what they can hide.

Five prices for the same job: an illustration

Now scale it up. You send the same brief to ten contractors and get ten prices you cannot compare. Imagine five of them come back for the same fit-out: £100,000, £300,000, £550,000, £600,000 and £1 million.

Nobody is lying. Each contractor answered a different question. This is how it can look from the inside.

Illustration only, with invented round numbers (not real quotes and not our rates): five prices for one fit-out
PriceWhat is probably behind it
£100,000A low price to win the job: thin scope, large provisional sums, the rest added later as variations
£300,000The visible work priced from the drawings; no survey, so hidden conditions are excluded
£550,000Design, preliminaries and a full strip-out included, which the lower prices left out
£600,000A bigger scope than you need, such as renewing services that could stay
£1 millionHeavy risk loading: every unknown priced at the worst case, or a busy firm that does not want the job

Put those five numbers in front of a board, a lender or a landlord and nobody can choose. The spread is ten to one. That is not a market. It is five different jobs.

Which one is right? None of them, yet. Each is a fair answer to a brief that left too much open. Here are the seven reasons the same job gets five prices.

  1. Different scope assumed. Where the brief is silent, each contractor guesses, and each guesses differently.
  2. Exclusions. Items left out in the small print, such as waste, scaffold, making good or building control.
  3. Provisional sums. Round allowances for work nobody priced. Low ones make a total look cheap.
  4. No survey. Without a visit, hidden conditions are either excluded or priced at the worst case.
  5. Preliminaries, design and VAT. Some prices include site running costs, design and VAT; others leave them out.
  6. Risk loading. A contractor who cannot see the risk adds a cushion for it.
  7. Low now, variations later. A low price wins the tender, then the gaps come back as extras.

Look at the two prices in the middle. They are close, so they look safe. But a close pair can share the same mistake, such as both pricing services that could stay. Only a site visit tells you.

To level prices like these yourself, read why builders' quotes vary so much. For how the extras are priced after you sign, see variations in construction contracts.

What happens on a paid cost plan site visit

A paid cost plan starts where a free price stops: on site. Our estimator spends the time no free price can afford. Here is what happens, step by step.

  1. You send what you have. Drawings, photos, the lease or the landlord's rules, and any prices you already hold.
  2. Our estimator comes to site. We walk the building with you, measure it and look at what sits behind ceilings, risers and floors where we can.
  3. We talk the scope through. What you need, what you do not need, what the building or landlord requires, and what can wait.
  4. We value engineer before we price. We look for ways to get the same result for less money, while the design can still change.
  5. We price every item. Each item of work gets a quantity, a unit, a rate and a total.
  6. We take you through the plan. Line by line, with every assumption and exclusion written down.

Who should be there? Ideally the person who signs off the budget, plus whoever knows the building best. That may be a facilities manager, a landlord's surveyor or your designer.

Bring the questions you are not sure about. Can the old kitchen stay? Do we need a new ceiling everywhere? Does the landlord want the space stripped back to shell? Each answer moves the price.

The visit is a conversation, not an inspection. Some of the biggest savings come from what you tell us you do not need. A clear scope of works is the result.

What the detailed cost plan contains

A detailed cost plan is a priced list of your actual job. You can lay any other price next to it and see at once what is missing. This is what the client version shows.

What our detailed cost plan shows you
Part of the planWhat it tells you
Item of workEach task in plain words, area by area or trade by trade
Quantity and unitHow much of it there is, in m², metres or numbers
Rate and totalOur price for that item, ex VAT
PreliminariesSite set-up, management, protection and waste, each priced
Provisional sumsOnly where something cannot be priced yet, each one named
Qualifications, assumptions and exclusionsEverything the price relies on, in one list

Every line is something you can question. Too many square metres? We measure again. Do not need that item? We take it out and the total drops by that line, not by a guess.

It never shows our internal costs or margins. All prices are ex VAT, so you can add VAT once and compare like for like.

Under the surface, a cost plan follows the same logic quantity surveyors use. Our guide to how a construction cost plan is built explains the method in detail. There is an RICS-qualified quantity surveyor on our team.

Value engineering: where the plan saves money

Value engineering means getting the same result for less money. It works best before anything is ordered, which is why it sits inside the cost plan, not after it.

These are the kinds of savings a site visit can find. Which ones apply depends on your building.

  1. Strip out only what the new design needs. A ceiling grid, raised floor or partition in good order can sometimes stay.
  2. Keep services that still work. Test first; a sound system may need adapting, not renewing.
  3. Same performance, different product. An equal alternative to a named brand can cost less and do the same job.
  4. Pay for set-up once. Plan the order of works so scaffold, protection and access are paid for once.
  5. Drop what adds cost but not value. Items in a brief that nobody will notice once the space is in use.
  6. Turn risk into fact. A survey replaces a contractor's worst-case guess with a known condition.

On a strip-out, the saving can be in what stays. On a fit-out, it can be in what the brief asked for out of habit. On a refurbishment, it can be in the order of the works.

None of this lowers quality. It stops you paying for the wrong scope. Some things are never cut, such as fire safety and structure. Read value engineering in construction for what must never be touched.

The £300,000 fit-out illustration: the most expensive saving

Here is the sum as a worked illustration, not a client result. Your commercial fit-out will cost about £300,000. A detailed cost plan for it costs around £2,500 + VAT.

Finished office lounge on a high floor with a leather armchair, a green sofa and a view over the London skyline
£300,000Fit-out value in this illustration
£2,500Detailed cost plan fee, around, + VAT
£50,000 to £60,000What the plan could save if other prices were built on the wrong scope

In this illustration, the other contractors priced the wrong scope. Some priced work you do not need. Some left out work you do need, which would come back later as extras. The cost plan finds both before you sign.

If the plan saves £50,000 to £60,000, the fee pays for itself about twenty times over. Skipping it to keep £2,500 is the most expensive saving in construction.

We cannot promise that saving on your project. Every building is different. What we do promise is a price you can read, line by line.

We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

A Google User, Google reviewSee all reviews on Google

Our detailed cost plan fee: from £750 + VAT

Our detailed cost plan starts from £750 + VAT. The fee depends on the complexity and size of the project and the extent of the works.

The fee covers the site visit, the consultation with our estimator, the value engineering advice and the priced plan itself.

The team that prices your job is the team that builds it. So the plan is written to be built, not to win a tender and grow later.

If you sign the project with us, the fee is credited against the project. So if you build with us, the cost plan does not cost you extra.

At the end of the visit and the pricing, you hold three things:

  1. A priced list of your scope. Every item, quantity, rate and total, ex VAT.
  2. A list of savings. The value engineering options, each with its effect on the price.
  3. A list of what the price relies on. Every assumption and exclusion, written down.

If you build with someone else, you still keep a priced list of your real scope to hold their price against. Either way, you sign knowing what every line costs. Book a site visit and detailed cost plan.

Who a paid cost plan is not for

A detailed cost plan is not for every job. Save your money in these cases.

  1. Small jobs. We take on construction projects from £100,000. Below that, a simple written quote is usually enough.
  2. A design already priced item by item. If you hold tenders priced line by line on the same drawings, you need a comparison, not a new plan. Send it to us. We'll beat it.
  3. The "should we even do this" stage. If you only want to know whether a project is worth exploring, start with a conversation.
  4. Buyers who will only pick the lowest number. A cost plan shows the real price. If the cheapest figure is all that counts, it will not change your mind.

For everyone else, the maths is simple. The bigger the project, the more a wrong scope costs, and the smaller the fee looks next to it.

Commercial fit-outs, refurbishments, strip-outs and development schemes all start the same way. Someone has to look at the building and say what the job really is. Paying for that look is how you avoid paying for the wrong job.

It is the cheapest insurance in the project. Holding prices that do not add up? Book a site visit and detailed cost plan. We reply within one hour, Monday to Saturday, 8am to 6pm.

Frequently asked questions

What is the difference between an estimate and a quote?

An estimate is a guide price, often given after a phone call or a quick look, and it can change. A quote is a fixed price for the work it describes; extra work outside that scope is charged on top. A detailed cost plan goes further and prices every item after a site visit.

Is a quote legally binding?

An accepted quote sets the price for the work it describes. For homeowners, the Consumer Rights Act 2015 makes what a trader says or writes about a service a term of the contract, if you take it into account when you decide. Take legal advice on a dispute.

Is an estimate legally binding?

An estimate is a guide, not a fixed price, so the final bill can differ from it. Where a service contract fixes no price, the Consumer Rights Act 2015 says a consumer pays a reasonable price. Ask for any estimate in writing, with what it includes.

Do builders charge for quotes?

A quick price over the phone costs you nothing, and it is worth about as much. A detailed price, item by item, takes real time on site and at the desk, so it is charged. Ours starts from £750 + VAT and is credited if you build with us.

What is a detailed cost plan?

A document that prices your project item by item: what the work is, how much of it there is, the rate and the total. Ours is made after our estimator visits the site and talks the scope through with you, and it lists every assumption and exclusion.

How much does a detailed cost plan cost?

Our detailed cost plan starts from £750 + VAT. The final fee depends on how complex and how large your project is, and on how much work it covers.

Do I get the cost plan fee back if I build with you?

Yes. If you sign the project with us, the fee for the detailed cost plan is credited against the project, so you do not pay for it twice.

What does a provisional quotation mean?

It is a price that is not final yet. Parts of it are allowances or assumptions that will be confirmed later, so treat it like an estimate until every provisional item has a firm price.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Know the real price before you sign

Our estimator walks the site with you, cuts what you do not need and prices every item of work. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us