For marketers paid per lead
What Is a Qualified Lead? Criteria and Checks
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
A qualified lead is an enquiry that meets criteria the buyer and the marketer agreed before the campaign started. In a pay-per-lead deal, it is the only kind of lead that gets paid.
- The criteria cover who the person is, what they need, where, when, and whether they agreed to be contacted.
- A lead is checked against those criteria before it is paid. Fakes, duplicates and wrong-fit enquiries are rejected.
- MQL and SQL are in-house sales terms. In a pay-per-lead deal, the written definition is what counts.
- Most disputes start with a vague definition, so agree it in writing first.
A qualified lead is an enquiry that meets criteria agreed in advance between the buyer and the marketer. It is the right person, with a real need, in the right place, who asked to be contacted. In a pay-per-lead deal, a qualified lead is the only lead that gets paid.
This guide is written by a buyer. Craftex is a London property development and construction company, and we pay marketers per qualified lead through our pay-per-lead programme. Below is how we, and most serious buyers, define and check a lead.
Already produce leads that pass this kind of check? Book an introduction call and tell us how you work.
Qualified lead definition: the plain version
A lead is anyone who shows interest. They fill in a form, call, or send a message. A qualified lead is a lead that also meets the buyer's written criteria.
The criteria differ for every buyer and every service. A solar installer, a law firm and a builder all want different people. That is why there is no single industry definition.
What every good definition has in common is that it can be checked. "Interested in a project" cannot be checked. "Owns the site and plans to start within 12 months" can.
| Lead | Qualified lead | |
|---|---|---|
| Who | Anyone who enquired | The person the buyer wants, or the person who decides |
| Need | Some interest | A real project or purchase that fits the buyer |
| Fit | Not checked | Inside the buyer's size, place and timing rules |
| Permission | Not always clear | Agreed to be contacted by this buyer |
| Paid in a pay-per-lead deal | No | Yes, once checked |
Marketing qualified lead and sales qualified lead
Inside a company, you will hear two more terms. A marketing qualified lead (MQL) has shown enough interest for marketing to hand it to sales. It may have downloaded a guide or visited the pricing page.
A sales qualified lead (SQL) has been checked by a salesperson. It has a need, a budget and a reason to talk now. Frameworks such as BANT (budget, authority, need, timing) help sales decide.
These terms describe stages inside one company. When two companies trade leads, they are not enough. A pay-per-lead deal needs its own written definition, close to an SQL, that both sides can test.
Qualified lead criteria in a pay-per-lead deal
A good definition answers six questions. Each answer should be something the buyer can check with one call or one look at the data.
- Who. The decision-maker, or the person acting for them. Not a student, a supplier or a job seeker.
- What. A real project or purchase in the buyer's range. For a builder, that means a size floor.
- Where. Inside the buyer's area. A lead from outside it has no value to the buyer.
- When. A timeframe the buyer can work with.
- Permission. The person agreed to be contacted by this buyer, by name.
- New. Not already in the buyer's records, and not sent twice.
Point 5 matters more than most marketers think. In the UK, the ICO says consent passed to another company must "name or describe those companies". Bought-in lists can only be used for email, text or recorded calls "with very specific consent". This is general information, not legal advice; the ICO notes the guidance is under review.
Lead validation: how buyers check a lead
Validation is the check a buyer runs before paying. It is usually quick, and it follows the definition point by point.
- The contact details work: the phone answers and the email does not bounce.
- The person confirms they made the enquiry.
- The project or need fits the agreed criteria.
- The lead is not a duplicate of one the buyer already holds.
- The consent record shows the buyer's name and the time of the enquiry.
A fair deal also sets a time limit for the check. The marketer should not wait months to learn whether a lead was paid. Calls are checked the same way, against rules such as call length and area: see pay per call.
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Fake leads and lead fraud: the signs buyers look for
Every buyer who pays per lead meets fake leads sooner or later. Some come from bots. Some come from people paid to fill in forms. Some are real people who never asked to be contacted.
Common signs:
- Many forms from the same device or network in a short time.
- Names and emails that do not match, or numbers that never answer.
- People who say they never enquired.
- Leads from cashback, voucher or "win a prize" traffic, where people enquire for the reward.
- Old data resold as new enquiries.
Buyers protect themselves by banning these sources in the agreement. If your leads are real, these rules work in your favour. They keep your leads apart from junk sellers in the same programme, and they are why a careful buyer can pay properly for good work.
Rejected leads and disputes
A rejected lead is not paid. Disputes start when the marketer thinks the rejection was wrong. Almost every one traces back to a vague definition.
Write these points down before the first lead:
- The exact definition, service by service.
- How long the buyer has to check a lead.
- How the buyer tells you a lead was rejected, and why.
- How you can challenge a rejection, and who decides.
- Whether a rejected lead is replaced, credited or simply not paid.
Our article on the lead generation agreement goes through each clause. If you sell leads to several buyers, read how to sell leads as well.
Qualified lead for a construction buyer: our starting points
For Craftex, a qualified lead is a person with a real project we can deliver. Our clients are businesses, landowners, investors and developers. They need development and planning, design, construction or commercial fit-out.
These are the starting points we bring to the introduction call:
| Counts | Does not count | |
|---|---|---|
| Person | A business owner, landowner, developer or investor, or the person who decides for them | Small home jobs: kitchens, single rooms, repairs |
| Project | A real project in our sizes, in the UK | Projects outside those sizes or outside the UK |
| Consent | The person asked to be contacted by Craftex | Bought, rented or scraped data, or consent that does not name Craftex |
| Contact | A real name and details we can reach | Fake, bot or incentivised enquiries |
| New | Someone not already in touch with Craftex | An enquiry we already hold |
Our sizes are construction and fit-out from £100,000 to £10M and above, and development from about £3M GDV. The final definition for each service is written into your brief. Every lead is checked against it before it is paid.
We pay no retainer. You can run any channel we agree in the brief, and you can work from anywhere in the world. Our projects and clients are in the UK.
If your leads would pass this table, book an introduction call. Bring your channels, your sectors and a recent campaign you are proud of.