For farmers and owners of farm buildings in England
Class Q Barn Conversion: Rules and Prior Approval
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
A Class Q barn conversion turns a farm building in England into homes without a full planning application. It allows up to 10 homes and 1,000 square metres on a farm, with the council's prior approval.
- No home can be larger than 150 square metres.
- The building must have been part of a farm on 24 July 2023, or meet a 10-year test.
- Listed buildings and protected areas such as National Parks are excluded.
- The work must be finished within three years of the prior approval date.
A Class Q barn conversion turns a farm building in England into homes without a full planning application. It allows up to 10 homes and 1,000 square metres on a farm, with the council's prior approval.
The rules sit in the General Permitted Development Order 2015. This guide sets them out as they stand in November 2026. It covers England only. Scotland and Wales have their own rules.
Have barns and land around them? You can sell farm buildings and farmland to us, go into a joint venture, or keep the site while we deliver the scheme. To start, send us your site.
What a Class Q barn conversion allows
Class Q is a permitted development right. That means national law grants the planning permission, as long as the scheme stays inside set limits. It covers three things:
- Change of use. A farm building, and the land right beside it, changes to use as homes.
- An extension. A small rear extension can be added to the building.
- Building work. The works reasonably necessary to turn the building into homes.
The building must be part of an established farm, or have been part of one. The land that changes use with it is limited. It can be no larger than the area the building itself covers.
| Limit | Figure |
|---|---|
| Homes per farm, counting earlier Class Q schemes | 10 |
| Total floor space of the homes per farm | 1,000 square metres |
| Largest single home | 150 square metres |
| Rear extension depth | 4 metres |
| Time to finish after prior approval | 3 years |
Class Q barn conversion rules a building must meet
A barn has to pass every test in the Order. These are the main ones:
- The farm date. The site was part of an established farm on 24 July 2023. A site that joined a farm later needs 10 years as part of it.
- No other use since. A former farm building must not have been used for anything else since it left the farm.
- Space standard. The building must be able to meet the national space standard for homes.
- Access. The building must already have suitable access to a public road.
- Same outline. The new homes cannot go beyond the building's existing outside dimensions, apart from the rear extension.
- Limited works. New windows, doors, roofs, outside walls and services are allowed. So is partial demolition where needed.
Two rules catch owners out. If the site is let on a farm tenancy, both landlord and tenant must consent. And the right is lost if new farm buildings went up under farm permitted development in the 10 years before.
Where Class Q does not apply
Some places and buildings are excluded outright:
- Listed buildings and scheduled monuments
- National Parks, areas of outstanding natural beauty, conservation areas, the Broads and World Heritage Sites
- Sites of special scientific interest
- Safety hazard areas and military explosives storage areas
A barn in one of these places needs a full planning application.
Class Q prior approval: what the council checks
You must apply to the council before any work starts. The council does not look at the scheme from scratch. It can only check the matters the Order lists:
- Transport. The effect on roads and highways.
- Noise. The noise impacts of the development.
- Contamination. Contamination risks on the site.
- Flooding. Flood risks on the site.
- Location. Whether the siting makes a change to homes impractical or undesirable.
- Design. The design or outside look of the building.
- Light. Adequate natural light in all habitable rooms.
An extension adds one more check: its effect on the neighbours. The Order gives the council 56 days from the day it receives the application.
Conversions under permitted development are exempt from biodiversity net gain. That saves a step that full planning applications have to take.
What changed in the Class Q rules
The current Class Q text replaced the old one on 21 May 2024. Guides written before that date quote older limits. Check that any advice you read uses the figures in the table above.
Two points in the current text matter to owners:
- Former farm buildings can qualify, not only buildings on a working farm.
- The limits count all Class Q homes within the farm's original boundaries.
If you had prior approval under the old rules, ask your planning adviser which version applies to you.
Class Q or full planning permission
Class Q is a shorter route, but it is small. It converts what is there. It cannot add new buildings on the fields around the barn.
Full planning permission can do more, but it is harder to get in open countryside. National policy lists the cases where building outside a settlement should be approved. Reusing a lawful, substantial building is one of them. Our guide on whether you can build on farmland sets out the full list.
Where the barns sit next to a village, the land around them may have more potential than the barns. One route is to put the land forward in the council's call for sites.
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Selling a barn with Class Q, and how we can help
With prior approval in place, a buyer knows homes are allowed. The three-year deadline still runs, so tell buyers the approval date.
Craftex is a London-based property development and construction company. We buy and develop sites across England. Class Q schemes are small. We look at them when several buildings or more land come together. There are three ways to work with us:
- We buy it. We buy the land or buildings, with or without planning permission.
- Joint venture. You put in the site. We bring the planning, the build and the sales, and we share the result as agreed.
- We deliver it for you. You keep the land. We take the scheme from planning through building to sales for a fee.
We take on sites from about £3M GDV. GDV is the total sale value of the finished scheme. We typically take on schemes of £3M to £150M GDV, and larger schemes are welcome.
We agree terms site by site. We do not publish a price. Our team's combined experience covers 11,127 homes taken through planning. See the land and buildings we buy for other kinds of site.
We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day. One next step: send us your site.
Class Q checks before you apply or sell
- The building was part of a farm on 24 July 2023
- No farm tenancy, or written consent from landlord and tenant
- No new farm buildings under permitted development in the last 10 years
- Not listed, and not in a protected area
- Existing access to a public road
- Homes of no more than 150 square metres each
- No more than 10 homes and 1,000 square metres across the farm