Skip to content
Request a callbackCallback

Farmland, fields and barns

Sell agricultural land or farm buildings

Farm in England and thinking about selling agricultural land, a field or old farm buildings? You can sell it to us, go into a joint venture with us, or keep it and let us take it through planning, building and sales.

Craftex is a London-based property development and construction company. We take on schemes from about £3M GDV. Most are between £3M and £150M GDV, and larger schemes are welcome, with no upper limit: sites for 100, 500 or 1,000+ homes are exactly what we want. 50+ homes is our preference.

We reply within one hour, Monday to Saturday, 8am to 6pm.

Hedged green fields with sheep above a stone barn and farm sheds, in England

What farmland do we look for?

What
SizeSchemes from about £3M GDV. We typically take on £3M–£150M GDV. Larger schemes are welcome: there is no upper limit. GDV is what all the finished homes or buildings would sell for.
Best fit50 or more homes. Large schemes of 100, 500 or 1,000+ homes are welcome.
WhereEngland only.
PlanningWith planning permission or without it. Refused or expired permission is fine too.
WhatLand, buildings and roof space.
Who can send a siteThe owner, an agent, an introducer, a receiver or a lender.
Best placesFields on the edge of a town or village. Land next to existing homes or near a station.
Farm buildingsBarns, yards and old farm buildings, on their own or with the land around them.

Is this your land?

Five examples of land that farmers and landowners send us. They are examples, not our finished projects.

  • Fields on a village edge

    A few fields next to existing houses. Room for 100 or more homes.

  • One field by the road

    A single field with its own way in, next to the last houses of a town.

  • A farmyard with old barns

    Barns and sheds no longer needed for farming, with a paddock beside them.

  • Land near a station

    Pasture or arable land within a walk of a railway station.

  • A large holding by a town

    Land that could take several hundred to 1,000+ homes over time.

Three ways to work with us

Three routes, side by side. Your land can stay in use while planning is worked on, as agreed.

We buy itJoint ventureWe do it for you
In plain wordsYou sell us the land or building.You put in the land. We put in the work. We share what the scheme makes, as agreed.You keep the land. We run planning, building and sales for you as a turnkey service.
Who pays for planningWe do.Shared, as agreed.You do. We run it.
When you are paidOn completion of the sale, or when planning is granted if the sale is subject to planning.From the scheme's profit, as agreed.You keep the profit. We are paid a fee.
Who carries the riskWe do.We share it, as agreed.You do. We manage it for you.
Who keeps the upsideWe do. Your price is agreed first.Both of us, as agreed.You do.
What you doSend the site. Agree the sale with your solicitor.Agree the plan and the big decisions with us.Approve the key decisions. We do the rest.

More on a joint venture and on development management, which is the route where we do it for you. We can also buy through an option or promotion agreement.

Can farmland get planning for homes?

Sometimes. It depends mostly on where the land is. These points come from national planning policy, published on 17 August 2026 (GOV.UK).

  • Inside a town or village

    National policy says building inside a town or village should be approved unless the harm would be much greater than the benefits.

  • Outside a town or village

    Only some kinds of building should be approved. They include homes within a walk of a well-connected station.

  • Where the area is short of homes

    Homes can also be approved where the council cannot show enough housing land, and the site sits well next to a town or village.

  • Getting into the local plan

    Councils ask owners to put land forward. See how a call for sites works.

Old timber barn in a meadow with cattle grazing beside it

Barns and farm buildings

Some farm buildings can become homes without a full planning application. The rule is called Class Q (legislation.gov.uk).

It allows up to 10 homes and 1,000 square metres in total on one farm. No home may be larger than 150 square metres.

The council must give prior approval first. The right does not apply to listed buildings, or in places such as National Parks and conservation areas.

Class Q schemes are small. We look at them when several buildings or more land come together.

Option, promotion or a sale?

These are market ranges that others have published. They are not our terms.

Type of dealWhat usually happens in the marketWho says so
Option agreementThe developer gets the right to buy later. It usually runs for five to 10 years. The price is usually a pre-agreed discount to open market value.Savills, July 2024
Option priceOne law firm puts it at 75% to 90% of open market value.Michelmores, February 2023
Promotion agreementA promoter pays the costs at the start, wins planning and the land is then sold. It is not uncommon for one to last ten years or more.Lodders Solicitors, August 2026
Promotion feeOne law firm puts it at 10% to 25% of the sale price after deductions.Michelmores, February 2023

Read more: option, promotion agreement or joint venture, how an overage clause can pay you again later, and how we work on an option or promotion agreement.

We agree terms site by site. We do not publish a price.

Tax points for farmers

This is general information, not tax or legal advice. Ask your accountant or solicitor. More in our guide to Capital Gains Tax on a land sale.

  • Inheritance tax relief

    From 6 April 2026, full relief covers the first £2.5 million of farm and business property. Above that, relief is 50% (GOV.UK).

  • Husband, wife or civil partner

    Any part of the £2.5 million allowance that is not used can pass to the surviving spouse or civil partner (GOV.UK).

  • Capital Gains Tax

    People pay 18% or 24% on a gain, depending on their income. The first £3,000 of gains in the 2026 to 2027 tax year is tax-free (GOV.UK).

What can stop farmland

We check these early. None of them is a reason not to send your land.

  • Open countryside

    A field far from any town, village or station is unlikely to get planning for homes.

  • Green belt

    Many farms sit in the green belt, where extra rules apply. See our page on green belt and grey belt land.

  • The way in

    The land needs a way in from the road. A strip owned by someone else can block it.

  • Tenants and rights

    A farm tenancy, a footpath or a right for others to cross the land must be dealt with in the deal.

What happens after you send your land

01

Send the address

Fill in the short form: the address or postcode, and a line about the site.

02

We reply

We reply within one hour, Monday to Saturday, 8am to 6pm.

03

We look and call you

We look at planning, size and value. Then we call you.

04

You get the routes in writing

We set out which of the three routes fits your site, in writing.

Send us your site

Tell us where it is and what it is. All enquiries are confidential.

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Tell us about your site in the message box: address, what it is, what you have in mind. You can send plans by email or WhatsApp afterwards.

Other sites we buy

Or see everything we take on, and how to sell land to a developer.

Craftex

10 years on the market,
trading since 2016

Combined team experience

  • 11,127homes taken through planning
  • £228Mland acquired for development
  • 561major construction projects delivered
  • 834design projects delivered

Who you will talk to

Sviatoslav Jerdetchii, our founder, and Robert Barton, our Development Director, look at the sites that come in. Our Development Director's record: 3,985 homes delivered. Work in hand: a rooftop scheme on an occupied block in Islington, now at pre-application.

  • in

Agents and introducers

Have a client with land or a building in England? Send us the site, or register the introduction first.

On land, a building or a development deal, you earn 5–10% of the deal value, paid on exchange.

Guides for farmers and landowners

Selling farmland: your questions

How do I sell farmland to a developer?

Send us the address or a postcode and a line about the land. We look at where it sits, what could be built and what the council's plan says. Then we call you and set out the routes in writing: we buy it, a joint venture, or we run planning and building for you. Use your own solicitor and land agent for the deal.

What is my agricultural land worth to a developer?

It depends on whether homes could be built there, how many, and how sure the planning is. Farmland with a real chance of planning is worth more than farmland without one. We do not publish a price. We agree terms site by site.

Can I keep farming the land while planning is sought?

Yes, as agreed. Planning on farmland can take years. In most cases you carry on farming or letting the land until it is needed. What stays in use, and for how long, is written into the agreement.

Can I sell just one field?

Yes, if the field has its own way in from the road, or one can be agreed across the rest of the farm. Tell us which field, and what you want to keep, such as the farmhouse and the yard.

Do you buy barns with Class Q approval?

We look at them. A Class Q scheme on its own is small, at most 10 homes on one farm, so it is often below our size. It fits us when several buildings come together, or when there is more land around the barns that could be built on.

What happens to inheritance tax relief if I sell?

Relief for farm property depends on what you own and how it is used when it passes on. Selling land, or agreeing an option over it, can change the position. We cannot advise on tax. Speak to your accountant before you sign anything.

Do you buy farmland outside the South East?

Yes. We buy and develop land anywhere in England, not only near London. We do not buy in Scotland, Wales or Northern Ireland.

Do you buy land without planning permission?

Yes. Most sites we see have no planning permission yet. We can buy the land outright, agree to buy it once planning is granted (a sale subject to planning), or take an option, which is a right to buy it later. In those cases we pay for the planning work. You can also keep the land and have us run the planning for you.

Is my site big enough?

We take on schemes from about £3M GDV. That means the finished homes or buildings would sell for about £3M or more in total. Most of our schemes are between £3M and £150M GDV, but that is not a cap: larger sites, for hundreds of homes or 1,000+, are welcome. Our best fit is 50 homes or more. A smaller site can still work if neighbouring plots are sold together. If you are not sure, send it.

Do you buy sites outside London?

Yes. Our office is in London, and we buy and develop sites across England: towns, villages, city edges and open land. Send us the address or postcode and we will tell you if the site fits.

Can I keep my land and still develop it?

Yes. That is our third route. You keep the land. We run the planning, the design, the building and the sales for you as one team, and we are paid a fee. You keep the profit and you approve the key decisions. It suits owners who want to keep the land and the result without running the scheme themselves.

What does it cost me to send a site?

Nothing. There is no fee to send us a site and no fee for our first look at it. You do not have to sign anything to ask. If the site fits, we set out the routes in writing and you decide whether to go further.

Is my enquiry confidential?

Yes. All enquiries are confidential. Your details are used only to answer your enquiry, as our privacy notice says. We do not make your site public.

I am an agent or introducer. Is my introduction protected?

Yes. Register the introduction with us in writing before we contact the owner. It is then registered to you for 12 months. What you earn and when it is paid are set out on our page for land agents and in the referral terms.

Not sure if your site fits? Send it anyway.

It costs nothing to ask. We tell you plainly which route fits, or that none does.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us