For farmers and landowners in England
Can You Build on Farmland? Rules in England
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
Yes, you can build on farmland in England, but homes need planning permission. Farm buildings can often go up under permitted development, and national policy allows housing on farmland only in set cases.
- Farming itself needs no planning permission. Building homes does.
- Farms of 5 hectares or more can put up farm buildings under permitted development.
- Some barns can become homes under Class Q, with the council's prior approval.
- Land next to a town or village has the best chance of planning for homes.
Yes, you can build on farmland in England, but homes need planning permission. Farm buildings can often go up under permitted development. National policy allows housing on farmland only in set cases.
This guide sets out what you can build, what the council will ask, and where homes have a real chance. It covers England, under the national planning policy of 17 August 2026. Scotland and Wales have different rules.
Own fields near a town or village? You can sell agricultural land to us, go into a joint venture, or keep it while we deliver the scheme. To find out what fits, send us your land.
What you can build on farmland without full planning
Planning law treats farming and building differently. Using land for agriculture is not "development", so it needs no planning permission. Putting up a building is development.
For farm buildings, the rules give a shortcut called permitted development. It grants planning permission nationally, within limits.
| Rule | What it allows | Main limits |
|---|---|---|
| Part 6 Class A | Farm buildings and works on units of 5 hectares or more | Needed for farming; building up to 1,500 square metres; never a home |
| Part 6 Class B | Extending or altering farm buildings on units of 0.4 to 5 hectares | Needed for farming; never a home |
| Part 3 Class Q | Turning a farm building into homes | Up to 10 homes; council's prior approval |
| Part 3 Class R | Turning a farm building to business use | Listed uses only, such as storage or a hotel |
Not one of these lets you build a new house in a field. Our guide to the Class Q barn conversion rules covers the one route that creates homes.
When you can build homes on farmland: national policy
New homes on farmland need planning permission from the council. The council decides using its local plan and the National Planning Policy Framework (NPPF).
The NPPF splits land in two. Inside a settlement, policy S4 says proposals should be approved unless the harm would substantially outweigh the benefits. Outside settlements, policy S5 says only certain forms of development should be approved.
Most farmland is outside a settlement. These S5 cases matter most for housing:
- Allocated land. The local plan has allocated the land for development.
- Unmet need. There is an evidenced unmet need, and the land is physically well related to a settlement.
- Near a station. The land is within reasonable walking distance of a well-connected station.
- Previously developed land. The site is being redeveloped.
- Limited infilling. The plot fills a gap within a group of houses.
- Existing buildings. A lawful, substantial building is reused or replaced.
For housing, unmet need has a set meaning. The council cannot show five years of housing sites, or its Housing Delivery Test result is below 75%.
Grazing land, arable land and paddocks
Planning law does not treat grazing land and arable land differently. The legal meaning of agriculture includes grazing land and meadow land. So the answer to "can you build on grazing land" is the same as for a wheat field.
What does differ is the quality of the soil. The NPPF defines the "best and most versatile" farmland as grades 1, 2 and 3a. Proposals must consider whether land is in those grades. Where a lot of farmland is needed, poorer quality land should be used where possible.
A paddock used only for grazing counts as agriculture. Other uses of a paddock can need planning permission, so ask the council first.
How farmland gets allocated for building
Allocation in the local plan is the surest route. Councils ask owners to put land forward when they write a new plan. This is the call for sites.
You send a plan of the land and say what it could take. The council then assesses each site. Our guide to the call for sites explains the forms and the timing.
Making the case costs money, and it is a long road. Savills says strategic land projects can take 10 years or more.
A developer or promoter can pay for it. Savills says an option with a developer usually runs for five to 10 years. The developer applies for planning at its own cost.
What to check before you build on farmland yourself
Building homes yourself is possible, but it is the hardest route. Check these points first:
- Where the land sits. Inside or next to a settlement, or in open countryside.
- Green Belt. Green Belt land has extra tests. See our guide to grey belt land.
- Access. The council will ask how traffic gets in and out safely.
- Soil grade. The council will ask whether the land is grade 1, 2 or 3a.
- Tenancies. A farm tenant has rights that affect what you can do.
If the land passes these checks, the next step is a planning application. Our guide on what you can build on your land goes through it.
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Selling farmland to a developer, or building with one
Craftex is a London-based property development and construction company. We buy and develop sites across England. There are three ways to work with us:
- We buy it. We buy the land, with or without planning permission.
- Joint venture. You put in the land. We bring the planning, the build and the sales, and we share the result as agreed.
- We deliver it for you. You keep the land. We take the scheme from planning through building to sales for a fee.
We take on sites from about £3M GDV. GDV is the total sale value of the finished scheme. We typically take on schemes of £3M to £150M GDV, and larger schemes are welcome. Village-edge farmland for 100 or more homes is a typical site.
We agree terms site by site. We do not publish a price. Our team's combined experience covers 11,127 homes taken through planning and £228M of land acquired for development.
We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day. Not farmland? Send us your site of any kind. One next step: send us your land.
What to send us about your farmland
- The address, postcode or a plan of the fields
- The Land Registry title number, if you have it
- The size of the land in acres or hectares
- How the land is used now, and any tenancy
- The nearest town, village or station
- Any planning history or call for sites entry