Skip to content
Request a callbackCallback

For marketers in construction and property

Construction Lead Generation: What Works for Marketers

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Scaffolding on a building in a London street at dusk, with a tower crane behind

The short answer

Construction lead generation works when campaigns reach the person who funds or decides a project, and filter out small jobs before the form. The offer and the filters matter more than the channel.

  1. The buyers are developers, landowners, businesses fitting out space and landlords, not only homeowners.
  2. Search catches people already looking; social and LinkedIn reach owners before they search.
  3. A landing page should ask for project type, size, location and timing.
  4. Judge cost per lead against what one project is worth, not against cheap consumer leads.

Construction lead generation works when campaigns reach the person who funds or decides a project, and filter out small jobs before the form. The channel matters less than the offer and the filters. This guide explains what works, from the side of the business that receives the leads.

Craftex is a London property development and construction company. We work with marketers who are paid per qualified lead, on any channel we agree. So we see which campaigns bring real projects and which bring noise.

If you already run construction campaigns well, book an introduction call.

Who buys construction projects

Most construction marketing aims at homeowners. The larger projects come from a different set of people:

  1. Developers who need design, planning and a builder for a scheme.
  2. Landowners with a site or a building to sell or develop.
  3. Businesses fitting out offices, restaurants, hotels, shops or clinics.
  4. Landlords and managing agents who need works between tenants.
  5. Investors who buy, convert and refurbish buildings.

Each one searches and reads differently. A developer looks for development and planning support. A business owner looks for a commercial fit-out. A landowner may simply want to sell land to a developer. Pick one buyer per campaign.

How construction leads differ

Construction leads are not like consumer leads. Four things change the way you work.

  1. Value. One project can run from £100,000 to £10M and above. A few good leads matter more than many weak ones.
  2. Time. Projects need surveys, design, prices and sometimes planning before anyone signs.
  3. Few buyers. The number of people who can commission a large project is small. Targeting must be precise.
  4. Size floors. Many builders have a minimum project size. A lead below it is worth nothing to them.

This is why buyers check construction leads carefully, and why the definition must be agreed first. Our guide to the qualified lead shows how.

Construction lead generation channels

Every channel can work. What differs is the stage the buyer is at, and how much filtering the leads need. Search catches people who already know they need a builder or a designer. Social and LinkedIn reach owners earlier, before they search. Content works slowly, but it brings people who have read your page and trust it.

Channels for construction leads
ChannelReachesGood forWatch out for
Google and Microsoft searchPeople already looking for a serviceFit-out, design and build, planningSmall jobs, job seekers, competitor names
SEO and contentPeople researching before they buyCost guides, planning questions, land salesTakes months to build
Meta (Facebook, Instagram)Owners before they searchLandowners, property owners, local businessesCasual enquiries: filter hard
LinkedInDecision-makers by job titleDevelopers, facilities managers, finance directorsFewer leads, each costs more
YouTube and short videoPeople who want to see the workShowing finished projects and the processNeeds strong footage
Email to opted-in listsPeople who agreed to hear from youProperty and business audiencesConsent must be real

With Craftex, the channels are agreed in your brief. Paid, organic or both.

Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

Hainro Eybers, Google reviewSee all reviews on Google

Landing pages that qualify

A landing page for construction should do two jobs. Convince the right person, and politely turn away the wrong one.

Ask for the facts a buyer needs before the first call:

  • Project type: fit-out, new build, conversion, land sale.
  • Size: floor area, number of homes or a budget band.
  • Location: the town or postcode.
  • Timing: when they want to start.
  • Role: owner, developer, tenant, agent.

Each question lowers the number of leads and raises their value. A buyer would rather call five owners with real projects than fifty people with a broken fence. State the minimum project size on the page. People with small jobs will leave, and that is the point.

Cost per lead against project value

Marketers used to consumer leads often judge construction leads by the wrong number. A lead that looks expensive can be cheap if it becomes a large project.

A buyer thinks about two things: what one project is worth to them, and how many of your leads become projects. Those two numbers set a fair price per lead. They differ by service, which is why each service gets its own price in a good brief.

Test first. A short campaign shows how your leads convert, before either side commits to volume. Then agree the price in writing. The pay per lead affiliate programmes list shows how other programmes set their terms.

Mistakes that produce junk construction leads

Most junk construction leads come from the same few mistakes:

  1. Broad keywords that attract job seekers, students and suppliers.
  2. Offers aimed at homeowners with small repairs, sent to a buyer of large projects.
  3. Incentivised traffic: prizes, cashback or "free" offers that attract people with no project.
  4. Bidding on the buyer's own name, so you are paid for people who were already coming.
  5. Bought or scraped lists, where people never asked to be contacted.
  6. Ads that promise prices or results the buyer never agreed.

The last point is not only a quality issue. In the UK, the ASA says "both the business and the affiliate marketer are responsible" under the advertising code. A careful buyer will want to approve ads that use its name or work.

Run construction campaigns for Craftex

We pay per qualified lead for construction, design and development clients in the UK. Our clients are businesses, landowners, investors and developers, not homeowners after a kitchen, a single room or a small repair.

The process: an introduction call, then we look at your experience. We agree which services you cover and a brief that defines a qualified lead for each. Terms go into a written agreement before any campaign starts. There is no retainer.

You can work from anywhere in the world. What matters is that you know what you are doing. If you sell leads to several buyers, our guide on how to sell leads explains what we look for. Ready? Book an introduction call.

Frequently asked questions

How do you generate construction leads?

Pick the buyer first: developer, landowner, business or landlord. Then reach them where they search or read, with an offer that fits their project, and a form that asks for type, size, location and timing.

Do Google Ads work for construction leads?

They can, because they reach people already searching for a service. The risk is paying for small jobs and job seekers, so tight keywords, negative keywords and a filtering form matter more than the budget.

Are Facebook ads good for construction leads?

They can reach property owners and business owners before they search. The leads need stronger filtering, because people enquire more casually on social platforms. Qualifying questions on the form help.

What is a good cost per lead in construction?

There is no single figure. A fair cost per lead depends on what one project is worth to the buyer and how many leads become projects. A lead for a large fit-out can justify far more than a small repair.

How long do construction leads take to turn into projects?

Often weeks or months, because large projects need surveys, design, prices and sometimes planning. That is one reason we pay on the qualified lead, not on the signed project.

Can I run construction campaigns for Craftex from abroad?

Yes. Partners can work from anywhere in the world; what matters is that you know what you are doing. Our projects and clients are in the UK, so campaigns target UK clients.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Bring us real construction projects

Book an introduction call: your channels, your sectors and your results. We agree the services and a brief. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us