For affiliates and performance marketers
Pay Per Lead Affiliate Programmes in Construction
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
These are eight pay per lead affiliate programmes in construction, property and home improvement. We read each one's terms on its own page on 25 November 2026.
- Most pay for home-improvement leads, such as windows, roofing or heating.
- Two UK property programmes on Awin publish their price per lead: £10 (SellTo) and £25 or £40 (Bene Finance).
- Craftex pays per qualified lead for commercial construction, design and development projects, agreed in a brief.
- Before you join, check the lead definition, banned traffic, validation and payment terms.
Pay per lead affiliate programmes pay you for each lead you send, not for each sale. This list covers eight in construction, property and home improvement. We read every programme's terms on its own page on 25 November 2026, and we quote them in their own words.
One entry is ours. Craftex is a London property development and construction company, and we run a pay-per-lead programme for performance marketers. We buy leads for commercial and development projects, which no other programme here covers. If you can reach developers, landowners or businesses, that is a different and smaller market, with fewer marketers in it.
Want to talk about it now? Book an introduction call.
How we checked these programmes
We searched for programmes that pay per lead in construction, property and home improvement. Then we opened each programme's own page, or its network profile, on 25 November 2026.
The rules we followed:
- Only what the page itself says. Where a page is silent, we write "not stated".
- Figures in their own words, with the date we read them.
- No rankings by payout. Terms change, so check the current page before you start.
Some programmes we found were closed or their pages were gone, so they are not listed. Software referral schemes are left out too, because they pay for sign-ups, not for project enquiries.
Comparison table of pay per lead programmes
The table puts the eight programmes side by side. Read it for three things: what each one pays for, whether it states an amount, and which traffic it bans. "Not stated" means the programme's own page did not say on 25 November 2026. It does not mean there is no rule, so ask before you build a campaign.
| Programme | Sector | Pays for | Amount stated | Traffic rules stated | How to join |
|---|---|---|---|---|---|
| Craftex | UK construction, design, development | Each qualified lead, as defined in your brief | Set in your brief | Agreed in your brief | Introduction call |
| MyJobQuote | UK home improvement | Serviced lead, or revenue share | Not stated | No voucher, cashback, incentive or bulk email | Sign-up form |
| Anglian Home | UK windows, conservatories | Verified lead, or % of sale | Not stated | Not stated | By email |
| Bene Finance | UK business and commercial property finance | Qualified lead | £25 or £40 | No Google Ads | Awin |
| SellTo | UK homes for sale | Qualified lead, plus completion | £10, plus £1,000 | PPC and paid social with approval | Awin |
| Modernize | Home improvement trades | Lead | Varies by trade | Not stated | Application |
| HomeAdvisor | Home services | Qualified lead or call | Not stated | Not stated | CJ |
| RemodelYourHome | Home remodelling | Lead | Not stated | Not stated | Awin |
Construction and development: Craftex
Craftex is a London property development and construction company. We pay per qualified lead for clients who need construction, design or development work. Our clients are businesses, landowners, investors and developers, not homeowners after a small job.
What our programme covers:
- Development and planning, for schemes from about £3M GDV.
- Construction and commercial fit-out, from £100,000 to £10M and above.
- Architecture and interior design, land and buildings we buy, and landlord works.
How it works: an introduction call, then we look at your experience. We agree the services and a brief, which defines a qualified lead for each service. Terms go into a written agreement before any campaign starts. You run any channel we agree, and we pay per qualified lead. There is no retainer.
You can work from anywhere in the world. Our projects and clients are in the UK.
Home improvement programmes
Most programmes in this space pay for leads from homeowners. The jobs are smaller and the volume is higher.
MyJobQuote
MyJobQuote connects homeowners with tradespeople in the UK. Its page says deals are offered "per serviced lead or rev share basis", with "30 day net payments". It welcomes PPC, content, email and social media affiliates. It does not accept voucher sites, cashback sites, incentive sites or "any promotion that involves bulk email".
Anglian Home
Anglian Home sells windows and conservatories in the UK. Its page says: "We pay for each verified lead on our core products". It lists "CPL or % of Sale", "30 Day Cookie Tracking" and "Monthly or Weekly Reporting". It also runs in-house de-duping. You apply by email.
Modernize, HomeAdvisor and RemodelYourHome
These three are home-improvement programmes. Their pages do not say which countries' affiliates they accept. Modernize says: "We pay per lead for Windows, Roofing, HVAC, Solar and other trades. Pricing varies depending on set up and trade." Every affiliate must be approved.
HomeAdvisor offers "aggressive payouts for qualified leads or calls" through Commission Junction, with no amounts on its page. If calls are your channel, read how pay per call deals are checked. RemodelYourHome, on Awin, lists "Payment per Lead" and a 365-day attribution period, with no amount stated.
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Property and real estate programmes
Two UK programmes on Awin pay for property-related leads, and both publish the price.
SellTo buys homes. Its Awin profile lists "£10 for every qualified lead", plus "£1,000 additional commission for every completed property purchase". A valid lead owns a UK residential property, gives genuine details and is interested in selling. PPC and paid social are allowed "subject to approval".
Bene Finance arranges business and commercial property finance. It lists "£25 per qualified business finance lead" and "£40 per qualified commercial property lead". Its profile says "Google Ads is prohibited for this programme". It also says: "Submitting a form does not automatically make a lead payable."
That last line is true of every serious programme, ours included. Read what a qualified lead is before you start any of them.
What to check before you join
A programme can look generous and still pay little. These are the questions that decide what you actually earn:
- What exactly is a payable lead, and is it written down?
- Which traffic sources are banned?
- How are leads tracked, and for how long?
- How long does validation take, and how do you challenge a rejection?
- When and how are you paid?
- Can the programme change its terms without notice?
If a programme cannot answer these clearly, expect disputes later. Our guide to how to sell leads covers the buyer's side of the same questions.
Home improvement vs construction leads
Home-improvement leads are consumer leads. Many people want a boiler, windows or a new roof. Each lead is worth a modest amount, and they are often shared between several firms.
Construction and development leads are business leads. There are far fewer of them. Each one can be a project from £100,000 to £10M and above, or a site from about £3M GDV.
That changes how you work. You need tighter targeting, offers that speak to owners and developers, and forms that filter out small jobs. Our playbook on construction lead generation explains how. If that is the work you do well, book an introduction call.