For developers, building owners and design teams
Fire Strategy Report: What It Covers
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
A fire strategy report explains how a building keeps people safe in a fire: how they are warned, how they get out, how fire is held back and how firefighters get in. It shows building control how the design meets Part B of the Building Regulations.
- It follows the five Part B rules: warning and escape, linings, structure, outside walls and fire service access.
- It is written at design stage and read with the drawings by building control.
- A planning fire statement and a fire risk assessment are different documents.
- Our fire engineers write the strategy and our builders build to it, as one team.
A fire strategy report is the plan for how a building keeps people safe in a fire. It is written while the building is designed, and building control reads it with the drawings. This guide explains what it covers, who needs one and how to get it.
Our engineers write the fire strategy for new buildings, extensions and changes of use, and our builders build to it. Planning a scheme? Discuss your scheme with us before the drawings are fixed.
What a fire strategy report is
The Building Regulations set five fire safety rules, called Part B. A fire strategy report shows, one rule at a time, how your design meets them. It ties the drawings, the materials and the alarm and escape design into one story.
The government's guidance on Part B is Approved Document B. It comes in two volumes: one for dwellings and one for buildings other than dwellings. Our guide to Approved Document B explains both.
Approved Document B says fire safety engineering may be the only practical way to reach a good standard in some complex buildings. It names buildings that mix different uses. In those cases the fire strategy carries most of the weight.
What a fire strategy report covers
Each section of the report answers one of the five Part B rules. The table shows what each rule asks and what the strategy sets out for it.
| Part B rule | What the strategy sets out |
|---|---|
| B1 Warning and escape | Alarms and detection, escape routes, stairs, travel distances and exits |
| B2 Linings | Which wall and ceiling finishes are allowed in each space |
| B3 Structure | How long the frame must stand, and where walls and floors hold fire back |
| B4 Outside walls | How the walls and roof stop fire spreading over the building or to the next one |
| B5 Fire service access | Where fire engines park, firefighting stairs, fire mains and water supply |
A good report also lists the fire doors, the fire stopping around pipes and cables, and what the building manager must keep working. A strategy for an existing building also records what was found and kept.
Fire strategy drawings
The drawings carry the strategy onto site. They are the architect's plans, marked up by the fire engineer. A builder can see at a glance what each wall, door and ceiling must do.
- Escape routes. Arrows from every room to a final exit, with the travel distance.
- Fire walls and floors. Lines showing which walls and floors hold fire back, and for how long.
- Fire doors. Every fire door, with its rating and whether it closes by itself.
- Alarms and detection. Where detectors, call points and sounders go.
- Fire service access. Where firefighters enter and where the fire main inlets are.
Drawings and report must say the same thing. When they disagree, the builder has to guess. Our fire engineers and architects check one set of drawings together, so nothing is left to guess.
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Who needs a fire strategy
A new building, an extension or a change of use is building work, so it must meet Part B. Building control may ask for a fire strategy to see how.
- Developers. Blocks of flats, mixed-use schemes and conversions.
- Owners of offices, shops and hotels. Large changes to the building.
- Landlords. Turning a building into flats or a house in multiple occupation.
- Schools, care homes and clinics. People there may need help to escape.
Approved Document B changed in 2026. It now recommends more than one common stair in blocks of flats with a storey 18m or more in height. It also adds design rules for evacuation lifts in blocks of flats. Our guide to the second staircase and Gateway 2 explains what that means for a scheme.
Fire strategy, fire statement and fire risk assessment
Three documents with similar names do three different jobs. They are written at different times, for different people.
| Document | When | Who it is for | What it does |
|---|---|---|---|
| Fire statement | With the planning application | The council and the Health and Safety Executive | Covers fire safety in planning terms for relevant buildings |
| Fire strategy | During design | Building control and the builder | Shows how the design meets Part B |
| Fire risk assessment | Once the building is in use | The responsible person | Finds the fire risks to people and the precautions needed |
GOV.UK says a fire statement must go in with planning applications for relevant buildings. These are 18m or more in height, or 7 or more storeys, with two or more dwellings or educational accommodation. It covers fire safety principles, site layout, access for fire engines and water supplies.
The fire risk assessment is a duty under the Regulatory Reform (Fire Safety) Order 2005. The responsible person must make a suitable and sufficient assessment of the risks to people. We write fire strategies and fire statements; we do not carry out fire risk assessments.
Higher-risk buildings and the Building Safety Regulator
Some tall buildings go through a stricter approval route. GOV.UK calls them higher-risk buildings: at least 7 storeys or 18 metres high, with 2 or more homes, or a hospital or care home.
For these, the Building Safety Regulator approves the building work, not the council. GOV.UK says you must get building control approval from the regulator before starting. So the fire design has to be settled before work can begin.
Handing over fire safety information
The fire strategy does not end on site. Regulation 38 of the Building Regulations covers new buildings, extensions and changes of use of buildings that fall under the fire safety order. The person carrying out the work must give fire safety information to the responsible person.
The deadline is completion, or the day people move in if that comes first. The information covers the design and construction of the building and its fire safety systems. It lets the owner run and maintain the building safely, so keep the strategy and drawings with it.
What a fire strategy report costs
There is no fixed price for a fire strategy. The fee depends on the size, height and use of the building. It also depends on how far the design has got and whether the building is new. A single house extension and a mixed-use tower are very different jobs.
Our fire engineers give you a fixed fee once they have seen the drawings. Send the plans and the planned use. You know the figure before any work starts.
How our team writes your fire strategy
Our fire engineers start from the architect's first layouts, not the final set. Escape routes, stairs and fire walls are cheapest to change while they are still lines on a plan.
Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.
Our team delivered Sloane Place, a 27-key hotel and cocktail bar, and Leicester One, a 56-room scheme. Buildings like these must meet Part B on every floor. Our builders put in the fire doors, fire stopping and alarms that the strategy names, and fix anything an inspection of existing fire walls finds.
Is your design at concept, planning or tender? Discuss your scheme and our fire engineers tell you what the strategy needs to cover.
What to send us for a fire strategy
- The architect's plans, sections and elevations, in any format
- The use of each floor, and how many people it will hold
- The height of the top floor above the ground
- For an existing building: photos and any old fire documents
- Your planning and building control dates, if you have them