For developers, landlords and homeowners
Approved Document B: Fire Safety Rules Explained
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
Approved Document B is the government's guidance on meeting Part B, the fire safety rules of the Building Regulations in England. It comes in two volumes: Volume 1 for dwellings and Volume 2 for all other buildings.
- Part B has five rules: warning and escape, linings, structure, outside walls and fire service access.
- The current text is the 2019 edition with the 2020, 2022, 2025 and 2026 amendments.
- The 2026 changes add a second common stair for blocks of flats with a storey 18m or more in height.
- Our fire engineers design to it and our builders build to it, as one team.
Approved Document B is the government's guidance on fire safety in new and altered buildings in England. It explains how to meet Part B, the fire safety rules of the Building Regulations. This guide sets out what it covers, what changed in 2026 and what it means for your project.
Our fire engineering team designs buildings to Approved Document B, and our builders build them. Planning work on a building? Discuss your project and we tell you which parts apply.
What Approved Document B is
The Building Regulations 2010 set the rules. Approved Documents are the government's practical guidance on meeting them, one document for each technical part. Approved Document B covers Part B, fire safety.
It comes in two volumes. Volume 1 covers dwellings: houses and flats. Volume 2 covers buildings other than dwellings, such as offices, shops, schools, hotels and care homes.
The current text is the 2019 edition with the 2020, 2022, 2025 and 2026 amendments. It also prints the 2029 amendments, which start later. GOV.UK last updated the page on 16 September 2026.
The document calls itself one way to comply. It also says there may be other ways, which should be agreed with building control at an early stage. Fire safety engineering is one of them.
The five Part B building regulations
Part B of the Building Regulations has five rules, B1 to B5. Each one is a short legal sentence. Approved Document B turns each one into detailed guidance.
| Rule | Name | What it means |
|---|---|---|
| B1 | Means of warning and escape | People are warned early and can get out safely |
| B2 | Internal fire spread (linings) | Wall and ceiling finishes do not spread fire fast |
| B3 | Internal fire spread (structure) | The frame stands long enough, and fire is held in one part |
| B4 | External fire spread | Outside walls and roofs resist fire spreading over them or to the next building |
| B5 | Access and facilities for the fire service | Firefighters can reach the building and work inside it |
Approved Document B also covers regulation 38. That rule says fire safety information must be handed to the person responsible for the building when the work is finished.
Volume 1: dwellings
Volume 1 covers houses, flats and the shared parts of blocks of flats. For a house, the topics include smoke alarms, escape from upper floors and fire spread to the next house.
- Smoke alarms. Volume 1 says smoke alarms should be mains operated and meet BS EN 14604, with a standby power supply.
- Loft conversions. Where a conversion adds a storey above 4.5m, the whole escape route should be addressed, with fire resisting doors and partitions.
- Flats. Escape routes, common stairs, fire doors to each flat and access for fire engines.
- Sprinklers. The 2020 amendments cut the trigger height for sprinklers in blocks of flats from 30m to 11m.
Volume 1 also allows old doors with historical or architectural merit to be kept and upgraded where that works. That matters in period homes. Our guide to fire doors for flats covers the doors in more detail.
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Volume 2: buildings other than dwellings
Volume 2 is the longer book. It covers offices, shops, schools, hotels, care homes, car parks and every other building that is not a dwelling.
Its 19 sections follow the five rules. They run from fire detection and escape, through linings, structure, compartments and sprinklers, to outside walls, fire engine access and fire mains. The last section covers fire safety information for the owner.
The 2025 amendments added sprinklers in care homes. Volume 2 says care homes should be fitted with a sprinkler system throughout the building.
What changed in 2026: second stairs and evacuation lifts
The 2026 amendments made two main changes for blocks of flats. Both volumes list them.
- A second common stair. A new recommendation for more than one common stair in blocks of flats with a storey 18m or more in height.
- Evacuation lifts. Design rules that support the use of evacuation lifts in blocks of flats.
The 2029 amendments are printed in the same document. They remove the old national classes for fire resistance and take effect on 2 September 2029. Work notified before that date can stay on the earlier text, if it is sufficiently progressed within the set time.
For a scheme near 18m, a second stair can change the floor plan, the number of flats and the cost. Our guide to the second staircase and Gateway 2 shows how to test a scheme against it early.
Approved Document B and the Building Safety Act
Taller residential buildings now go through a separate approval route. GOV.UK calls them higher-risk buildings: at least 7 storeys or 18 metres high, with 2 or more homes, or a hospital or care home.
For these, the Building Safety Regulator approves the work, and approval is needed before building starts. The design still has to meet Part B. The difference is who checks it and when.
What Approved Document B means for your project
A project meets Part B in the drawings, long before anyone is on site. The cheapest time to fix an escape route or a stair is before planning.
Moving a stair after planning can mean a new application. Moving it on site can mean taking out work already built. The table shows where Part B shapes the most common projects we see.
| Project | What Part B shapes |
|---|---|
| Loft conversion | The escape route down through the house, fire doors and partitions |
| Rear or side extension | Escape from new rooms and fire spread to the boundary |
| House into flats | Fire walls and floors between flats, a protected stair, alarms |
| Office or shop fit-out | Escape routes, travel distances, linings and fire doors |
| New block of flats | Stairs, sprinklers, fire mains, fire engine access and outside walls |
A fire strategy report sets all of this out for building control. Our guide to the fire strategy report explains what goes in it.
How our team designs to Part B
Our fire engineers sit beside our architects, so escape routes and fire walls are drawn in from the first layout. Our builders then put in the doors, fire stopping and alarms the drawings name.
Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.
Our people bring combined team experience of 834 design projects and 561 major construction projects. From a loft conversion to a block of flats, discuss your project and our fire engineers tell you what Approved Document B asks of it.