Heritage Statement: What to Include and When

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 4 min read

Red brick Georgian house with sash windows and a pedimented doorway behind a round lawn

The short answer

A heritage statement describes why a historic building or place matters and how your proposal affects it. The planning rules expect one with any application that affects a heritage asset, such as a listed building or a conservation area.

  1. The NPPF asks for an assessment of significance, in proportion to the asset's importance.
  2. It should use the local Historic Environment Record.
  3. It explains the effect of the works and how harm is avoided or reduced.
  4. Our architects write it alongside the design, so the two tell the same story.

A heritage statement explains why an old building or place matters and how your plans affect it. Councils ask for one when an application touches a listed building, a conservation area or another heritage asset. This guide covers when you need one, what to put in it and how long it should be.

Our listed building architects write heritage statements alongside the design, so both tell the same story. Planning works to a historic building? Discuss your project with us first.

What a heritage statement is

A heritage statement is a short report that goes in with a planning or listed building consent application. It answers two questions. Why does this building or place matter? What will your works do to that?

The planning rules call the first part significance. Government guidance lists the kinds of interest that make up significance: archaeological, architectural and artistic, and historic. A Georgian staircase can carry architectural interest. A Victorian shopfront can carry historic interest for the street.

The NPPF's list of information needed with applications calls it a heritage impact assessment. It is also known as a heritage statement. The job is the same.

When you need a heritage statement

The National Planning Policy Framework, published on 17 August 2026, sets the rule. Development affecting heritage assets should come with an assessment of the significance of those assets. Government guidance says applicants are expected to describe that significance in their application.

  1. Listed building consent. Any works that affect a listed building's character need consent, even if planning permission is not needed.
  2. Planning permission in a conservation area. Extensions, new buildings and changes to the street front.
  3. Work near a listed building. A new building can affect the setting of the listed one next door.
  4. Sites with archaeological interest. The NPPF asks for a desk-based assessment and, where needed, a field evaluation.

Our guide to listed building consent in London explains the consent itself.

What to include in a heritage statement

A good heritage statement reads in a straight line: what is there, why it matters, what you will change and why that is acceptable. The table sets out the parts.

Old stone fireplace with a moulded surround set in a whitewashed wall
What to include in a heritage statement
PartWhat it covers
The assetWhat it is, its list entry or conservation area, its age and history
SignificanceIts archaeological, architectural, artistic and historic interest
SettingHow its surroundings add to its significance
SourcesThe Historic Environment Record, the list entry, old maps and photos
The proposalWhat will change, room by room or part by part
The effectWhat the works do to the significance, good and bad
Reducing harmHow the design avoids or lessens harm
Public benefitsWhat the scheme offers if some harm cannot be avoided

The NPPF says the local Historic Environment Record should be referred to. Government guidance says these records are open to the public. Historic England's website explains how to reach them.

Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

Rhea Langford, Google reviewSee all reviews on Google

How long a heritage statement should be

The NPPF says the level of detail should be proportionate to the asset's importance. A short note can be enough for new windows on an unlisted house in a conservation area. A full report suits a major change to a listed building.

  1. Short. A page or two: the asset, its significance, the change and its effect.
  2. Medium. Adds history, photos, the list entry and a plan of what is kept.
  3. Full. Adds research in the record office, phase plans and an archaeology report.

A longer report is not a better one. What counts is a clear case that the works respect what matters. Padding hides that case.

Harm, substantial harm and public benefits

The NPPF asks the council to identify the degree of any harm. It says substantial harm happens when a proposal would seriously affect a key element of the asset's significance.

Old brick house front with sash windows, a stone door surround and a fanlight over the door

For a designated asset, such as a listed building, substantial weight goes to its conservation. Any harm is weighed against the public benefits of the proposal. Substantial harm should be refused unless it is needed to achieve substantial public benefits.

So the statement should name each effect honestly. Show where the design keeps old fabric, and where a change is the least harmful way to make the building work.

Heritage statement and design and access statement

Government guidance says a heritage assessment can be included as part of the design and access statement. On a small scheme, one document can be clearer than two. On a large scheme, a separate report keeps the history easy to find.

Our guide to the design and access statement explains what else that document covers. There is no fee for an application for listed building consent, though the drawings and reports still cost time.

How our team writes your heritage statement

Our architects write the heritage statement while they design, not after. When the record shows a fine staircase or an old roof, the plan can keep it from the start.

Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.

Our team delivered the Gloucester Arms in Marylebone, rebuilt behind its frontage as school premises. Our team also delivered Slingsby Place in Covent Garden, a new structure behind façades that had to stay. Our builders carry the same care for old fabric onto site.

Planning works to a listed building, a church or a house in a conservation area? Discuss your project and our architects tell you what the heritage statement needs to cover.

Frequently asked questions

Is a heritage statement the same as a heritage impact assessment?

They do the same job. The NPPF's information list calls it a heritage impact assessment: an assessment of the significance of the assets affected and the effect of the proposal on it. It is also known as a heritage statement.

Do I need a heritage statement for listed building consent?

Government guidance says applicants are expected to describe the significance of any heritage asset affected. For works to a listed building, that is what the heritage statement does. Your council's validation list says exactly what it wants.

How long should a heritage statement be?

The NPPF says the level of detail should be proportionate to the asset's importance. New windows in a conservation area can need only a short note. Changing a listed building can need much more.

Is there a fee for listed building consent?

Government planning guidance says there is no fee for an application for listed building consent. You still pay for the drawings and reports that go with it.

Can the heritage statement go in the design and access statement?

Yes. Government guidance says a heritage assessment can be included as part of the design and access statement.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Want the design and the heritage statement from one team?

Our architects design the change, write the heritage statement and our builders carry out the work with care for the old fabric. Send us your project. We reply within one hour, Monday to Saturday, 8am to 6pm.