Design and Access Statement: What It Must Include

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 7 min read

Row of painted Victorian terraced houses with bay windows on a London street

The short answer

A design and access statement is a short report sent with some planning applications in England. It explains the design thinking behind the scheme and how people will get to and around it.

  1. It is required for major development, and for some building in a conservation area or a World Heritage Site.
  2. Applications for listed building consent need one too.
  3. By law it must cover five things, from the design principles to access.
  4. A change of use alone does not need one.

A design and access statement is a short report that goes in with some planning applications in England. It explains why the building looks and works the way it does. It also explains how people will reach it and move around it.

Not every application needs one. This guide sets out when it is required, what the law says it must include, and a structure you can follow. Our architects design schemes and take them through planning.

Have a scheme in mind? Send us the address. We will tell you which documents your application needs.

When a design and access statement is required

The rule is in article 9 of the Development Management Procedure Order 2015. That is the Order that sets how planning applications are made in England.

A statement is required in the cases marked yes below.

When a design and access statement is required in England
Your applicationStatement required?
Major developmentYes
In a conservation area or World Heritage Site: one or more new homesYes
In a conservation area or World Heritage Site: a building or buildings creating 100 square metres or more of floor spaceYes
Listed building consentYes
A material change of use onlyNo
Engineering or mining operationsNo
An application to change the conditions on an existing permissionNo
Waste developmentNo

"Major development" has a legal meaning. It includes any of these:

  • 10 or more homes
  • a site of 0.5 hectares or more, where the number of homes is not yet known
  • a building or buildings with 1,000 square metres or more of new floor space
  • a site of 1 hectare or more

A hectare is 10,000 square metres. So a block of 12 flats needs a statement. So does a new office of 1,500 square metres.

Your council may ask for more. Government guidance says a council can request supporting information if it is on a formally adopted local list on its website. Read that list before you apply.

What a design and access statement must include

The Order lists five things the statement must do. We give each one in plain words, with what it means for you.

  1. Explain the design principles and concepts. Say what ideas shaped the scheme. Why this height, this layout, these materials?
  2. Show how you studied the context. Context means the site and its wider setting. Show the steps you took to understand it, and how the design responds.
  3. Explain your policy on access. Say how people will get to and into the building. Show how you took account of the council's planning policies on access.
  4. State what consultation you did on access. Say who you asked, what they said, and what you changed as a result.
  5. Explain how specific access issues are dealt with. If the site has a steep slope or a narrow entrance, say how the design solves it.

Access here is not only about wheelchair users. It is about everyone who will use the place. That includes how they arrive.

Government guidance adds one more test. The detail should be proportionate to how complex the application is, but the statement should not be long.

An example structure you can follow

The law gives the contents but no template. Many people search for a design and access statement example, so here is the structure we suggest. It follows the legal list in order.

Example structure for a design and access statement
SectionWhat to put in itLegal point it answers
1. The proposalOne paragraph: what you want to build and whereSets the scene
2. The site and its settingPhotos, a site plan, the street, nearby buildings, heritageContext
3. What we learnedWhat the site study told you, as a short listContext
4. Design principlesThe ideas behind the scheme: use, amount, layout, scale, lookDesign principles and concepts
5. How the design respondsDrawings set beside the site study, point by pointHow the design takes the context into account
6. AccessRoutes to the site, entrances, levels, parking, movement insidePolicy on access
7. PoliciesThe council's access policies and how the scheme meets themAccess policies taken into account
8. ConsultationWho you asked about access and what changedConsultation
9. Specific issuesSlopes, steps, narrow entrances and the fix for eachSpecific access issues

This structure is our suggestion, not a legal form. A small scheme may cover it in a few pages. A large one needs more drawings.

The statement must match the drawings. If the statement says the entrance is level and the plan shows two steps, the planning officer will see it. Our guide to planning and building regulations drawings explains each drawing set.

Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

Hainro Eybers, Google reviewSee all reviews on Google

Listed buildings and London schemes

Two cases ask for more than the standard contents.

Listed building consent

An application for listed building consent needs its own kind of statement. Government guidance says it must explain the design principles and concepts applied to the works. It must also show how they take account of three things:

  • the special architectural or historic importance of the building
  • the physical features that justify its listing
  • the building's setting

It must cover access too, unless the works only affect the inside of the building.

If you apply for planning permission and listed building consent together, you do not need two statements. The guidance says a single combined statement should address both. Our guide to listed building conversion and consent covers the wider process.

Schemes in London

London adds a layer. The London Plan 2021 says an inclusive design statement is required as part of the design and access statement.

Inclusive design means designing so that everyone can use the place with ease and dignity. The London Plan says this part should explain how access and inclusion will be kept up over time. That includes the plan for getting people out in a fire.

Building flats in London? Our guide to the London housing design standards covers the space, light and balcony rules.

Who writes it, and what it means for your project

The law does not name an author. It is the applicant's statement, so you are responsible for what it says.

In our view, the team that designed the scheme should write it. The statement explains design decisions. Only the people who made them can explain them well.

It also helps to start early. The site study in sections two and three is the first design work on any scheme. If it is written down as it is done, the statement is half finished before the drawings are.

Three things go wrong when the statement is written last, by someone else:

  • it describes a design that has since changed
  • it skips the consultation point, because nobody kept a record
  • it reads as a sales brochure, not an explanation

Talking to the council first helps with points three and four. Our guide to pre-application planning advice explains how. If you are new to the process, start with what a planning application is.

What one design and build team changes

A statement can promise more than a builder can deliver at a sensible price. That gap shows up after permission is granted, when it is costly to fix.

We close that gap early. Our team of architects, with 50 years of experience, works beside designers, engineers and builders in one company. We draw the scheme, take it through planning, price it while it is drawn and build it under one contract. So the design the statement defends is a design we have already costed.

One example of the range. At Medusa, a beauty salon and spa in Knightsbridge, we took the design from concept to construction drawings and then built it. We also handled the planning applications for the outside signage and the outside ventilation units. The project covers 180 sq m and cost £460K. It took 17 weeks from concept to handover.

Our planning consultancy team prepares the application, and our build team prices each option before it goes in. We take on projects from £100,000 to £10M and above in construction value.

Want a second pair of eyes on your scheme? Discuss your project with us. Send the address and what you want to build.

Before you write the statement

  • The address and a site plan
  • Whether the site is in a conservation area or a World Heritage Site
  • Whether any building on it is listed
  • The number of homes, or the new floor space in square metres
  • The council's access policies and its local list
  • A record of anyone you have consulted about access

Frequently asked questions

What is a design and access statement?

Government guidance calls it a concise report that goes with certain applications for planning permission and for listed building consent. It explains how the proposal is a suitable response to the site and its setting, and shows that people can get to and use it.

When is a design and access statement required?

In England it is required for major development. It is also required in a conservation area or a World Heritage Site where the scheme provides one or more homes, or a building with 100 square metres or more of new floor space. Applications for listed building consent need one as well.

Do I need a design and access statement for a house extension?

Only if it falls in one of the legal cases. In a conservation area or a World Heritage Site, that means building that creates 100 square metres or more of floor space. Elsewhere, it means major development, such as 1,000 square metres or more. Your council's local list can ask for more, so check it.

Do I need a design and access statement for a change of use?

No. The Order says the requirement does not apply to an application for a material change in the use of land or buildings. If the scheme also includes new building, look at that part against the rules.

How long should a design and access statement be?

There is no page count in the law. Government guidance says the level of detail should be proportionate to the complexity of the application, but the statement should not be long.

Who writes the design and access statement?

The law does not name an author. It is the applicant's statement, so the applicant is responsible for it. In our view the team that designed the scheme should write it, because it has to explain the design decisions.

Can one statement cover planning permission and listed building consent?

Yes. Government guidance says that where the two applications are made together, a single combined statement should address the requirements of both.

Does this guide apply in Scotland, Wales or Northern Ireland?

No. It covers England only. The Order we quote is the Development Management Procedure Order for England.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

A building you want to design and get through planning?

Send us the address and your plan. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us