For dental practice owners planning a new or refitted surgery
HTM 01-05: Dental Surgery Design That Complies
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 8 min read
The short answer
HTM 01-05 is the Department of Health guidance on cleaning and sterilising instruments in primary care dental practices in England. For the building, it asks for a dirty to clean route for instruments, and a separate decontamination room as best practice.
- The current edition is the 2013 edition. It is published on NHS England's website.
- It has two levels: essential quality requirements, which every practice should meet, and best practice.
- For new premises it advises the full best practice provisions wherever reasonably practicable.
- The preferred layout is two rooms: one for dirty work and one for clean work.
HTM 01-05 is the guidance dental practices in England follow for cleaning and sterilising instruments. It also shapes the building. It asks for a clear route from dirty instruments to clean ones, and it prefers a separate decontamination room.
This guide explains what HTM 01-05 means for the design of a dental surgery. Our healthcare architects and our clinic build team work as one company, so the layout is priced while it is drawn.
Planning a new surgery or a refit? Send us your floor plan. We will tell you where the decontamination room can go.
What HTM 01-05 is and who it applies to
HTM stands for Health Technical Memorandum. These are government guidance documents on the buildings and equipment used for healthcare.
HTM 01-05 has the full title "Decontamination in primary care dental practices". Decontamination means making used instruments safe to use again. That covers cleaning, checking and sterilising them.
Primary care dental practices are the high street dentists most people visit. The guidance says it is for all primary care dental providers, including salaried dental services.
| Point | What the document says |
|---|---|
| Full title | Health Technical Memorandum 01-05: Decontamination in primary care dental practices |
| Edition | 2013 edition. First published 2009, second edition 2013 |
| Written by | The Department of Health |
| Document purpose | Best practice guidance |
| Where to read it | NHS England's website |
| How often to audit | Every six months, using an audit tool |
The document does not stand alone. It says all dental practices must be registered with the Care Quality Commission, known as the CQC. The CQC is the regulator of health and care services in England.
Essential quality requirements and best practice
HTM 01-05 sets two levels. This is the part most owners ask about, so here is exactly how the document puts it.
Essential quality requirements are the base level. The document says every practice should be capable of meeting them. They include clean, sterilised instruments, safe storage, an audit every six months and a written plan to move towards best practice.
Best practice is the full level. To show best practice, the document asks for further improvements in three main areas.
- A washer-disinfector. This is a machine that washes and disinfects instruments. The cleaning should be done in a validated automated one.
- A separate decontamination room or rooms. The space should be clearly separate from the treatment area and used for this purpose only. Access is limited to the staff who do the work.
- Separate storage. Sterilised instruments are stored away from the treatment area, in a simple, carefully designed space.
| Question | Essential quality requirements | Best practice |
|---|---|---|
| Where is decontamination done? | The area may be in, or next to, a clinical room | In a room or rooms clearly separate from the treatment area |
| How are instruments cleaned? | Manual cleaning or an ultrasonic bath may be used | A validated automated washer-disinfector |
| Where are clean instruments stored? | Protected from contamination, with time limits | In a storage area clearly separate from the treatment area |
| What else is needed? | A plan to move towards best practice | The plan has been carried out |
The document gives no date by which a practice must reach best practice. It says no schedule is provided for the present.
Decontamination room layout and flow
One rule runs through the whole layout. Instruments move one way, from dirty to clean. A used instrument should never cross the path of a sterilised one.
HTM 01-05 shows three example layouts in its figures.
- Decontamination in the treatment room. This is the layout for essential quality requirements. The reprocessing area should be as far from the dental chair as practicality allows.
- One decontamination room. A single room, set out so the work runs from dirty to clean.
- Two decontamination rooms. One room for dirty work and one for clean work.
For new premises, or a major change to existing ones, the guidance recommends separating decontamination from the clinical area. It calls two separate rooms the preferred option.
What goes where in the room
The document lists key design points. We have put them in the order the instruments travel.
| Step on the route | What the guidance asks for |
|---|---|
| Worktops | Preferably a single run of sealed, easily cleaned worktops |
| Setting down | A bench area set aside for used instruments and used for nothing else |
| Washing and rinsing | Two dedicated sinks, or one sink unit with two bowls. These sinks are not for washing hands |
| Washer-disinfector | Where a double-ended machine is used, it can be built into the wall between the dirty and clean areas |
| Inspection | A dedicated clean bench with good task lighting |
| Sterilising | The steriliser sits well away from the other activities |
| Unloading | The steriliser is unloaded into another clean, well-lit area |
| Hand washing | A separate wash-hand basin for staff, clearly apart from the instrument sinks |
| Air | Where possible, air moves from the clean end to the dirty end |
With two rooms, the guidance says a transfer hatch between them would help. A hatch lets staff pass instruments through the wall without carrying them round.
Surgery finishes, ventilation and hand washing
The guidance also covers the surfaces and the air in the surgery and the decontamination area. These points decide what the builder has to install.
- Work surfaces. They should be impervious and easy to clean. Impervious means liquid cannot soak in. Joints should be welded or sealed.
- Floors. Floors should be impervious and easy to clean, with welded or sealed joins. The floor should curve up the wall, so dirt cannot gather in the corner.
- No carpet. The document says carpets should not be used in clinical and decontamination areas, even if washable.
- Wash-hand basins. The basin should have no plug and no overflow. It should have a sensor or lever mixer tap. The tap should not run straight into the drain hole.
- Ventilation. Air should be supplied where people work, and heat from the equipment taken away. The airflow should run from clean to dirty.
On ventilation, the guidance is practical. It says through-wall fan and extract units will often be useful. It does not recommend free-standing or ceiling-mounted fan units.
It also advises practices to consult a heating and ventilation engineer before choosing a mechanical system. Our MEP design and installation team does this work. MEP means the mechanical, electrical and plumbing services in a building.
Holistic therapy space fit-out Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.
CQC inspection and the building
The CQC does not inspect against HTM 01-05 alone. It inspects against its own regulations.
The CQC says it considers the decontamination room or area when it reviews whether a practice is safe. It links this to two regulations: regulation 15 on premises and equipment, and regulation 12 on safe care and treatment.
It names HTM 01-05 as the professional guideline. It also accepts that buildings differ. A lack of space, or the rules for a listed building, can make a separate room impossible.
Where instruments are cleaned in the treatment room, the CQC expects reasonable steps to lower the risk to patients. One is to keep the reprocessing area as far from the dental chair as possible.
Our guide to CQC requirements for a clinic fit out covers the premises rules room by room. If you are changing a house into a practice, read how to convert residential to commercial use first.
Planning the fit-out programme
A decontamination room is small, but it fixes a lot. It needs drains, water, power and extract air in the right places. Those are hard to move once the walls are up.
So the order of decisions matters:
- Count the surgeries. The number of treatment rooms sets how many instruments pass through each session.
- Choose the level. Decide with your infection control lead whether you are designing to best practice. For new premises, the guidance advises that you do.
- Place the room. Put it where every surgery can reach it without crossing the waiting area.
- Draw the route. Mark the dirty end, the clean end and the direction of air.
- Fix the services. Set the sinks, drains, machines and ventilation before the walls and ceilings are priced.
- Then design the rest. Reception, waiting space and finishes follow. Our guide to clinic interior design covers them.
Some buildings will not take two rooms. The guidance accepts that. It says best practice may not be achievable where building alterations are restricted.
What one design and build team changes
Most surgery projects have a designer, a builder and an equipment supplier. Each one waits for the other. The decontamination room sits in the gap between them.
We work in a different way. One team draws the layout, prices it while it is drawn and builds it under one contract. The person who draws the sinks sits beside the person who prices the drainage.
Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders. Our team designs and builds dental surgeries, consulting rooms and treatment rooms, and plans the decontamination route from the first sketch.
One published example of our design and build is Medusa, a beauty salon and spa in Knightsbridge. We took the design from concept to construction drawings, then built it. It covers 180 sq m over four levels and cost £460K. It took 17 weeks from concept to handover.
We do not publish a price for a dental surgery here. Our clinic and dental surgery fit out page has a cost calculator based on our 2026 London rates. Your fixed figure comes after a survey.
Ready to test your layout? Discuss your surgery with us. Send the floor plan and the number of treatment rooms.
Before you brief a designer
- A floor plan of the building, with the drains marked if you know them
- The number of surgeries now, and the number you want in five years
- Whether you are designing to best practice
- The decontamination machines you plan to buy, with their sizes
- Whether the building is listed or in a conservation area
- Your target opening date