For owners and buyers in England
Convert Residential to Commercial: Planning Steps
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 8 min read
The short answer
To convert residential to commercial use in England, you generally need planning permission from the council. The permitted development rules have no class that turns a house into a shop, office or surgery.
- A house is Class C3. Shops, offices, cafes, clinics and nurseries are Class E.
- A doctor's or dentist's surgery is Class E(e): medical or health services.
- The council decides against its local plan. Parking, traffic, noise and neighbours' privacy can all count.
- The building work must meet building regulations. A surgery that carries on a regulated activity must also register with the Care Quality Commission.
You can convert residential to commercial use in England, but not without asking. A house that becomes a shop, an office or a surgery needs planning permission from the council. The building work has its own rules too.
This guide gives the steps in plain words. It covers houses and flats in England. Our team handles change of use planning permission and prices the building work before you apply.
Have a property in mind? Get a free route check. Send us the address and what you want to use it for.
How to convert residential to commercial use: the steps
The order matters. Each step can save you paying for the next one too early.
- Name the new use. A shop, an office and a surgery are treated in different ways. Write down exactly what will happen in the building.
- Check the use classes. Find the class the building is in now and the class you want.
- Read the council's local plan. Look for its policies on the street, the area and the kind of use.
- Ask the council early. Our guide to pre-application advice explains how.
- Price the building work. Get the conversion costed before you apply, so you know the scheme is worth it.
- Apply for planning permission. Send the drawings and the case for the change.
- Apply for building regulations approval. This covers the building work itself.
- Build, then open. Finish the work, get it signed off, and complete any registration the business needs.
Planning Portal gives the same warning to buyers. Before you lease or buy a property for a business, check whether it needs permission for that use.
Use classes: from Class C3 to Class E
Planning law puts each use of a building into a class. A house is in Class C3, dwellinghouses. It covers a single person or a household living there.
Most commercial uses are in Class E, which is called commercial, business and service.
| Part | What it covers |
|---|---|
| E(a) | Shops selling goods, other than hot food |
| E(b) | Cafes and restaurants, where food is mostly eaten on the premises |
| E(c) | Financial services, professional services (not health or medical) and other services suited to a commercial area |
| E(d) | Indoor sport, recreation or fitness |
| E(e) | Medical or health services, mainly for visiting members of the public |
| E(f) | A creche, day nursery or day centre |
| E(g) | Offices, research and development, and industrial processes, of a kind that can run in a residential area without harming it |
Moving between two uses inside the same class is not development. Moving from Class C3 to Class E is a change from one class to another.
Some uses sit in no class at all. The Order lists them, and a theatre and a launderette are two examples. Our guides to use classes and Class E go into more detail.
When planning permission is needed
The law counts a material change in the use of a building as development. Planning permission is required for development.
Planning Portal puts it simply. If you plan to change from one use class to another, you will generally need planning permission. Most outside building work that goes with it is also likely to need permission.
Some changes of use are allowed without an application. These are called permitted development. We read the list of permitted changes of use on 21 November 2026.
Working from home is different. Planning Portal says you do not necessarily need permission to work from home. Permission will probably be needed if the answer to any of these is yes:
- Will your home no longer be used mainly as a private residence?
- Will the business bring a marked rise in traffic or people calling?
- Will it involve activities unusual in a residential area?
- Will it disturb your neighbours at unreasonable hours, or cause noise or smells?
Not sure which side of the line you are on? You can ask the council for a lawful development certificate for the use you plan.
What the council looks at
The council must decide in line with its development plan, unless material considerations point the other way. So start with the local plan.
Planning Portal lists matters that can count as material considerations. Here are the ones to think about for a house on a residential street:
- Parking and traffic. Where will staff, customers or patients park, and how many trips will there be?
- Highway safety. Is it safe to turn in and out?
- Noise. What will the neighbours hear, and when?
- Privacy. Will visitors overlook the homes next door?
- Access for disabled people. Can everyone get in and around?
- Heritage. Is the house listed, or in a conservation area?
Two more points are worth checking early:
- The loss of a home. Your council's local plan may have a policy on losing housing. Read it before you buy or apply.
- Opening hours. A council can grant permission with the conditions it thinks fit. Ask early whether it would want to limit your hours.
A semi-detached or terraced house shares a wall with a neighbour. Be ready to explain how you will deal with noise through that wall and with people coming and going.
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Building regulations, fire and access
Planning permission is one approval. Building regulations are another, and you need both.
- Building regulations. Structural changes, new drainage and toilets, ventilation and changes to escape routes can all count as building work. Some changes of use also count by themselves. The list in the regulations includes a building that becomes a shop. Ask building control at the start which rules apply to your plan.
- Fire safety. The Fire Safety Order does not apply to domestic premises. Once the building is no longer a home, the Order applies. The responsible person must then make a suitable and sufficient fire risk assessment.
- Access. The guidance for access changes too. Approved Document M has a separate volume for buildings other than dwellings. A business that serves the public also has a duty to make reasonable adjustments under the Equality Act 2010.
A house was not built for these rules. Check the door widths, the steps at the entrance and the stairs before you fix the layout.
Turning a house into a dental or GP surgery
Take one example. A dentist or a GP finds a semi-detached house on a residential road and wants to turn it into a surgery. Here is how the steps apply.
Planning for the surgery
- The use class. A surgery is Class E(e), medical or health services. The house is Class C3. That is a change from one class to another, so it needs a planning application.
- Living above the practice. Class E(e) leaves out premises attached to the residence of the consultant or practitioner. If you plan to live in part of the building, ask the council how it will class the use.
- The planning case. Show where patients and staff will park. Give the opening hours and the number of treatment rooms. Explain how you will protect the neighbour on the other side of the shared wall.
CQC registration and the clinical rooms
- Registration with the Care Quality Commission. Anyone who provides a regulated activity in England must be registered with the CQC. It is an offence to carry one on without registration. The regulated activities include treatment of disease, disorder or injury, surgical procedures, and diagnostic and screening procedures. Ask the CQC which apply to your service.
- Premises the CQC will accept. The CQC says it must refuse registration if a provider cannot show it will meet the rule on premises. Premises must be clean, suitable for their purpose and maintained. The layout must suit the service, and the building must be big enough for the people using it.
- The clinical rooms. The CQC says many dental practices now have a separate room for cleaning instruments. Where the building does not allow that, the work is done in the treatment room, with a dirty to clean workflow. The CQC names HTM 01-05 as the professional guideline.
A house can make a good surgery, but the rooms must be planned for it. Waiting space, toilets, storage and a clean route for instruments all have to fit inside the walls you have.
So plan the rooms before the planning drawings are fixed. Our clinic and dental surgery fit out team builds consulting rooms, treatment rooms and dental surgeries around CQC registration and your opening date. Our guide to CQC requirements for a clinic fit out explains the premises rules room by room.
Business rates after the change
The tax on the building can change as well. GOV.UK says business rates are charged on most non-domestic properties. You will probably have to pay them if you use a building, or part of one, for non-domestic purposes.
If the property is part business and part home, you may need to pay business rates as well as Council Tax. GOV.UK tells owners to contact the Valuation Office to find out.
What sets the cost
We do not publish a price for a conversion like this. Every house is different, and so is every use. These are the things that move the figure:
- the size of the house and how many floors are used
- how much of the layout changes
- new drainage, ventilation and power for the new use
- fire safety work, such as escape routes and alarms
- access work, such as ramps, wider doors or a ground-floor toilet
- clinical rooms, if it is a surgery or clinic
For a clinic or surgery, our clinic fit out page has a cost calculator based on our 2026 London rates. Your fixed figure comes after a survey.
Want to know if your house can make the change? Get a free route check. We look at the planning route and the building work together.
Before you buy or apply
- The address and a floor plan of the house
- What the business does, and its opening hours
- How many staff and visitors on a normal day
- Where they will park
- Whether anyone will still live in the building
- For a surgery: the treatments you will offer and the number of rooms