What Is MEP in Construction? MEP Design Explained

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 4 min read

Exposed concrete ceiling with red sprinkler pipes, cable trays and light fittings

The short answer

MEP stands for mechanical, electrical and plumbing: the heating, cooling, fresh air, power, lighting, water and drainage that make a building work. M&E means the same field without the P in the name.

  1. Mechanical: heating, cooling, ventilation and extraction.
  2. Electrical: power, lighting, data, fire alarm and security.
  3. Plumbing: hot and cold water, drainage and sanitary fittings.
  4. MEP design should start with the layout, not after it.

What is MEP? It is the part of a building you rarely see and always feel. MEP stands for mechanical, electrical and plumbing. It is the heat, the fresh air, the power, the light and the water.

Get it wrong and a new office is stuffy, a kitchen fails its checks or a warehouse trips its power. Craftex provides MEP design and installation for commercial buildings. Planning a project? Discuss your project with our team.

What MEP means in construction

MEP is three groups of systems. Together they turn an empty shell into a building people can use.

  1. Mechanical. Heating, cooling, ventilation and extraction.
  2. Electrical. Power, lighting, data, fire alarm and security.
  3. Plumbing. Hot and cold water, drainage and sanitary fittings.

The professional body for the field is CIBSE. It uses a wider name, building services engineering. CIBSE says it "makes buildings meet the needs of the people who live and work in them". Its list also includes lifts, security systems and fire detection and protection.

MEP and M&E: the same discipline

You will see both names on drawings and quotes. They describe the same family of systems.

MEP and M&E compared
NameStands forWhat it covers
M&EMechanical and electricalHeating, cooling, air, power and lighting; plumbing is often included without being named
MEPMechanical, electrical and plumbingThe same systems, with water and drainage named
Building servicesThe name CIBSE usesAll of the above, plus lifts, security and fire systems

So an M&E consultant and an MEP consultant do the same job. When you compare quotes, read the scope list, not the name. Check that water, drainage and fire systems are in or out.

What an MEP engineer designs

An MEP engineer starts with questions. How many people will use the room? What equipment will run in it? How much heat will it give off?

From the answers they size each system and draw it. A typical set of MEP drawings shows:

  1. Heating and cooling. The plant, the pipes and the units in each room.
  2. Ventilation. Fresh air in, stale air out, and extraction from kitchens and toilets.
  3. Power. The incoming supply, the distribution boards and every socket.
  4. Lighting. The fittings, the switches and the emergency lights.
  5. Water and drainage. Hot and cold pipes, wastes and the route to the drain.
  6. Fire and safety systems. The alarm, and sprinklers where the building needs them.

The design must also meet the building regulations. In England, the Approved Documents give guidance on ways to meet them. Several deal with MEP.

Approved Documents that deal with MEP systems (England)
Approved DocumentTitleMEP system
BFire safetyFire safety systems
FVentilationFresh air and extraction
GSanitation, hot water safety and water efficiencyHot and cold water
HDrainage and waste disposalDrainage
JCombustion appliances and fuel storage systemsAppliances that burn fuel
LConservation of fuel and powerEnergy use of heating, cooling and lighting
PElectrical safetyElectrical work in homes

Approved Documents F and L each come in two volumes. One covers homes and one covers other buildings. Our guide to building regulations for an office fit-out shows how they apply to one type of project.

When MEP design happens in a project

MEP design runs beside the architecture, step by step. It should never be a last step.

  1. Brief. The engineer lists what the building must do and checks the incoming power, gas and water.
  2. Concept. Plant rooms, risers and main routes are found while the layout is still loose.
  3. Coordinated design. Ducts, pipes and cables are fitted around the structure and ceilings.
  4. Technical design. Every system is sized and drawn so a contractor can price and build it.
  5. Installation and testing. The systems are fitted, tested and handed over with their certificates.

Our guide to the RIBA stages explains the design steps in full.

The biggest risk is a design that looks right on paper and fails on site. A duct clashes with a beam, or a supply is too small for the equipment. That is why it helps when the designer and the installer are one team. Our guide to design and build vs traditional procurement explains that choice.

A worked example: Fuse Energy, Hackney

Fuse Energy asked us to fit out a warehouse unit in Hackney. The client already had an MEP design, but it would not have worked in practice.

We redesigned it from scratch: the electrical layout, the heating and the lighting. Then our own team installed it. The work ran over two phases and came to about £115K. Read the Hackney warehouse fit-out case study.

Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

Akshay Khanna, Google reviewSee all reviews on Google

What drives the cost of MEP design

There is no honest flat price for MEP design. The fee follows the amount of engineering the building needs. Five things move it.

  1. The size and use of the building. A kitchen or a laboratory needs far more services than a store room.
  2. How much can stay. Reusing sound plant and routes costs less than starting again.
  3. The incoming supplies. A power or water upgrade adds design work.
  4. How many systems are in scope. Cooling, sprinklers and controls each add drawings.
  5. The level of detail. Drawings for a tender are lighter than drawings to build from.

On a warehouse, the services follow the racking, the doors and the machines. Our warehouse design team plans both together. In a restaurant, extraction often decides where the kitchen can go. See our guide to restaurant kitchen fit-out.

We take on projects from £100,000 to £10M and above in construction value. Have drawings that need a second look? Discuss your project and send us what you have.

Frequently asked questions

What does MEP stand for?

MEP stands for mechanical, electrical and plumbing. It covers the systems inside a building: heating, cooling, ventilation, power, lighting, water and drainage.

Is MEP the same as M&E?

In day-to-day use, yes. M&E means mechanical and electrical. MEP adds plumbing to the name. Both describe the same family of building systems, and the same engineers design them.

What does an MEP engineer do?

An MEP engineer works out how much heat, air, power and water a building needs. They then draw the systems that supply them and check they meet the building regulations.

What is building services engineering?

It is the wider name for the same field. CIBSE, the professional body, says building services engineering makes buildings meet the needs of the people who live and work in them.

When should MEP design start?

At the same time as the layout. Plant rooms, risers and ceiling space must be found early. If the services are drawn after the layout is fixed, rooms and ceilings often have to change.

How much does MEP design cost?

It depends on the size of the building, how many systems it needs and how much of the existing plant can stay. We do not publish a fee. It is set after we see your brief.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Planning a fit-out, a refurbishment or a new building?

Send us your floor plan, the address and a rough budget. One team designs the services and installs them.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us