For restaurant owners and operators
Best Restaurant Interior Designers in London (2026)
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
The best restaurant interior designers in London for you depend on your venue: a group roll-out, a fine dining room or one new site. Last checked 21 Nov 2026, this list sorts seven firms by what each is best for.
- A hospitality specialist with a long record: B3 Designers, DLSM Studio.
- Brand and interior from one studio: Run For The Hills, Blacksheep.
- Luxury dining rooms: Fabled Studio. Independent and Japanese concepts: Muzo.
- Design, approvals and the build from one team: Craftex.
Looking for the best restaurant interior designers in London? There is no one winner. A group opening its tenth site needs a different firm from a chef opening a first dining room. So this list sorts firms by what each is best for.
Craftex wrote this list and is in it, so weigh that. We offer restaurant interior design and build what we draw. Have a site in mind? Discuss your restaurant with us before you sign the lease.
How we chose this list of restaurant designers
We did not rank firms from one to seven. We used five rules and we show the same facts for each firm.
- A London base. Each firm has a London studio or calls itself London-based.
- Restaurants as a stated focus. Each one says on its own site that it designs restaurants or hospitality venues.
- Facts from the firm's own website. We opened every site on 21 Nov 2026 and used only what it says.
- Named restaurant projects. We name projects the firm itself shows.
- A spread of venues. The list runs from global brands to single independent sites.
Comparison table of studios and design and build firms
Find your kind of venue in the table. Then read that firm's entry below it.
Six of the seven present themselves as design studios. Ask each one who builds the design. One, Craftex, is a design and build firm. The model column uses each firm's own words where its site gives them.
| Firm | Best for | London base | Model | Website |
|---|---|---|---|---|
| B3 Designers | Operators and groups who want a long restaurant record | Clerkenwell, EC1 | Design studio: concept to delivery | b3designers.co.uk |
| DLSM Studio | Restaurant groups and hotel dining | UK, Dubai and Europe; address not stated | Design studio: strategy, brand, interiors | dlsmstudio.com |
| Run For The Hills | Brand and interior from one studio | Queen's Park, NW6 | Design studio: branding and interiors | runforthehills.com |
| Fabled Studio | Luxury dining rooms and bars | Spitalfields, E1 | Design studio | fabledstudio.com |
| Muzo | Independent and Japanese concepts | Walthamstow, E17 | Design studio | muzodesign.co.uk |
| Blacksheep | Restaurant brands and new formats | Weston Street, SE1 | Strategy and design studio | blacksheep.uk.com |
| Craftex | Design, approvals and the build from one team | Victoria, SW1 | Design and build | craftex.co.uk |
Restaurant interior designers compared: long-record specialists
These two studios have designed restaurants for decades. Their own sites show the length of their records.
B3 Designers: best for operators and groups
- Base: a London studio in Clerkenwell, with studios in Glasgow, France and Spain.
- Founded: the year is not stated; the site says "25 years hospitality experience".
- Model: "Concept, branding, interior design, procurement, and delivery".
- Size signal: "300+ Restaurants designed & delivered"; projects investing "£100,000 and more".
- Sectors it lists: restaurants, bars, hotels and homes.
- Projects it names: Lina Stores and Bar Lina in Manchester; Brasserie Olivia in London.
- Website: b3designers.co.uk
DLSM Studio: best for restaurant groups and hotel dining
- Base: "Designers in the UK, Dubai & Europe"; no street address on the pages we read.
- Founded: the year is not stated; the site says "38 years of strategic design experience".
- Model: strategy, branding and interior design. It was called DesignLSM before.
- Size signal: project numbers are not stated.
- Sectors it lists: luxury and lifestyle hospitality: hotels and restaurants.
- Projects it names: Sumosan, Gaucho Liverpool, Bombay Brasserie and The Alchemist.
- Website: dlsmstudio.com
Studios that design the brand and the room
These two studios work on the name, the look and the interior together. That suits a new concept or a format that will grow.
Run For The Hills: best for brand and interior from one studio
- Base: One Lonsdale Road, Queen's Park, London NW6.
- Founded: 2012.
- Model: branding and interior design. The site says: "Our sweet spot is hospitality".
- Size signal: project numbers are not stated.
- Sectors it lists: hospitality and boutique residential projects.
- Projects it names: Kricket Soho, Flat Iron Hammersmith and Larry's Bar.
- Website: runforthehills.com
Blacksheep: best for restaurant brands and new formats
- Base: The Leather Market, Weston Street, London SE1.
- Founded: not stated on the page we read.
- Model: "a collective of strategists and designers" for food and drink venues.
- Size signal: project numbers are not stated.
- Sectors it lists: food and beverage hospitality and guest experiences.
- Clients it names: Wagamama, Côte and The Alchemist.
- Website: blacksheep.uk.com
Studios for luxury rooms and independent restaurants
One of these studios works at the luxury end. The other works with independent owners and has a clear specialism.
Fabled Studio: best for luxury dining rooms and bars
- Base: Tenter Ground, Spitalfields, London E1.
- Founded: not stated on the pages we read.
- Model: interior architecture, interior design, furniture design, lighting design and branding.
- Size signal: project numbers are not stated.
- Sectors it lists: "luxury hotels, restaurants and bars in the UK and internationally".
- Projects it names: Core by Clare Smyth and Sushisamba, both in London.
- Website: fabledstudio.com
Muzo: best for independent and Japanese concepts
- Base: Walthamstow, London E17.
- Founded: not stated on the page we read.
- Model: interior design studio with project management.
- Size signal: project numbers are not stated.
- Sectors it lists: restaurants, cafes, bars and boutique cinemas, with a Japanese design specialism.
- Projects it names: Oita Soho and Castiglione.
- Website: muzodesign.co.uk
Where Craftex fits and where it does not
Craftex is a design and build firm, not a restaurant-only studio. Our team draws the restaurant, handles the approvals and builds it under one contract.
- Base: Unit 5, 160 Buckingham Palace Road, Victoria, London SW1.
- Founded: trading since 2016.
- Model: design and build by one team.
- Size signal: restaurant and cafe projects from £100,000 to £10M and above in construction value.
- Sectors: restaurants, cafes, hotels, shops and offices.
- A project we name: Aunties, Seven Sisters.
- Website: craftex.co.uk
Aunties in Seven Sisters is a deli-restaurant scheme we designed on 83.35 m². Its images are design visuals, not photos of a finished restaurant.
Medusa in Knightsbridge is a beauty salon and spa, not a restaurant. Our team took its concept to full technical design and built 180 sq m on 4 levels. It took 17 weeks from concept to handover. We also handled planning for the signage and the outside ventilation units, as a restaurant often needs.
In Chelsea, our team delivered the remodel of a 27-key hotel with a restaurant and bar. Read how a room is planned in our restaurant layout guide.
Where Craftex is not the right fit
- A brand from scratch. We do not create names, logos or menus. A brand-led studio suits that.
- A famous design name. The studios above show far more finished restaurants than we do.
- Design only, with no build. We design what we will build.
- Small refreshes. Our projects start at £100,000 in construction value.
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Questions to ask before you appoint a restaurant designer
Put the same questions to every firm on your shortlist, ours included.
Our guide to restaurant design explains each part of the room. Our restaurant fit-out cost guide shows what the build may cost. For the builders, see restaurant fit-out companies compared.
Want the drawings and the build from one team? Discuss your restaurant and send us your floor plan.
Eight questions for every restaurant designer
- Which two restaurants like ours can we visit, and can we call the owners?
- Who plans the kitchen, the bar and the extraction route?
- Who prices the design, and when is the price fixed?
- Who draws the plans for the landlord, planning and the licence?
- Is the brand work in your fee, or separate?
- Who builds the design, and who holds that contract?
- What happens to the opening date if approvals run late?
- Who do we call if something fails after we open?