For restaurant owners and operators
Restaurant Layout and Floor Plan: A Planning Guide
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
A good restaurant layout puts the kitchen and its extraction first, then the bar, then the tables. Plan the routes of food, staff, guests and deliveries before you count covers.
- Fix the kitchen and the extraction route before anything else.
- Draw four routes: guests, staff, food and waste.
- Count covers on a drawn floor plan, not from a rule of thumb.
- Check the plan against food hygiene, fire, access and licence rules.
A restaurant layout decides how many covers you serve and how hard your staff work. Get it right and food reaches the table fast. Get it wrong and you pay for it every service.
This guide shows how to plan the layout in the right order. It is written by a team of restaurant interior designers who also build. Have a unit in mind? Discuss your restaurant before you sign the lease.
Restaurant layout basics: kitchen, bar and dining room
Every restaurant has three working zones. Plan them in this order, because the first is the hardest to move.
- The kitchen. It needs extraction, drainage, gas or power, and a delivery route.
- The bar. It needs water, drainage, a cellar or store, and a clear line to the tables.
- The dining room. It takes the space that is left, so protect it early.
Then draw four routes on the plan. They should cross as little as possible.
- Guests: door, host stand, table, toilets.
- Staff: pass, tables, wash-up.
- Food: delivery door, stores, prep, cooking, pass.
- Waste: kitchen and bar to the bin store.
Our guide to restaurant design covers the look, the lighting and the rules in more depth.
Restaurant floor plan and space per cover
A restaurant floor plan is a scaled drawing of every wall, table and piece of equipment. It is the only honest way to count covers.
You will find rule-of-thumb figures for space per cover online. We do not repeat them here. The right number depends on your service style, your table sizes and your routes.
Instead, count on the drawing:
- Mark what cannot move. Columns, stairs, drains, the entrance and the extraction route.
- Place the kitchen and the bar. Size them for your menu and your busiest hour.
- Draw the routes. Keep them wide enough for staff with plates and for wheelchair users.
- Lay out the tables. Mix twos and fours so you can join them for groups.
- Count the covers. Then test the count against your rent and your menu prices.
A worked example: Aunties, Seven Sisters
Aunties is a deli-restaurant scheme our team designed in Seven Sisters. The floor is 83.35 m². We zoned it into service, work and guest areas. The visuals show a deli counter, an open kitchen and bar seating along a brick wall. The images on that page are design visuals, not photos of a finished restaurant.
Restaurant kitchen layout
A restaurant kitchen layout follows the path of the food. Each step should hand on to the next without staff crossing each other.
| Station | What happens there | What it needs |
|---|---|---|
| Delivery and stores | Goods come in and are put away | A door near the stores, dry and cold storage |
| Prep | Food is washed, cut and portioned | Sinks, worktops, fridges close by |
| Cooking line | Food is cooked to order | Extraction above, gas or power, heat-proof finishes |
| Pass | Plates are checked and handed to staff | A clear line to the dining room |
| Wash-up | Dirty plates and pans come back | Its own sinks and a route that avoids the pass |
Keep raw food and cooked food apart on the plan. Food Standards Agency guidance says food businesses must take steps to avoid cross-contamination.
The same guidance sets out what the room itself needs. It says you must have enough washbasins for everyone working in the business. Separate sinks must be provided, where necessary, for washing food and cleaning equipment. Floors and walls must be easy to clean.
Commercial kitchen design: layout and extraction
In commercial kitchen design, extraction comes before the cooking line. Where the duct can leave the building often decides where the kitchen can go.
The Health and Safety Executive says kitchen ventilation is required to create a safe and comfortable working environment. It says this is usually achieved by mechanical extraction through a canopy hood over the cooking appliances.
Three things to settle before you fix the commercial kitchen layout:
- The duct route. Find where the duct can run and where it can discharge. This may need the landlord's consent and planning permission.
- Make-up air. Air taken out must be replaced. HSE says this matters most for gas-fired appliances.
- The fuel. Gas, electric and solid fuel each change the extraction design.
HSE's guidance sheet on the subject is called "Ventilation of kitchens in catering establishments". Your designer should work to it. Our guide to restaurant kitchen fit-out explains extraction and consents step by step.
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
The rules a restaurant layout must meet
A layout is not finished until it passes four checks. Build them in from the first drawing.
- Food hygiene. Premises need adequate ventilation, lighting and drainage. Register the business at least 28 days before trading.
- Fire safety. Escape routes and exits are part of the plan. In England, Approved Document B gives guidance on fire safety.
- Access. Routes, tables and toilets should work for disabled guests. Approved Document M covers access to and use of buildings.
- Licensing. If you sell alcohol, you need a premises licence under the Licensing Act 2003. Ask your council what plan it needs.
In a leased unit you will also need the landlord's consent for the works. Our guide to the licence for alterations explains how to get it.
Layout mistakes that cost covers
These five mistakes are cheap to fix on paper and costly to fix on site.
- Tables first, kitchen last. The kitchen ends up too small or too far from the extraction route.
- One door for everything. Guests, deliveries and waste share an entrance.
- A bar that blocks the room. Staff queue at the pass and guests queue at the door.
- Toilets as an afterthought. They take the best corner or need new drainage runs.
- No space for stock. Boxes end up in corridors and on escape routes.
A bar has its own layout rules. Our guide to bar design covers the counter and the back bar. For the build budget, see our restaurant fit-out cost guide. Comparing firms? Read our list of the best restaurant interior designers in London.
Want your floor plan drawn and tested by the team that will build it? Discuss your restaurant and send us the plan of the unit.