Chimney Breast Removal: Rules, Support and Cost

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Old brick chimney stack rising above a thatched roof against a blue sky

The short answer

Chimney breast removal needs building regulations approval, and the chimney left above must be properly supported. On a shared wall you will usually also need to serve a party wall notice.

  1. The stack above is held on a steel beam or, in limited cases, on steel brackets.
  2. A structural engineer designs the support. Building control checks it.
  3. GOV.UK lists removing chimneys from a party wall as work you must tell your neighbour about.
  4. Market figure: £600 to £5,000 by scope (Federation of Master Builders, April 2026).

Chimney breast removal needs building regulations approval, a support for the chimney left above, and often a party wall notice. Done right, it gives you back a strip of floor in every room it passes through.

Our structural engineer team designs the support, and our builders take the breast out and make good. Thinking about it? Book a structural survey and send us photos.

This is general information for England, not engineering advice. A structural engineer must inspect your house before any chimney work starts.

Building regulations for chimney breast removal

A chimney breast is the part of the chimney that sticks out into a room. The stack is the part above the roof. Both are heavy brickwork, and both rest on the breasts below.

Old brick fireplace in the chimney breast of an empty, run-down room

Taking a breast out is a change to the structure. Under the Building Regulations 2010, a change that makes a building worse against Part A, the structure rules, is a "material alteration". That is building work and needs approval.

Redbridge Council's building control guidance puts it plainly. Removing part or all of a chimney stack will require Building Regulation approval. The rest of the stack must be properly supported.

GOV.UK lists three ways to get approval:

  1. Full plans. Drawings and calculations are checked before work starts.
  2. Building notice. For smaller projects; work can start 2 days after the notice.
  3. Regularisation. Approval after the event, for work already done.

Planning permission is a different question. The Planning Portal says internal alterations should not need it. A listed building needs listed building consent for significant works. The FMB says planning is not usually needed unless the house is listed or in a conservation area.

How the chimney stack is supported

When the breast below goes, the brickwork above needs a new seat. There are two accepted ways, and one that councils refuse. Each council sets its own guidance, so check with yours. These rules come from two London councils.

Ways to support a chimney after the breast is removed
MethodWhen councils accept itWhat the engineer provides
Steel beamWhere brackets are not suitableA beam design and calculations
Gallows bracketsOnly under strict conditionsA design, calculations and pull-out tests (Redbridge)
Corbelled brickworkRedbridge says it should not be attemptedNot used

Gallows brackets are steel angle frames bolted to the wall under the remaining breast. Redbridge accepts them only if all of these are true:

  1. The stack is not completely vertical.
  2. The neighbour's chimney breast on the other side has not been removed.
  3. The party wall is brick, at least 215 mm thick, and in sound condition.
  4. The breast is no wider than 1,200 mm, with two flues.
  5. The breast sticks out no more than 340 mm.
  6. The house has no more than two storeys.
  7. Party wall notices have been served.

Harrow adds two rules. At least two thirds of the stack's height must stay inside the loft below the roof. Brackets are not allowed if the neighbour's side already hangs on brackets.

Redbridge also asks for 30 minutes of fire protection to the steel, unless it sits fully within the roof. Some chimneys also brace a long wall. Then the engineer's design goes to building control before work starts.

Chimney breast removal and the Party Wall Act

Most chimney breasts in terraced and semi-detached houses sit on the party wall. That is the wall you share with your neighbour. The Party Wall etc. Act 1996 gives you the right to cut away a projecting chimney breast. It also sets how you must do it.

GOV.UK lists "removing chimneys from a party wall" as work you must tell your neighbour about. Give written notice between 2 months and a year before you start. Your neighbour must reply in writing within 14 days.

Silence does not mean yes. GOV.UK says no reply starts the dispute process. Then surveyors agree a party wall award: what is done, how, when and who pays.

Redbridge adds a safety point. Damage to the brickwork between flues can let fumes from the neighbour's flue into your home. It asks for a smoke test of the neighbour's flue. Our party wall guide explains notices and awards in full.

Chimney breast removal cost

The Federation of Master Builders (FMB), the builders' trade body, publishes a chimney removal cost table. The figures below are the FMB's, not Craftex prices.

Chimney breast removal cost, market figures (Federation of Master Builders, April 2026)
Job scopeTypical timeMarket figure
One room, ground floor, no stack removal2 days£600 to £1,300
Two storeys, ground and first floor4 to 5 days£1,200 to £3,000
Full removal including the stack7+ days£2,000 to £5,000

The FMB says these prices come from one member firm in Scotland. It notes London and the South East usually cost more. It lists extras too: asbestos removal may add upwards of £300, and scaffolding costs around £400 a day.

The engineer's fee comes on top. The HomeOwners Alliance gives about £200 for calculations for one steel. Our structural engineer cost guide sets out the other fees.

I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

Lia Lavryk, Google reviewSee all reviews on Google

The steps from survey to sign-off

A chimney job runs in a clear order. Each step depends on the one before.

  1. Survey. An engineer looks at the breasts, the stack and the party wall, inside and in the loft.
  2. Design. The engineer sizes the steel or brackets and writes the calculations.
  3. Approval. The design goes to building control.
  4. Party wall notice. Served on your neighbour at least 2 months before work on the shared wall.
  5. Temporary support. Steel props hold the stack while the brickwork below comes out.
  6. Removal and support. The breast comes out and the steel goes in, with fire protection where needed.
  7. Inspection. Building control checks the work.
  8. Making good. New plaster, floor, skirting and decoration.

With full plans, GOV.UK says you usually get a completion certificate within 8 weeks of finishing. Keep it: you will need it when you sell. The same order applies when removing a load-bearing wall.

One team for the engineering and the build

On many jobs the engineer and the builder never meet. We close that gap. The engineer who designs the support works in the same team as the builders who fit it.

Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.

Our people bring combined experience of 561 major construction projects. A single chimney breast still gets a proper survey and a design building control will accept.

Book a structural survey and send us photos of the breast in each room and the stack outside. We quote a fixed fee after the first call.

Frequently asked questions

Can I remove a chimney breast without building regulations approval?

No. Redbridge Council's building control guidance says removing part or all of a chimney stack will require Building Regulation approval. Work done without it can be approved afterwards only through regularisation, which may mean opening up the work.

Do I need a party wall agreement to remove a chimney breast?

If the chimney is on a wall you share with a neighbour, yes, usually. GOV.UK lists removing chimneys from a party wall as work you must tell your neighbour about, with notice between 2 months and a year before you start.

Can gallows brackets hold up the chimney?

Sometimes. Redbridge Council accepts them only if a list of conditions is met, for example a sound brick party wall at least 215 mm thick and a house of no more than two storeys. Otherwise a steel beam designed by an engineer is needed.

Can I remove the chimney breast downstairs and keep it upstairs?

Yes, if what is left above is properly supported. The council guidance we read says the stack must be supported first, on a steel beam or, where allowed, on brackets.

How much does it cost to remove a chimney breast?

The Federation of Master Builders gives £600 to £1,300 for one ground-floor room, £1,200 to £3,000 for two storeys and £2,000 to £5,000 including the stack. It says the prices come from one member in Scotland and London usually costs more.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Ready to take out a chimney breast?

Our structural engineers design the steel, our team handles building control and the build. Send us photos of the chimney. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.