Structural Engineer Cost: Fees for Common Home Jobs

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

New steel beams held up on adjustable props during a house extension build

The short answer

A structural engineer's fee depends on the job, not on a fixed price list. The HomeOwners Alliance's 2025 guide puts one set of beam calculations at about £200 and a site visit at £175 to £300.

  1. Beam calculations for one steel: about £200 (HomeOwners Alliance, 2025).
  2. A written report: £700 (HomeOwners Alliance) or £500 to £2,000 (Federation of Master Builders).
  3. Hourly rates: about £100 to £200 (HomeOwners Alliance, 2025).
  4. These are published market figures, not our fees. We quote a fixed fee after the first call.

Structural engineer cost in the UK runs from about £200 for one set of beam calculations to several thousand pounds for a whole project. Those are the figures in the published market guides. Your own fee depends on what the engineer must check, draw and sign.

Our structural engineers London team inspects, calculates and designs the support, and our builders can then build it. Have a job in mind? Send us your drawings and we will quote a fixed fee.

This is general information for England, not engineering advice. A structural engineer must inspect your building before any structural work starts.

Structural engineer cost for common jobs

Two named guides publish fee figures for homeowners. The HomeOwners Alliance, a consumer body, gives a table of 2025 costs. The Federation of Master Builders, the builders' trade body, gives figures in its subsidence guide.

Both say the same thing first: costs vary a lot by project. Read the figures below as a starting point, not a quote. They are the publishers' market figures, not Craftex fees.

Published UK market figures for structural engineer fees (not our fees)
JobSourceMarket figure
Beam calculations for one steelHomeOwners Alliance, 2025about £200
Load-bearing wall, per projectHomeOwners Alliance, 2025about £400
Site inspection visitHomeOwners Alliance, 2025£175 to £300
Site inspection visitFederation of Master Builders£175 to £300
Written structural reportHomeOwners Alliance, 2025about £700
Written structural reportFederation of Master Builders£500 to £2,000
Basic projectHomeOwners Alliance, 2025about £1,000
Complex projectHomeOwners Alliance, 2025about £5,000
Hourly rateHomeOwners Alliance, 2025£100 to £200

The HomeOwners Alliance adds that some engineers charge by the hour. Others quote a set cost for a job. We quote a fixed fee, so you know the figure before we start.

What a structural engineer does for the fee

The fee buys three things: a look at the building, the sums, and a design the builder can follow. Building control then checks that design. On a small job this can be one visit and two pages. On a large one it can run for months.

Extension shell with new timber joists, a boxed-in steel beam and glazed doors to the garden
  1. A site visit. The engineer sees what holds up the floor, the roof and the walls above the work.
  2. Calculations. Sums that show the new beam, post or foundation can carry the load. Building control reads them.
  3. Drawings and details. How the steel sits on the walls, what it bears on and how it is fixed.
  4. A specification. The steel size and grade, and any padstone. A padstone is a solid block under the end of a beam that spreads its weight.
  5. Answers to building control. Replies when the inspector asks a question about the design.

For subsidence or a purchase, the product is a written report instead. Our guide to subsidence cracks explains what that report looks at.

What makes a structural engineer cost more

The same job title can hide very different amounts of work. These are the things that move a fee up or down.

  1. A visit or no visit. The HomeOwners Alliance notes a simple beam design without a site visit may cost a few hundred pounds.
  2. How much of the building changes. One opening needs one beam. A rear wall and a loft together need a frame of steels and checks of the walls below.
  3. What sits on the beam. A wall, a chimney stack or two floors above add load and more checks.
  4. What the beam sits on. Old walls and foundations may need new posts or pads beneath the ends.
  5. Changes after the design. The HomeOwners Alliance warns that later changes are likely to cost extra.
  6. Work already done. Building work done without approval may need opening up so the inspector can see the steel.

That last point is worth avoiding. Government guidance on Approved Document A says a retrospective approval can be very disruptive.

Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

Pascal Hunt, Google reviewSee all reviews on Google

Structural engineer fees and the cost of the building work

The engineer's fee is usually a small part of the job. The building work it unlocks costs much more. The Federation of Master Builders publishes these market figures for the work itself.

around £3,500Knocking down an internal wall, more if a steel is needed (FMB)
£600 to £5,000Chimney breast removal, by scope (FMB, April 2026)
around £20,000Average subsidence insurance claim (FMB)

The chimney figures come from one FMB member firm in Scotland. The FMB says London and the South East usually cost more. Our guides to removing a load-bearing wall and chimney breast removal explain both jobs step by step.

Bigger projects follow the same logic. A good design stops waste in the build. Our house extension cost guide shows the price of the whole job.

When you need a structural engineer and building control

Under the Building Regulations 2010, a change that would make a building worse against Part A, the structure rules, is a "material alteration". That is building work, and it needs approval. Our guide to Part A building regulations explains it in full.

GOV.UK sets out the routes to approval in England:

  1. Full plans. The most thorough. A decision within 5 weeks, or 2 months with your consent.
  2. Building notice. Only for smaller projects. Work can start 2 days after the notice, without formal plan approval.
  3. Regularisation. Retrospective approval from the council for work already done after 11 November 1985.

You choose the building control body: the council or a registered building control approver. GOV.UK says councils base their fees on their costs, and approvers agree fees with you. That fee is separate from the engineer's.

If a steel goes into a wall you share with a neighbour, the Party Wall Act may apply too. Our party wall guide explains the notices.

How to get an accurate structural engineer quote

A clear brief gets a firm price. Send these with your enquiry and we can quote a fixed fee after the first call, often without a second visit.

  1. Photos of the wall, chimney or crack, inside and outside.
  2. Any drawings you have, even an estate agent's floor plan.
  3. The age and type of the house, and whether it is listed or in a conservation area.
  4. What you want to change, in one or two lines.
  5. Your timing, and whether you already have a builder.

One team that designs and builds

Most homeowners hire an engineer, then a builder, then pass questions between them. With us, the engineer and the builder sit in one team.

Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.

Our team has delivered structural work in central London, including Slingsby Place in Covent Garden: strip-out, demolition and a new structure behind kept façades. Our people bring combined experience of 561 major construction projects.

Small jobs are welcome. A single beam gets the same care as a new building. Send us your drawings and we will quote a fixed fee after the first call.

Frequently asked questions

How much does a structural engineer cost in the UK?

It depends on the job. The HomeOwners Alliance's 2025 guide gives about £200 for one set of beam calculations, £400 for a load-bearing wall project, £1,000 for a basic project and £5,000 for a complex one. These are market figures, not our fees.

How much do structural engineers charge per hour?

The HomeOwners Alliance says to expect around £100 to £200 an hour. It adds that some engineers charge by the hour and others quote a set cost for a job.

How much are calculations for a steel beam?

The HomeOwners Alliance lists calculations for one RSJ at about £200. An RSJ is a rolled steel joist, the steel beam that holds up the wall or floor above an opening. A site visit is usually extra.

Why do structural engineer fees vary so much?

The fee follows the work: whether a visit is needed, how much of the building is affected and how many drawings and checks building control asks for. Changes to the design after the calculations are done can also add cost.

Can Craftex give me a fixed fee?

Yes. Send us your drawings or photos and tell us what you want to change. Our structural engineers look at the job and quote one fixed fee after the first call.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Need calculations, a visit or a report?

Our structural engineers inspect, calculate and design the support, and our builders can build it. Send us your drawings. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us