For developers and landowners planning flats in London
London Housing Design Guide: Today's Standards for Flats
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 7 min read
The short answer
The London Housing Design Guide was an interim guide published in August 2010. Today a London housing scheme is measured against London Plan 2021 Policy D6 and the Housing Design Standards guidance of June 2023.
- Policy D6 sets minimum flat sizes, a 2.5 metre ceiling height and private outside space.
- The 2023 guidance adds standards that are expected to be met and others that are best practice.
- In March 2026 the Mayor withdrew three of those standards, including dual aspect and eight homes per core.
- Outside London, the London Plan does not apply. Check the local plan for the site.
The London Housing Design Guide was an interim guide from August 2010, and it is now superseded. A London scheme of flats is measured today against Policy D6 of the London Plan 2021 and the Housing Design Standards guidance of June 2023.
This guide shows which housing design standards a London scheme of flats must meet now. It also covers what changed in March 2026. It is written for developers and landowners, by a team of apartment and housing architects.
Have a site in mind? Send us the address. We will test how many flats it can hold.
What the London Housing Design Guide was
The London Housing Design Guide was published in August 2010 by the London Development Agency. Its cover calls it an interim edition.
It was never a rulebook for every scheme. The guide said it was not itself planning policy. The Mayor would first apply it to developments supported by the London Development Agency, or on its land. Schemes applying for funding from the Homes and Communities Agency were to follow from April 2011.
The guide itself said a final version would line up with a new London Plan and new planning guidance. That is what happened. The ideas moved into planning policy.
| Document | Date | What it is now |
|---|---|---|
| London Housing Design Guide, interim edition | August 2010 | Superseded. Useful for history, not for a planning application |
| The London Plan, Policy D6 | 2021 | Planning policy. Sets the minimum standards |
| Housing Design Standards London Plan Guidance | June 2023 | Guidance on Policy D6. Lists standards and best practice |
| Support for Housebuilding London Plan Guidance | March 2026 | Withdraws three of the 2023 standards |
So if a consultant quotes the London Housing Design Guide at you, ask which document they mean.
Space and ceiling height standards
Policy D6 of the London Plan sets the floor. It says housing must give at least the floor area in its Table 3.1. The 2023 guidance then adds a larger, best practice size.
| Flat type | Minimum (London Plan Table 3.1) | Best practice (2023 guidance) |
|---|---|---|
| 1 bedroom, 1 person | 39 (37 with a shower room) | 43 (41 with a shower room) |
| 1 bedroom, 2 people | 50 | 55 |
| 2 bedrooms, 3 people | 61 | 67 |
| 2 bedrooms, 4 people | 70 | 77 |
| 3 bedrooms, 4 people | 74 | 84 |
| 3 bedrooms, 5 people | 86 | 97 |
| 3 bedrooms, 6 people | 95 | 107 |
These areas are gross internal area. That is the floor space measured between the inside faces of the walls around the home.
The 2023 guidance says the minimum sizes line up with the national standard, except for ceiling height. Our guide to the nationally described space standards for flats explains that national table in full.
Policy D6 also sets room sizes and height:
- Ceiling height. At least 2.5 metres for at least 75 per cent of the home's floor area. The national standard uses 2.3 metres.
- Main bedroom. A home for two or more people needs one double or twin bedroom at least 2.75 metres wide.
- Other double bedrooms. At least 2.55 metres wide.
- Every double bedroom. A floor area of at least 11.5 square metres.
- Single bedroom. At least 7.5 square metres and at least 2.15 metres wide.
Light, outlook and dual aspect
A dual aspect home has opening windows on two outside walls. It gets light from two sides and air can blow through it.
Policy D6 says housing should maximise dual aspect homes and normally avoid single aspect ones. It also asks for enough daylight and sunlight for new homes and their neighbours, without overheating.
This is the part that changed in 2026. The 2023 guidance had a stricter standard, called C4.1. It said new homes should be dual aspect unless exceptional circumstances made it impractical.
In March 2026 the Mayor withdrew that standard. The new guidance says decision makers should allow flexibility between dual and single aspect homes. Policy D6 still applies.
Where single aspect homes are proposed, the applicant should show four things:
- adequate passive ventilation, which means fresh air without fans
- adequate daylight
- adequate privacy
- that the home will avoid overheating
The 2023 guidance also asks that at least one habitable room, such as the living room, gets direct sunlight.
Private outdoor space and storage
Every flat needs its own outside space. Policy D6 sets the minimum where the borough has no higher standard.
| Point | Standard |
|---|---|
| Home for 1 or 2 people | At least 5 square metres |
| Each extra person | 1 square metre more |
| Depth and width | At least 1.5 metres each way |
| Best practice in the 2023 guidance | Depth and width of at least 2.5 metres |
| Counted in the flat's floor area? | No |
Outside space does not count towards the minimum floor area. Storage does: it is part of the floor area table. Table 3.1 gives a built-in storage figure for each flat type. Policy D6 also asks for easy storage for recycling, food waste and other waste.
The 2023 guidance covers the shared parts of the block too. It asks for shared corridors at least 1.5 metres wide. In a building with lifts, it asks for at least one fire evacuation lift.
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
How the standards affect the number of flats on a site
The standards decide how many flats fit. Here is how each one bites.
- Flat sizes set the count per floor. Divide the usable floor by the minimum areas and you have a first number. Aim only at the minimum and the layouts become hard to plan.
- Ceiling height sets the storeys. Each floor needs 2.5 metres clear, plus the floor build-up. A height limit then caps the number of floors.
- Aspect sets the depth. A deep block makes single aspect flats. The 2026 guidance asks decision makers for flexibility, but the four tests above still apply.
- Balconies set the outside wall. Each flat needs its outside space, so the facade has to carry it.
- The core sets the corridor. A core is the lift and stair that serve the flats.
The 2023 guidance set a limit of eight homes on each core per floor. That standard, B2.5, was withdrawn in March 2026.
The new guidance says decision makers should support designs that go above eight. The Building Regulations still limit how far a flat's front door can be from the stair. Our guide to the second staircase rule covers taller blocks.
This is why a site should be tested before it is bought. A development feasibility study puts numbers on it. For flats on top of an existing building, read our airspace development guide.
How architects show compliance at planning
A planning officer will not take the standards on trust. The application has to show them.
The 2023 guidance asks for fully furnished floor plans for every flat type, at a scale of at least 1:100. The furniture proves the rooms work, not only that the area adds up.
A clear set of evidence looks like this:
- a schedule of every flat, with its type, area, storage and outside space
- furnished plans for each flat type
- a plan marking which flats are dual aspect and which are single
- sections showing the ceiling heights
- a short note for each standard that is not met, with the reason
One warning from the guidance itself. Meeting the guidance does not prove you meet the policy. The planning officer still judges the scheme against Policy D6 and the borough's own plan.
Converting a house instead of building new? Our guide on how to convert a house into flats covers that route.
What one design and build team changes
A layout can pass every standard and still cost too much to build. Deep plans, long corridors and odd balconies all add cost. You want to know that before planning, not after.
Our team of architects, with 50 years of experience, works beside designers, engineers and builders in one company. We draw the scheme, take it through planning, price it while it is drawn and build it under one contract. Our combined team experience includes 11,127 homes taken through planning.
A new London Plan is also on the way. The 2026 guidance says it is expected to be adopted by 31 March 2028. So ask your designer which document each standard comes from, and its date.
Own a site and would rather sell it or bring in a partner? See how to sell your land to us or develop it with us.
Ready to test your site? Discuss your site with us. Send the address and the site area.
Before you ask how many flats will fit
- The address and the site area
- A plan of any building already on the site
- The borough, and whether its local plan sets higher standards
- The mix of flat sizes you want
- Any height limit you already know about
- Whether you want to build, sell or find a partner