Why flexible commercial construction spaces are fueling the next startup boom

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Office breakout area with lounge chairs, a low bench and a tall timber shelving screen

The short answer

Flexible office space for startups works when the fit-out is built to change: loose furniture instead of fixed walls, power and data everywhere, and services sized for the headcount you'll have next year, not this year.

  1. Plan the fit-out for your next headcount, not today's.
  2. Use demountable partitions and furniture for most rooms.
  3. Put power, data and cooling capacity in before you need them.
  4. Check the lease and the landlord's consent before you build anything.

A startup signs for ten desks. Nine months later it has twenty-five people and a meeting room used as a store. The fit-out that looked generous is now the thing slowing the company down. Moving again costs a fortune in time.

Flexible office space for startups solves that, but only if the space is built to change. This guide covers what makes an office fit-out flexible, the UK numbers that set your limits and real projects that show the trade-offs. Growing faster than your office? Book a site visit and we'll plan the next stage with you.

What flexible office space for startups really needs

"Flexible" gets used for two different things. One is the lease: short terms, serviced floors, desks by the month. The other is the build: an office layout that can change without being torn out. Startups need both, at different stages.

Serviced space vs your own fitted-out office
FactorServiced or coworking spaceYour own lease and fit-out
Speed to move inDaysWeeks to months
Upfront costLowFit-out and deposit
Control of layout and brandLimitedFull, within the lease
Cost per desk as you growRises with every deskFalls as you fill the floor
Best forFirst team, uncertain growthA team that knows how it works

Many founders start in serviced space and take their own floor once the team stabilises. That move is where the fit-out decisions in this guide matter.

Plan the fit-out for your next headcount

The most common mistake is designing for the people you have. Design for the people you expect in 18 to 24 months. Then furnish for today.

Two UK numbers set the limits. The British Council for Offices recommends 10 m² per person for general office space. HSE sets a legal minimum of 11 cubic metres per person in a workroom. In a room 3 m high, that's about 3.7 m² of floor. So the BCO figure leaves room for meeting rooms, kitchens and quiet space.

Welfare facilities scale with headcount too. HSE guidance sets the minimum number of toilets and washbasins for mixed use:

Minimum toilets and washbasins by number of people at work (HSE)
People at work at one timeToiletsWashbasins
1 to 511
6 to 2522
26 to 5033
51 to 7544
76 to 10055

Cross a line in that table and you may need building work, not just new desks. Check it before you sign the lease.

Build a layout that changes without rebuilding

A flexible fit-out keeps the expensive, fixed parts to a minimum. Everything else can move.

Freestanding meeting pod on castors in an open-plan office with timber floor and exposed ceiling
A meeting pod on castors can move as the team grows, without new walls or new ceilings.
  1. Few fixed walls. Put WCs, kitchens and comms rooms where they won't block future growth.
  2. Demountable partitions. Glazed systems that can be taken down and moved later.
  3. Pods and booths. Freestanding rooms for calls and focus that need no new walls.
  4. Loose furniture. Benches and tables you can add to, rather than built-in desks.
  5. Zoned space. A front area for visitors and a back area that can absorb new hires.

The BCO notes demand for flexible, relatively column-free, open-plan floors. If you can choose between buildings, an open floor plate gives you far more room to change.

Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

Akshay Khanna, Google reviewSee all reviews on Google

Put services in for the team you'll have

Partitions are cheap to move. Services are not. Plan these for the larger team from day one:

  • Power and data across the whole floor, through floor boxes or a raised floor
  • Cooling and fresh air for more people than you have now
  • Lighting in a grid that still works when rooms move
  • Spare capacity in the distribution board and the comms cabinet

Adding these later means lifting floors and opening ceilings in a working office. Putting them in during the fit-out costs far less.

Check the lease, consents and exit costs first

A flexible fit-out still sits inside someone else's building. Three checks come before any drawings.

  1. The landlord's consent. Most leases need a licence for alterations before you change anything. Our guide to Cat A, Cat A+ and Cat B fit-outs explains what the landlord usually provides.
  2. Planning. Offices sit in Use Class E. Works that affect only the inside of a building are not development, so a fit-out rarely needs planning permission.
  3. Reinstatement. Many leases make you strip your fit-out when you leave. Demountable parts cut that bill.

What about cost? Our 2026 London rates for a Cat B fit-out on a Cat A floor start at about £85.50 per sq ft. High spec runs to £176+, excluding VAT.

Two Craftex projects show how space can flex

Neither of these was a startup. Both show what happens when a fit-out is planned around how a business really works.

Row of blue upholstered work booths with tables and pendant lights beside desks
Booths and open desks side by side let the same floor serve focus work and team work.
500 sq mDrake's, railway arch build
8 weeksDrake's programme
750 sq mBeaumont House office
3 weeksBeaumont House programme

Drake's: a growing brand that needed less space, not more

The old warehouse of Drake's no longer suited the way the brand worked. It was too big, too costly and too disconnected. We fitted a 500 sq m railway arch in eight weeks. It now holds offices, a photo studio, manufacturing, storage and dispatch.

Nothing could be drilled into the arch. So we built freestanding partitions and independent service frames. Heating and cooling were zoned, so energy goes only where it's needed. The brand now runs in a smaller space without losing any capability.

Beaumont House: 150 people moved in three weeks

At Beaumont House, more than 150 staff had to move before a lease ran out. We turned 750 sq m into an open-plan office with frosted glass meeting rooms in three weeks. We managed the move as well.

Data ran under the floor to every desk, so desks can move without new cabling. The client later hired us for a second refurbishment in the same building, worth £1.3 million.

How Craftex fits out offices for growing companies

We design and build commercial fit-outs and refurbishments across London. That covers offices and mixed spaces like studios, workshops and storage. For warehouse-led businesses, see what a warehouse fit-out involves.

Craftex started in 2016 as a carpentry and joinery company. Around 60% of our labour is in-house. We take on construction projects from £100,000. For more on making a floor work, read our office design tips from the experts. Our lessons from bold commercial property redevelopment show how buildings get a second life.

Taking your first floor, or your next one? Book a site visit and we'll plan a fit-out that can grow with you.

Frequently asked questions

What makes office space flexible for a startup?

A layout that can change without rebuilding it. That means few fixed walls, demountable partitions, loose furniture, power and data across the floor, and heating, cooling and ventilation with spare capacity for more people.

How much office space does a startup need per person?

The British Council for Offices recommends 10 m² per person as the design standard for general office space. HSE sets a legal minimum of 11 cubic metres of room volume per person, which is about 3.7 m² of floor in a room 3 m high.

Should a startup take serviced office space or fit out its own?

Serviced space is fast and needs no capital, but you pay for that flexibility and can't change much. Your own lease and fit-out costs more upfront, but the space works the way your team does. Many startups move from one to the other as they grow.

Do I need planning permission to fit out an office?

Usually not. Works that affect only the interior of a building are not development under planning law, and offices sit in Use Class E. You still need Building Regulations approval where it applies and your landlord's written consent.

How long does an office fit-out take for a growing company?

It depends on size and scope. Our Beaumont House refurbishment of 750 sq m took three weeks on site. A survey and a fixed design are what make a short programme possible.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Need an office that can keep up with your growth?

Our design and build team plans the layout around your next headcount, not just today's, and gives you one price and programme. Book a site visit.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us