For founders planning their first or next office
Why flexible commercial construction spaces are fueling the next startup boom
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
Flexible office space for startups works when the fit-out is built to change: loose furniture instead of fixed walls, power and data everywhere, and services sized for the headcount you'll have next year, not this year.
- Plan the fit-out for your next headcount, not today's.
- Use demountable partitions and furniture for most rooms.
- Put power, data and cooling capacity in before you need them.
- Check the lease and the landlord's consent before you build anything.
A startup signs for ten desks. Nine months later it has twenty-five people and a meeting room used as a store. The fit-out that looked generous is now the thing slowing the company down. Moving again costs a fortune in time.
Flexible office space for startups solves that, but only if the space is built to change. This guide covers what makes an office fit-out flexible, the UK numbers that set your limits and real projects that show the trade-offs. Growing faster than your office? Book a site visit and we'll plan the next stage with you.
What flexible office space for startups really needs
"Flexible" gets used for two different things. One is the lease: short terms, serviced floors, desks by the month. The other is the build: an office layout that can change without being torn out. Startups need both, at different stages.
| Factor | Serviced or coworking space | Your own lease and fit-out |
|---|---|---|
| Speed to move in | Days | Weeks to months |
| Upfront cost | Low | Fit-out and deposit |
| Control of layout and brand | Limited | Full, within the lease |
| Cost per desk as you grow | Rises with every desk | Falls as you fill the floor |
| Best for | First team, uncertain growth | A team that knows how it works |
Many founders start in serviced space and take their own floor once the team stabilises. That move is where the fit-out decisions in this guide matter.
Plan the fit-out for your next headcount
The most common mistake is designing for the people you have. Design for the people you expect in 18 to 24 months. Then furnish for today.
Two UK numbers set the limits. The British Council for Offices recommends 10 m² per person for general office space. HSE sets a legal minimum of 11 cubic metres per person in a workroom. In a room 3 m high, that's about 3.7 m² of floor. So the BCO figure leaves room for meeting rooms, kitchens and quiet space.
Welfare facilities scale with headcount too. HSE guidance sets the minimum number of toilets and washbasins for mixed use:
| People at work at one time | Toilets | Washbasins |
|---|---|---|
| 1 to 5 | 1 | 1 |
| 6 to 25 | 2 | 2 |
| 26 to 50 | 3 | 3 |
| 51 to 75 | 4 | 4 |
| 76 to 100 | 5 | 5 |
Cross a line in that table and you may need building work, not just new desks. Check it before you sign the lease.
Build a layout that changes without rebuilding
A flexible fit-out keeps the expensive, fixed parts to a minimum. Everything else can move.
- Few fixed walls. Put WCs, kitchens and comms rooms where they won't block future growth.
- Demountable partitions. Glazed systems that can be taken down and moved later.
- Pods and booths. Freestanding rooms for calls and focus that need no new walls.
- Loose furniture. Benches and tables you can add to, rather than built-in desks.
- Zoned space. A front area for visitors and a back area that can absorb new hires.
The BCO notes demand for flexible, relatively column-free, open-plan floors. If you can choose between buildings, an open floor plate gives you far more room to change.
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Put services in for the team you'll have
Partitions are cheap to move. Services are not. Plan these for the larger team from day one:
- Power and data across the whole floor, through floor boxes or a raised floor
- Cooling and fresh air for more people than you have now
- Lighting in a grid that still works when rooms move
- Spare capacity in the distribution board and the comms cabinet
Adding these later means lifting floors and opening ceilings in a working office. Putting them in during the fit-out costs far less.
Check the lease, consents and exit costs first
A flexible fit-out still sits inside someone else's building. Three checks come before any drawings.
- The landlord's consent. Most leases need a licence for alterations before you change anything. Our guide to Cat A, Cat A+ and Cat B fit-outs explains what the landlord usually provides.
- Planning. Offices sit in Use Class E. Works that affect only the inside of a building are not development, so a fit-out rarely needs planning permission.
- Reinstatement. Many leases make you strip your fit-out when you leave. Demountable parts cut that bill.
What about cost? Our 2026 London rates for a Cat B fit-out on a Cat A floor start at about £85.50 per sq ft. High spec runs to £176+, excluding VAT.
Two Craftex projects show how space can flex
Neither of these was a startup. Both show what happens when a fit-out is planned around how a business really works.
Drake's: a growing brand that needed less space, not more
The old warehouse of Drake's no longer suited the way the brand worked. It was too big, too costly and too disconnected. We fitted a 500 sq m railway arch in eight weeks. It now holds offices, a photo studio, manufacturing, storage and dispatch.
Nothing could be drilled into the arch. So we built freestanding partitions and independent service frames. Heating and cooling were zoned, so energy goes only where it's needed. The brand now runs in a smaller space without losing any capability.
Beaumont House: 150 people moved in three weeks
At Beaumont House, more than 150 staff had to move before a lease ran out. We turned 750 sq m into an open-plan office with frosted glass meeting rooms in three weeks. We managed the move as well.
Data ran under the floor to every desk, so desks can move without new cabling. The client later hired us for a second refurbishment in the same building, worth £1.3 million.
How Craftex fits out offices for growing companies
We design and build commercial fit-outs and refurbishments across London. That covers offices and mixed spaces like studios, workshops and storage. For warehouse-led businesses, see what a warehouse fit-out involves.
Craftex started in 2016 as a carpentry and joinery company. Around 60% of our labour is in-house. We take on construction projects from £100,000. For more on making a floor work, read our office design tips from the experts. Our lessons from bold commercial property redevelopment show how buildings get a second life.
Taking your first floor, or your next one? Book a site visit and we'll plan a fit-out that can grow with you.