Cat A Fit Out for Landlords and Agents
Shell floors and returned offices taken to a lettable Cat A finish, priced and built by one team.
Our track record
100% of projects delivered aheadof programme and on budget
Office floors our team has delivered
- 1,550 m²Portsoken House, Aldgate: two office floors fitted out from scratch
- 7 monthson site there, with the building occupied throughout
- 3 weeksfor a 750 m² office at Beaumont House, Kensington
- £10Mpublic, employers’ and professional liability cover
A floor a tenant can move into, finished on the date the agent markets
Craftex delivers Cat A fit out for landlords, asset managers and letting agents in London and across the UK. We take a shell floor, or an office a tenant has just handed back, to a clean Cat A standard: suspended or exposed ceilings, LED lighting, air conditioning, raised floors, power distribution, fire alarm and finished toilets.
One team surveys the floor, designs the services, prices the work and builds it, so the space is lettable on the date your agent is marketing. Our own trades carry out around 60% of the work and a director is responsible from survey to handover.
We start fast. On a recent office our team was on site two weeks after the first call and finished 750 m² in three weeks. Every week a floor sits empty costs rent, rates and service charge, so contact us and see how quickly we turn a programme round.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What a Cat A fit-out includes
The base a tenant expects before adding their own layout. Also under the same contract: strip-out after a tenant leaves and dilapidation works and landlord compliance.
Ceilings and lighting
Suspended grid or exposed soffit, with LED lighting designed to office levels and emergency lighting.
Air conditioning and ventilation
Heating, cooling and fresh air for the whole floor, commissioned and balanced.
Raised floors and power
Raised access floor, floor boxes and distribution boards ready for a tenant’s layout.
Toilets and showers
Finished WCs, accessible toilet, showers and lockers that agents can show.
Lift lobbies and common parts
Landings, lobbies and stairs brought up to the standard of the floors.
Cycle stores and amenities
Bike storage, drying rooms and end-of-trip facilities tenants now ask for.
Cat A, Cat A+ and Cat B: what landlords should deliver
Cat A is the landlord’s finish: a clean, open floor with working services and no tenant layout. Cat B is what the tenant adds: rooms, kitchen, furniture, data and brand. Between them sits Cat A+, sometimes called plug and play, where the landlord also provides meeting rooms, a kitchen and furniture so a smaller tenant can move straight in.
Which one to build depends on the market for your floor. Large floors in central London usually let as Cat A, because big tenants want to design their own space. Smaller floors and regional offices often let faster as Cat A+ or fully fitted. We look at the size, the location and what your agent is hearing before recommending a scope.
The difference is explained in detail in our guide to Cat A, Cat A+ and Cat B fit-out.
Between tenancies: strip-out, reinstatement and the EPC
Most Cat A projects start when a tenant leaves. The outgoing tenant’s fit-out is stripped back, the dilapidations works are completed and the floor is reinstated to Cat A, ideally in one programme so the void is as short as possible.
It is also the moment to improve the energy rating. Under the Minimum Energy Efficiency Standards a commercial letting in England and Wales needs at least an EPC E, and better-rated floors let more easily. New LED lighting, controls and heat-pump air conditioning in a Cat A refurbishment usually move the rating the most.
We price the strip-out, the dilapidation works and the Cat A finish together, so you can compare the cost of the works with the rent lost while the floor is empty.
How it works
How a Cat A fit-out runs
01
Survey the floor
We walk the floor with you or your agent, test the services and record what can stay and what must go.
02
Scope and fixed price
Cat A, Cat A+ or a fitted floor, priced with a programme to the marketing date.
03
Design and approvals
Services designed, building control and any landlord or freeholder consents prepared.
04
Strip-out and build
Our own trades strip, install and finish, with occupied floors protected.
05
Commission and hand over
Systems tested and balanced, certificates and O&M manuals ready for the agent and the tenant.
The Craftex Guide to Fit-Out and M&E Works
How the services of an office floor are surveyed, designed and replaced, and what drives the budget of a Cat A refurbishment.
In every Cat A contract
Six commitments to landlords
Written into the contract you sign.
-
Ready for the marketing date
The programme is built back from the date your agent needs the floor.
Beaumont House: 750 m² in three weeks.
-
One fixed price
For the agreed scope; anything extra priced and approved first.
-
Strip-out to handover in one contract
Dilapidations, Cat A and amenities by one team.
-
Our own trades
Around 60% of the labour is ours, so voids stay short.
-
£10M cover
Public, employers’ and professional liability; ISO 9001, 14001 and 45001.
-
Paperwork tenants ask for
Test certificates, O&M manuals and building control sign-off at handover.
Already have a quote? Send it to us. We'll beat it.
Holding a Cat A quote from another contractor? Send it to us. We check it against the floor and your marketing date and reply with our figure for the same scope, with a programme.
Compare your quotes
Why Cat A floors sit empty for longer than they should
Six risks to check in any proposal.
| Area | The usual risk | With Craftex |
|---|---|---|
| Scope | A full Cat A on a floor that would let faster as Cat A+ | Scope matched to the floor and the agent’s feedback |
| Strip-out | Dilapidations and Cat A let as two separate jobs | One programme from strip-out to finish |
| Services | Old plant kept until a tenant finds it fails | Plant surveyed and replaced where it will not last |
| Energy rating | A refurbished floor that still cannot be let | EPC improvements built into the scope |
| Occupied building | Other tenants disturbed and complaining | Noisy work timed and common parts protected |
| Handover | Certificates missing when the tenant’s surveyor asks | Full handover pack on day one |
What a Cat A fit-out costs in 2026
Our 2026 construction rates per m², ex VAT and fees. The condition of the services sets where your floor sits.
| Scope | What it covers | Rate |
|---|---|---|
| Strip-out to shell | Tenant fit-out removed, floor made safe and clean | £94/m² |
| Cat A reinstatement, services kept | Ceilings, lighting, floors and finishes renewed; plant retained | £568/m² (£53/sq ft) |
| Full Cat A with new air conditioning | New heating and cooling, lighting, ceilings, floors and WCs | £1,040/m² (£96.50/sq ft) |
| Energy upgrade allowance | Controls, LED and plant changes aimed at a better EPC | from £378/m² |
| Projects we take on | From one floor to a whole building | £100,000 to £10M+ |
Asbestos removal, new risers, roof plant and common-parts works are priced per building after a survey.
Send the floor plan and your marketing date for a fixed figure; a detailed cost plan is available from £750 + VAT, credited if you build with us.
Free cost calculator
What will your Cat A floor cost?
Enter the floor area and choose a scope for an instant range at our 2026 rates.
Office floors by our team
-
Aldgate, London Portsoken House: 1,550 m² over two floors fitted out with the building in use View case study
-
Aldgate, London Portsoken House reception: common parts rebuilt at night and at weekends View case study
-
Kensington, London Beaumont House: 750 m² refurbished in three weeks before a lease ended View case study
The same directors lead every project
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Cat A fit-out: your questions
What is included in a Cat A fit-out?
Typically ceilings, lighting and emergency lighting, heating and air conditioning, a raised floor with power distribution, fire alarm, finished toilets and showers, and common parts in good order. There are no rooms, kitchens or furniture: those are the tenant’s Cat B.
How long does a Cat A fit-out take?
A floor with sound services can be refreshed in a few weeks; replacing air conditioning or risers takes longer. At Portsoken House in Aldgate our team fitted out two occupied-building floors, 1,550 m² in total, in seven months.
Should we deliver Cat A+ instead?
For smaller floors and regional offices, often yes: meeting rooms, a kitchen and furniture let the floor to tenants who want to move straight in. We advise after looking at the floor and talking to your agent.
Do you do the strip-out and dilapidations as well?
Yes, in the same programme, so the floor goes from the outgoing tenant’s fit-out to Cat A without a gap between contractors.
Who pays for Cat A and Cat B?
Usually the landlord pays for Cat A and the tenant for Cat B, sometimes helped by a landlord contribution or rent-free period. See landlord fit-out contributions.
How much does Cat A cost per square metre?
Our 2026 rates run from £568 per m² where the plant is kept to £1,040 per m² with new air conditioning, ex VAT. Use the calculator; the survey fixes the figure.
Can you work while other floors are occupied?
Yes. We plan deliveries, noisy work and lift use around the other tenants and protect common parts, as at Portsoken House.
Read before you start
For tenants: office fit-out in London. Background: the difference between Cat A and Cat B, MEES for commercial landlords and landlord fit-out contributions.
What our clients say
See all reviews on Google-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Speed and proactivity, proven on our projects
We plan ahead: every change is priced and agreed in writing before the work is done.
-
3 weeks
to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.
-
8 weeks
to design and build the 2,500 m² Banbury warehouse, with the site kept running.
-
8 weeks
on site at Drake's flagship on Savile Row, with the shop open throughout.
Speak to us and you will see how we work.
We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.
Preparing a floor to let?
Send us the address, the floor area and the date your agent wants to market it. A director replies with the next step and a programme.



























