Land Remediation Relief: How Companies Get 150% Relief on Contaminated and Derelict Land
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
Land Remediation Relief lets a company deduct 150% of what it spends cleaning up contaminated land, or clearing long-term derelict land: the normal 100% plus an extra 50%. A loss-making company can swap the relief for cash.
- Companies only, and only where the company did not cause the problem.
- The land must have been bought already contaminated or derelict.
- The cash credit is 16% of the loss the relief creates.
- The Budget of 28 October 2026 did not change it; a reform is still under review.
Land Remediation Relief lets a company deduct 150% of what it spends cleaning up contaminated land, or clearing long-term derelict land. That is the normal 100% deduction plus an extra 50%, and a loss-making company can swap it for cash. Holborough Lakes in Snodland shows how far such land can go: a former chalk quarry turned into a lakeside community.
It is for companies only, where the company did not cause the problem, on land bought already in that state. On a London brownfield site, it can take a real slice off the after-tax cost of the ground. Our development site appraisal prices that ground before you buy; discuss your project with us.
Buying a contaminated plot? See the brownfield sites we source for developers and investors.
Every rule below was checked on legislation.gov.uk and in HMRC's manual on 30 October 2026. The Budget of 28 October did not change the relief. This is general information, not tax advice. Speak to a qualified tax adviser before you rely on the relief in an appraisal.
How Land Remediation Relief works
The relief sits in Part 14 of the Corporation Tax Act 2009. It covers two kinds of land: contaminated land and long-term derelict land. A site does not need to be both.
| Feature | Rule |
|---|---|
| Who can claim | Companies within the charge to corporation tax |
| What it gives | 150% of qualifying spending: 100% plus an additional 50% |
| Revenue spending | The extra 50% is added to the normal deduction |
| Capital spending | Deducted at 150% by election, instead of adding to the cost of the land |
| Loss-making company | Cash credit of 16% of the loss the relief creates |
| How the land was bought | Already contaminated or derelict when the company acquired it |
| Polluter pays | No relief if the company, or a connected person, caused the problem |
Capital spending that already earns capital allowances is excluded. The building allowance for structures is the one exception.
Contaminated land: what qualifies
Land is contaminated if something in, on or under it causes "relevant harm", or seriously risks it. The Act lists the harm: injury to living things, significant pollution of water, damage to the ecosystem, or significant damage to buildings.
Qualifying spending is the cost of finding out how contaminated the land is, then removing, treating or containing it. It covers staff, materials and work contracted to an unconnected firm. It must be spending that would not have happened if the land were clean.
Normal foundations, a basement dug for the scheme and general site clearance are not remediation. Work paid for by a grant or subsidy is out, and so is landfill tax.
Japanese knotweed
Knotweed has its own rules. It does not need to have been on the land when the company bought it. But taking knotweed material to landfill does not qualify; treatment on site or at an off-site centre does. HMRC treats an owner that lets an infestation spread as the polluter.
Derelict land: the 1998 test
Land is derelict if it is not in productive use and cannot be put into use without removing buildings or other structures. It must have been derelict throughout the period since 1 April 1998. If the company or a connected person first bought it before that date, the test runs from that purchase instead.
The relief covers a fixed list of works. These are the items a demolition and groundworks package removes:
- Post-tensioned concrete heavyweight construction.
- Building foundations and machinery bases.
- Reinforced concrete pilecaps.
- Reinforced concrete basements.
- Redundant services below ground: gas, water, drainage, electricity and telecoms.
The cost of finding out which of these structures are on the site counts too. HMRC says the list does not work by analogy.
How to claim Land Remediation Relief, and when
The relief is claimed in the company's corporation tax return. There is no special form; a computation reflecting the claim, filed in time, is enough. Timing is the part developers most often misjudge:
- A developer building to sell. Remediation is part of the cost of its stock. The deduction follows the accounts, so it usually arrives when the units are sold, often years after the spend.
- An investor holding the land. Revenue spending is deducted in the period it is charged in the accounts. Capital spending needs an election within two years of the end of the accounting period.
- A loss-making company. It can surrender the loss the relief creates for a 16% cash credit, which helps a scheme that has not sold anything yet.
Keep the site investigation, the remediation strategy, the contractor's itemised account and proof of how and when the land was bought. HMRC can ask for all of them.
Worked example
Illustrative only, with round numbers, not a real site.
A development company buys a former industrial yard in London that a previous owner contaminated. It spends £500,000 on qualifying remediation for a housing scheme.
| Without the relief | With the relief | |
|---|---|---|
| Deduction for remediation | £500,000 | £750,000 |
| Tax saved at the 25% main rate | £125,000 | £187,500 |
| Net cost after tax | £375,000 | £312,500 |
If the company makes a loss in that period, it can surrender up to £750,000 of it, capped at 150% of the spend. At 16% that is a cash credit of up to £120,000. A surrendered loss cannot also be carried forward.
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
The 2026 reform and the Budget
HM Treasury consulted on reforming the relief from 13 July to 21 September 2026. The options:
- Contamination tied to planning. Eligibility would follow the remediation the council requires as a planning condition.
- A new derelict land test. The 1998 date would be replaced. A 100% rate is being considered for land made derelict after 2027.
- Earlier relief for developers. Developers could deduct qualifying spending when it is incurred, not when the units sell.
The consultation said the government would conclude at the Budget. The Budget of 28 October 2026 contained no change to the relief, and the consultation page still says the feedback is being analysed. So appraise on today's rules.
The Budget did announce one brownfield measure. Residential brownfield schemes on sites up to 1.5 hectares in England will be exempt from Biodiversity Net Gain, with the timeline still to come.
Who qualifies, and the pitfalls
| Situation | Relief available? | Common pitfall |
|---|---|---|
| Developer company buys a contaminated former industrial site | Yes | Claiming normal groundworks that would have happened anyway |
| Company cleans up land it contaminated | No | A landlord claiming where its own tenant caused it |
| Individual or partnership developer | No | Relief is for companies only |
| Knotweed taken to landfill | No | Choosing landfill without checking the tax effect |
| Site empty for years but used after 1998 | No, under today's rules | Assuming any long-vacant site is derelict |
| Remediation funded by a grant | No, for the funded part | Counting grant-funded work twice |
Make the relief count in the appraisal
The relief is worth most when it is planned. That means a site investigation that separates contamination from normal ground, and a strategy the council accepts. Then a cost plan with remediation and clearance as their own lines.
Our site feasibility study starts with a free site appraisal by a director. Each option then becomes a cost plan by our own construction team, at worst case. Our guide to GDV and residual land value shows how those costs set what the land is worth. For whether your company trades or invests, see trading versus investment.
Our property development and warehouse conversion teams then deliver the build. Looking at a brownfield site? Send us the address and discuss your project with us.