RIBA Stage 2 Concept Design: What You Approve

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Small cardboard concept model of folded wall planes on a white table in sunlight

The short answer

RIBA Stage 2 is Concept Design, the third of the eight stages in the RIBA Plan of Work 2020. Its outcome is an architectural concept approved by the client and aligned to the project brief.

  1. The architect sets the layout, the shape and the look of the building.
  2. A first formal cost plan shows the concept fits the budget.
  3. Pre-application advice from the council is sought in this stage.
  4. You sign off a stage report before Stage 3 starts.

RIBA Stage 2 is Concept Design. It is the first stage where you see your building: its shape, its layout and how it will look. It is also the best time to change your mind, before structure and services are drawn around the concept.

This guide shows what you receive and what to sign off. Craftex takes projects from concept to construction drawings and then builds them. Have a concept already? Discuss your project with us.

What RIBA Stage 2 is

The RIBA Plan of Work 2020 splits a project into eight stages, numbered 0 to 7. Stage 2 follows the brief, which is written at Stage 1. Our guide to all the RIBA stages shows the full sequence.

The RIBA gives Stage 2 one outcome: "Architectural Concept approved by the client and aligned to the Project Brief."

The architectural concept is the vision for the project. It may start as several options. Each is tested against your brief until one is agreed.

Four core tasks sit in the stage.

  1. Prepare the concept. It includes the first engineering needs, such as structure and building services.
  2. Agree changes to the brief. The RIBA says the brief stays "live" in Stage 2 and may be adjusted to suit the concept.
  3. Hold design reviews. You and other interested parties comment, and the design is revised.
  4. Plan the design work. A stage design programme shows who does what, and when.

The team also agrees how the building will meet the Building Regulations. The RIBA says the design team always needs to be appointed before the start of Stage 2.

What you receive at Stage 2

The RIBA lists the information that changes hands at the end of Stage 2. This table puts each item in plain words.

What you receive at the end of RIBA Stage 2
RIBA itemWhat it isWhat to check
Stage reportA record of the decisions and the design, signed off by youIt shows the option you chose and why
Outline specificationEnough detail to understand each building system, such as floors, doors and the type of frameThe quality matches your budget
Cost planThe first formal estimate of the build costIt fits the project budget
Project strategiesShort plans for topics such as fire safety, planning and sustainabilityEach one has an owner
Project brief derogationsAgreed changes to your original briefYou accepted every change

The RIBA warns against asking for too much, too early. It says clients should consider what information is needed to deliver the stage outcome. Piles of detailed drawings are not always the answer.

It also says 3D tools, including virtual reality, are valid ways to review a design. Ask to walk through the concept before you approve it.

The cost plan at concept stage

Stage 2 produces the first formal cost plan. The RIBA says it must show that the concept and the outline specification are aligned to the project budget.

At this point the figure rests on the main elements and first bulk quantities, not on finished details. The RIBA says Stage 2 is "more about rules of thumb than detailed analysis". So read the cost plan as a test, not a quote.

Ask three questions.

  1. What is included. Check fees, fittings, external works and risk money are in or clearly out.
  2. What it assumes. A cost plan is only as good as the outline specification behind it.
  3. What happens if it is over. Changing the concept now costs less than changing it later.

Our guide to the construction cost plan shows how the figure firms up from stage to stage. Our guide to value engineering explains how to cut cost without cutting what matters.

Pre-application advice at Stage 2

Planning starts to shape the design here. The RIBA lists one planning task at Stage 2: obtain pre-application advice on the suitability of the initial proposal. The advice can come from a planning adviser or from the council.

The RIBA also lists an option. An outline planning application can test whether the scale and nature of the scheme would be acceptable.

A full application generally waits. The RIBA says applications are generally submitted at the end of Stage 3, Spatial Coordination. It notes that an early application creates several project risks. It recommends that route only for experienced clients.

Our guide to pre-application planning advice explains what to send and what you get back.

I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

Taron Papoyan, Google reviewSee all reviews on Google

Taking over a Stage 2 design

A project can change hands at Stage 2. The client has a concept and some visuals, and needs a team to finish the design and build it.

Medusa was one of ours. The Knightsbridge salon and spa reached us at Stage 2 with a concept and a few visuals. Our team completed the design and built it. The 180 sq m, £460K project took 17 weeks from concept to handover. Read the Medusa case study.

If you are handing a concept to a new team, collect this first.

  1. The stage report. Or the latest drawings and visuals if no report exists.
  2. The cost plan. With the date and what it leaves out.
  3. The outline specification. Even a short list of finishes helps.
  4. Surveys. A measured survey and any structural or services reports.
  5. Council advice. Pre-application letters and any planning history.
  6. Your rights to the drawings. Check your appointment lets you use them with a new team.

What one team that designs and builds changes

A concept is only worth approving if it can be built for your budget. That is hard to judge when the designer and the builder are different firms that meet later.

At Craftex the people who will build your concept judge it. Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.

One team draws the building, takes it through planning, prices it while it is drawn and builds it under one contract. The cost plan at Stage 2 comes from the people who will build it. Our people bring combined team experience of 834 design projects.

We take on projects from £100,000 to £10M and above in construction value. Want a second view on a concept before you sign it off? Discuss your project and send us what you have.

Frequently asked questions

What is RIBA Stage 2?

RIBA Stage 2 is Concept Design. The RIBA Plan of Work 2020 gives its outcome as an architectural concept approved by the client and aligned to the project brief.

What are the RIBA Stage 2 deliverables?

The RIBA lists a signed-off stage report, project strategies, an outline specification, a cost plan and any agreed changes to the brief, which it calls project brief derogations.

Is planning permission applied for at RIBA Stage 2?

Not as a rule. The RIBA says applications are generally submitted at the end of Stage 3. At Stage 2 the team obtains pre-application advice. An outline planning application is listed as an option.

Who needs to be appointed for Stage 2?

The design team. The RIBA says no design team is required for Stages 0 and 1, and its task bar shows the design team appointed before Stage 2 begins.

How detailed is a Stage 2 design?

The RIBA says Stage 2 is more about rules of thumb than detailed analysis. Some calculations may still be needed, such as stair or riser sizes. Detail is added at Stage 3.

Can another team take over a Stage 2 design?

Yes. Hand over the stage report, the cost plan, the outline specification, the surveys and any council advice. Check your appointment lets you use the drawings with a new team.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Want your concept taken through to a finished building?

Our architects complete the design and our construction team builds it under one contract. Send us what you have. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us