Best Data Centre Construction Companies in the UK: How to Choose
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
The best data centre construction company for you depends first on the size of your facility. A hyperscale campus and a server room in an office need very different contractors.
- Match the contractor type to your IT load and site.
- Ask which resilience standard the design follows.
- Ask how power and cooling allow for growth.
- Ask who carries the risk for the whole room.
Search for data centre construction companies in the UK and you get league tables of giant contractors. They build hyperscale campuses measured in tens of megawatts. That is no help if you need a server room in your office or a data hall in a basement.
We are data centre construction contractors in London and the UK: we build and fit out data halls, plant rooms and the infrastructure around them. This guide compares the specialist firms the market knows, so you can brief the right one.
This guide sorts data centre contractors by the size of facility they suit. It covers seven criteria, how the types compare and where we fit.
Since September 2024 the UK has classed data centres as Critical National Infrastructure. That raised the bar on resilience for facilities of every size. Planning a data room? Book a site visit and we'll check the space with you.
Match data centre construction companies to your facility size
Choose the type of contractor before you compare firms. Size and setting decide it.
| Contractor type | Typical project | Watch for |
|---|---|---|
| Hyperscale or mission-critical contractor | Large campuses and purpose-built halls | Minimum project size |
| Specialist M&E or critical-systems contractor | Plant and systems upgrades | Building, fire and finishes left to others |
| Modular data hall vendor | Prefabricated halls on a prepared site | Planning, access and site preparation |
| IT integrator or comms room installer | Racks, cabinets and cabling | Building works outside its scope |
| Design and build fit-out contractor with M&E | Data rooms, edge sites and server rooms inside existing buildings | Check its record matches your load and size |
If you're building a large purpose-built campus, choose a contractor that builds those every year. Our own projects are a few hundred square metres, inside existing buildings.
Seven criteria for a data centre contractor
These apply at every size. Ask each bidder to answer them in writing.
1. Resilience to a stated standard
Resilience is described as redundancy: N, N+1 or 2N. It also covers whether systems can be maintained without a shutdown. Many clients state a target using the Uptime Institute's Tier levels or BS EN 50600. Ask which standard the design follows and who certifies it.
2. Power, from the supply inward
For new sites, the grid connection often sets the programme. For upgrades, the questions are UPS capacity, generators, transfer switching and dual feeds. Ask who designs the electrics and who carries the risk if the supply falls short.
3. Cooling matched to rack density
Hot and cold aisle containment suits many enterprise rooms. Higher densities may need in-row or liquid cooling. Ask how the design allows denser racks later without rebuilding the room. Our guide to energy-efficient data centre construction covers cooling in depth.
4. Fire protection and security
Gas suppression protects equipment without water damage. Access control, CCTV and audit trails are now standard. Regulated sectors such as finance and healthcare expect them.
5. Working in a live building
Most enterprise projects happen inside a building that is running. There are offices above, racks next door and a network that can't go down. The method for cutover and migration matters more than the drawings.
6. Commissioning and documents
Integrated testing of power, cooling, fire and controls together proves resilience. Ask which commissioning stages are included and who witnesses them. Ask what documents you get for audits and insurers.
7. One party for the whole room
Data rooms combine building works, electrics, cooling, fire, security and cabling. If each sits with a different firm, faults fall between them. Ask who carries the design and performance risk for the whole room.
As a data centre construction company, we build the room as one team: power, cooling, fire suppression and security.
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
What our projects show
The projects we can show you in full are the work that sits around a data room: services, security and working inside a live building. Judge us on those.
Cabling and security in a working building
At Beaumont House in Kensington, we replaced the lighting and wiring of a 750 sq m office in three weeks. Data cabling runs under the floor to every workstation. CCTV and access control cover the whole office. The other offices in the building kept working throughout.
Full M&E around tenants who could not stop
At Portsoken House in Aldgate, we delivered a full mechanical and electrical package across two floors in seven months. The rest of the building was let and occupied. We worked on the reception only at night and at weekends, so nobody in the building was disturbed.
Where Craftex fits, and where it doesn't
We take on data rooms, edge sites and server rooms inside existing buildings across the UK. Our construction projects run from £100,000 to £10M+. Around 60% of our labour is in-house, and we carry £10M public and employers' liability cover.
We are not the right fit for:
- Hyperscale and large colocation builds. Choose a contractor that builds those every year.
- A rack or two in a comms cupboard. An IT integrator will do it faster and for less.
- Equipment supply only. We design and build the room and its infrastructure, not resell hardware.
See our data centre construction services and data centre fit-out and infrastructure pages for the full scope.
How to brief data centre construction companies
- State the IT load now and in five years, and the resilience you need.
- Share the building limits: floor loading, ceiling heights, risers, plant space, access and supply.
- Set the rules: what can't be switched off, maintenance windows and security vetting.
- Ask each bidder for its commissioning plan and handover documents, not only a price.
- Compare who carries the design and performance risk for the whole room.
Send that brief to our data centre contractors and we'll come back to you the same working day.
If you're adding or upgrading a data facility in your own building, book a site visit. We'll check the space, the power and the cooling routes with you.