Skip to content
Request a callbackCallback

For homeowners, developers and building owners

Part A Building Regulations: Approved Document A Explained

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Steel props, scaffold and new steel beams carrying the floor above during building work

The short answer

Part A of the Building Regulations 2010 covers structure. Approved Document A is the government guidance on how to meet it, through three requirements: loading, ground movement and disproportionate collapse.

  1. A1: the building must carry its loads safely down to the ground.
  2. A2: foreseeable ground movement must not make the building unstable.
  3. A3: an accident must not cause a collapse out of proportion to its cause.
  4. It applies to new buildings, extensions and changes to the structure.

Part A building regulations cover structure: the rules that stop buildings falling down. Approved Document A is the government guidance on how to meet them. Together they apply to new buildings, extensions and any change to a structure in England.

Our structural engineers design to Part A every day and deal with building control for you. Changing a structure? Send us your drawings and we will tell you what Part A asks of it.

This is general information for England, not engineering advice. A structural engineer must look at your building and your plans.

What Part A building regulations require

Part A sits in Schedule 1 of the Building Regulations 2010. It has three requirements. Each one is short, and each one carries a lot of engineering behind it.

The three requirements of Part A, in plain words
RequirementWhat the law asksIn plain words
A1 LoadingDead, imposed and wind loads are carried safely to the groundThe building holds its own weight, its contents and the wind
A1 LoadingWithout movement that harms the stability of another buildingYour work must not push or pull on next door
A2 Ground movementSwelling, shrinking or freezing subsoil, landslip or subsidence must not impair stabilityFoundations must cope with ground that moves, where the risk can be foreseen
A3 Disproportionate collapseAn accident must not cause collapse out of proportion to its causeOne damaged part must not bring the whole building down

Dead load is the weight of the building itself. Imposed load is what goes in it: people, furniture, stored goods. Clay that shrinks in a dry summer is one ground movement A2 deals with. Our guide to subsidence cracks shows what happens when it does.

What Approved Document A contains

Approved Document A is guidance, not the law. It says so itself: there is no obligation to follow any solution in it if you meet the requirement another way. The version on GOV.UK is the 2004 edition with 2010 and 2013 amendments.

GOV.UK says it covers the loads on a building and its structural parts: foundations, walls, floors, roofs and chimneys. It has five sections.

  1. Section 1: codes and standards. For every building type. It lists the Eurocodes, the European design standards engineers use.
  2. Section 2: sizes for small, traditional buildings. Size rules for houses and small buildings: stability, timber, wall thickness, chimneys and plain concrete foundations.
  3. Section 3: wall cladding. How heavy cladding is held and fixed.
  4. Section 4: roof covering. What to check when a roof is re-covered.
  5. Section 5: disproportionate collapse. How to make a building robust, by its consequence class.

Timber joist span tables are no longer in it. Government guidance points to the TRADA span tables or BS 8103 Part 3 instead.

When Part A applies to your project

Part A applies whenever there is "building work", as regulation 3 defines it. Three kinds matter most for structure.

  1. New buildings and extensions. All of Part A applies.
  2. Material alterations. A change that would make the building worse against Part A. Taking out a load-bearing wall or a chimney breast is the everyday example.
  3. Underpinning. Regulation 3 names work involving the underpinning of a building as building work in its own right.

Regulation 4 adds a fair rule for older buildings. If a building did not meet a requirement before, the work must not make it worse. Approved Document A also says Part A applies to certain changes of use.

Our guides walk through two common jobs: removing a load-bearing wall and chimney breast removal. Basements need both planning permission and building regulations approval, government guidance says.

Approved Document A and disproportionate collapse

Requirement A3 asks that an accident does not bring down far more of the building than it hits. Approved Document A sorts buildings into consequence classes. The higher the class, the more the engineer must do.

Building consequence classes, from Approved Document A Table 11 (summary)
ClassExamples from the table
1Houses of no more than 4 storeys; agricultural buildings
2a, lower riskFlats, hotels and offices of no more than 4 storeys; 5-storey single occupancy houses
2b, upper riskFlats, hotels and offices of more than 4 and no more than 15 storeys; hospitals of no more than 3 storeys
3Buildings beyond the 2a and 2b limits; grandstands for more than 5,000 people

For Class 1, Approved Document A says no extra measures are likely to be needed if the rest of its guidance is followed. From Class 2a up, it asks for ties that hold floors and walls together. Class 2b adds vertical ties or a check that the building stands if one support is lost.

We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

Apartify Estates, Google reviewSee all reviews on Google

How building control checks Part A

Building control checks that your design meets Part A, then inspects the work. You choose who does it: your council, or a private registered building control approver. Both follow the same regulations.

Routes to building regulations approval (GOV.UK)
RouteWhat it meansTiming
Full plansDrawings and calculations checked before work startsDecision within 5 weeks, or 2 months with your consent
Building noticeFor smaller projects, no formal plan approvalWork can start 2 days after the notice
RegularisationApproval after the event, from the council onlyFor work carried out after 11 November 1985

For Part A, the calculations and structural drawings come from the engineer. GOV.UK says you usually get a completion certificate within 8 weeks of finishing, if the work complies.

Regularisation is the costly route. Government guidance says it can be very disruptive: covered work may be opened up to check a steel beam's size.

Taller residential buildings follow a different route. GOV.UK says a higher-risk building needs approval from the Building Safety Regulator. That means at least 7 storeys or 18 metres, with at least 2 homes. Our guide to planning and building regulations drawings shows what goes in each set.

Our structural engineers and Part A

Part A is where a design becomes something a builder can build and an inspector can sign. Our structural engineers write the calculations, draw the details and answer building control's questions. Then our builders build to them.

Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.

Our team has delivered structural work at Slingsby Place in Covent Garden: strip-out, demolition and a new structure behind kept façades. We take on projects from £100,000 to £10M and above in construction value, and single homeowner jobs too.

Send us your drawings and we will tell you what Part A asks of your project. We quote a fixed fee after the first call.

Frequently asked questions

What is Approved Document A?

It is the government's guidance on how to meet Part A, the structure part, of the Building Regulations 2010 in England. It covers loading, ground movement and disproportionate collapse.

Is Approved Document A the law?

No. The law is Part A of Schedule 1 to the Building Regulations 2010. Approved Document A says there is no obligation to follow any particular solution in it if you meet the requirement another way.

Which edition of Approved Document A is current?

The version on GOV.UK on 21 November 2026 is the 2004 edition with the 2010 and 2013 amendments. GOV.UK says the Building Safety Regulator now keeps the Approved Documents under review.

Do I need building regulations approval for structural work?

Usually, yes. A change that makes a building worse against Part A is a material alteration, which is building work. GOV.UK sets out full plans, building notice and regularisation as the routes to approval.

Where are the timber joist span tables now?

Not in Approved Document A. Government guidance points to the TRADA span tables for solid timber in dwellings, or to BS 8103 Part 3 for timber floors and roofs in housing.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Need a structural design that meets Part A?

Our structural engineers calculate, draw and deal with building control, and our builders build it. Send us your drawings. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us