Skip to content
Request a callbackCallback

For homeowners opening up walls, and their builders

Steel Beam Calculator vs Engineer: Sizing an RSJ

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read

Steel beams on padstones and block piers opening up the back of a house for an extension

The short answer

A steel beam calculator online cannot tell you which RSJ your house needs, because it cannot see what the beam will carry. A structural engineer works out the loads, chooses the steel section and checks both ends, and the calculations go to building control.

  1. RSJ is the everyday name for a steel beam; the engineer's drawing names the exact section.
  2. The size depends on the span, what sits above, how far the beam may bend and what its ends rest on.
  3. The ends may need padstones, blocks of dense concrete that spread the load.
  4. Send us your span and photos: our engineers size the beam and our builders fit it.

People look for a steel beam calculator because they want a size before they pay anyone. The honest answer is that no online tool can see what your beam will carry. This guide shows how a structural engineer chooses an RSJ, what you can do yourself and what must be calculated.

It gives no beam sizes, on purpose. Our engineers do the steel beam calculations for your house, and our builders fit the beam. Opening up a wall? Send us your span and photos of the wall.

Why a steel beam calculator cannot size your RSJ

A beam does one job. It takes the weight that a wall used to carry and passes it to the walls or posts at each end. To size it, you need to know that weight, and a calculator does not.

Part A of the Building Regulations sets the rule. The building must carry its dead, imposed and wind loads to the ground safely. It must do so without bending or moving enough to harm the building or the one next door.

Dead loads are the weight of the building itself: floors, walls, roof tiles. Imposed loads are what people put in it: furniture, baths full of water, people. Wind loads push on the walls and roof.

What an online calculator cannot see
What the engineer checksWhy it changes the beam
What sits above the wallA roof, a wall, floor joists or an old chimney stack each add weight
How the floors are builtTimber and concrete floors weigh very different amounts
How far the beam may bendA beam can be strong enough and still bend enough to crack ceilings
What the ends rest onThe wall under each end must carry the load without crushing
Fire protectionA steel beam normally needs protecting against fire

Planning Portal guidance lists what a load-bearing wall may support. It names the roof, a wall above and floor joists. It also names a beam under an old chimney stack.

What RSJ means and how steel sections are named

RSJ stands for rolled steel joist. People use it for almost any steel beam. An engineer's drawing is more exact and names the section type.

SteelConstruction.info, a steel design reference site, explains the main types. Universal beams, universal columns and parallel flange channels are each defined by a serial size and a weight per metre.

The names you will see on a steel drawing
On the drawingShort forWhat the name tells you
UBUniversal beamDepth and width of the section, then its weight per metre
UCUniversal columnThe same, for a section shaped to work as a post
PFCParallel flange channelA C-shaped section with parallel top and bottom plates
RSJRolled steel joistThe everyday name, not a size

The serial size gives the depth and the flange width. The flanges are the flat top and bottom plates of the beam. A heavier section of the same serial size has thicker steel. The nominal sizes are set out in a British Standard, BS EN 10365.

How engineers choose a steel beam size

An engineer sizes a beam in seven steps. Each one needs facts about your house that no website has.

House being opened up for an extension, with blockwork piers and floor joists exposed
  1. Measure the opening. The clear width, plus the length the beam needs to sit on at each end.
  2. Trace the loads. Follow every floor, wall and roof that rests on the wall, from the top down.
  3. Add them up. Dead, imposed and wind loads, each worked out from the materials and the use.
  4. Pick a section. One strong enough to carry the load, and stiff enough not to bend too far.
  5. Check the ends. Planning Portal guidance says a new beam should normally have at least 150mm bearing on each side.
  6. Size the padstones. A padstone is a block of dense concrete that spreads the load into the wall below.
  7. Plan the props and fire protection. Props hold the house while the wall comes out; the beam is then boxed in to resist fire.

The output is a set of calculations and a drawing. Our guide to structural calculations shows what that set contains.

RSJ cost and what drives it

There are two costs: the design and the work. For the design, HomeOwners Alliance's 2026 guide gives £60 to £950 for calculations for an RSJ. That is a market figure from a consumer advice site, read on 21 November 2026, not our price.

We price the work after a visit, because these things set the figure.

  1. Length and weight. A longer or heavier beam needs more people or a lifting aid to get it in.
  2. Access. A beam carried through a terrace house is slower than one lifted in from the side.
  3. Props and protection. The house is held up while the wall comes out.
  4. Padstones and piers. New supports at the ends may need building or strengthening.
  5. Making good. Fire boarding, plaster, floors and decoration after the beam is in.

Our structural engineers give you a fixed fee for the design after the first call. Our builders then price the work from the drawing.

What building control checks

Changing a structure can be a material alteration under the Building Regulations 2010. Part A, structure, is one of the rules the work must keep meeting. So the beam goes through a building control body: your council, or a registered building control approver.

GOV.UK lists the routes. Full plans is the most thorough. A building notice is for smaller projects only. Either way, the engineer's calculations and drawing are how you show the beam was sized for its loads.

Approval after the event is harder. The government's notes on Approved Document A say covered work may need to be exposed to check the size of a steel beam. That happens when an owner asks for approval after the work, through regularisation.

Our guide to removing a load-bearing wall covers the whole job, from the first check to making good.

I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

Lia Lavryk, Google reviewSee all reviews on Google

What to send us for a beam design

You can save a visit by sending the right things first. With these, our engineers can tell you what they need to see and give you a fixed fee.

  • The width of the opening you want
  • Photos of both sides of the wall, the ceiling and the floor above
  • What is above it: rooms, a bathroom, a chimney breast, the roof
  • The age and type of the house: terrace, semi, flat, detached
  • Any drawings you already have

Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.

The engineer who sizes the beam works in the same team as the builders who prop the house and fit it. You deal with one firm from the first photo to the boxed-in beam. Our people bring combined team experience of 561 major construction projects.

Building an extension as well? Our guide to house extension costs in London covers the wider budget. Ready to open up the wall? Send us your span and we start with the loads.

Frequently asked questions

What size RSJ do I need?

Nobody can say without working out the loads. A structural engineer sizes the beam from the span, what sits above it and what its ends rest on. Send us your span and photos and we give you a fixed fee for the design.

Can I use an online steel beam calculator?

It cannot see what your wall carries, how your floors are built or what the ends of the beam will sit on. Use it at most as a rough idea. The beam you order should come from an engineer's calculations.

Does fitting a steel beam need building regulations approval?

Work that changes the structure can be a material alteration under the Building Regulations 2010, and Part A (structure) is one of the rules it must meet. Check with building control before you start, or let our team handle the application.

What is a padstone?

A block of dense concrete under each end of the beam. Planning Portal guidance says it spreads the load so the wall below is not crushed. The engineer sets its size with the beam.

How much do RSJ calculations cost?

HomeOwners Alliance's 2026 guide gives £60 to £950 for calculations for an RSJ, as a market figure. Our structural engineers give you a fixed fee after the first call.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Want the beam sized, approved and fitted by one team?

Our engineers calculate and draw the beam, and our builders prop the house and fit it. Send us your span and photos. We reply within one hour, Monday to Saturday, 8am to 6pm.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us