Structural Calculations: What They Include and When Needed
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
Structural calculations are an engineer's written proof that a beam, wall, floor or foundation can carry its loads safely. They show building control that the work meets Part A, the structure part of the Building Regulations.
- A set lists the loads, the member chosen and the checks it passes, with a drawing.
- You may need them to remove a load-bearing wall, add a floor, extend, convert a loft or underpin.
- Beam, padstone and lintel calculations are small sets for one opening.
- Our structural engineers write them, and our builders build from them.
Structural calculations are the engineer's proof that part of a building can carry its weight safely. They turn a beam, a wall or a foundation into numbers that building control can check. This guide explains what a set includes, when you need one and how to get it.
Our engineers write structural calculations for homes and larger buildings, and our builders build from them. Has building control asked for calculations? Send us your drawings and we tell you what is needed.
What structural calculations are
Every part of a building carries weight and passes it down to the ground. Calculations follow that weight from the roof to the soil. At each step they show the part chosen is strong enough and stiff enough.
Part A of the Building Regulations sets three rules for structure. A1 says the loads must reach the ground safely, without bending or moving enough to harm the building next door. A2 covers ground movement. A3 says an accident must not cause a collapse out of proportion to its cause.
Approved Document A is the government's guidance on meeting those rules in England. It also lists the design standards engineers use, the Eurocodes. Calculations are where those standards are applied to your building. Our guide to Part A building regulations explains each rule.
What a set of structural calculations includes
A set of calculations reads like a short report. A small job may be a few pages. A building may be a thick file. The parts are the same.
| Part | What it shows |
|---|---|
| Design basis | The standards used, such as the Eurocodes listed in Approved Document A |
| Loads | Dead loads (the building's own weight), imposed loads (people and furniture) and wind |
| Load path | How the weight travels from the roof down to the foundation |
| Members chosen | Each beam, column, joist or lintel, named by type and size |
| Checks | Strength, bending, and how far each member may deflect, meaning sag |
| Ends and connections | Bearings, padstones and bolts where members meet walls or each other |
| Foundations | How the new load reaches the ground, and any work to the foundations |
| Drawing or sketch | Where each member goes, so the builder can build it |
The drawing matters as much as the numbers. A builder works from the drawing. Building control reads both. Keep both with the house papers: a future buyer's surveyor or lawyer may ask how a wall was taken out.
When you need structural calculations for building regulations
Under the Building Regulations 2010, building work includes extending a building, making a material alteration and underpinning. An alteration is material if it would leave the building failing a rule it met before. Part A, structure, is one of those rules.
So when a job changes how the building carries weight, building control needs to see that Part A is still met. Calculations and drawings are how an engineer shows it.
- Removing or opening up a load-bearing wall. The new beam and its supports.
- Loft conversions. New floor joists, beams and any change to the roof structure.
- Extensions. Foundations, beams over openings and any steel frame.
- Basements and underpinning. Walls, floors, foundations and the digging order.
- Extra storeys and heavy loads. The structure below must carry the new weight.
GOV.UK lists two main routes. Full plans is the most thorough, with a decision usually within 5 weeks, or 2 months if you agree. A building notice is for smaller projects only and gives no formal approval.
Beam, padstone and lintel calculations
The smallest sets cover one opening in a wall. Each one checks a single part and what it rests on.
| Calculation | What it checks |
|---|---|
| Beam calculation | The steel or timber beam that replaces a wall or spans a new opening |
| Padstone calculation | The concrete block under each end of the beam, so the wall below is not crushed |
| Lintel calculation | The beam over a new or wider window or door |
Planning Portal guidance says a new beam should normally have at least 150mm bearing on each side. It adds that a padstone of dense concrete may be needed to spread the load. A steel beam should normally be protected to resist fire for 30 minutes.
Our guide to steel beam and RSJ sizes shows how the engineer picks the beam itself.
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
How much structural calculations cost
There is no national price list. HomeOwners Alliance, a UK consumer advice website, gives these market ranges in its 2026 guide. We read it on 21 November 2026. They are market figures, not our prices.
| Service | Market range |
|---|---|
| Calculations for an RSJ | £60 to £950 |
| Basic project | £350 to £450 |
| Complex project | up to £10,000 |
The fee depends on how many members need checking, how much is known about the building and whether a site visit is needed. Our structural engineers give you a fixed fee after the first call.
How to get structural calculations from our team
Send us what you have and we tell you what the calculations need to cover. These items save a visit or a second round of questions.
- Your architect's or builder's drawings, if you have them
- Photos of the wall, opening or area, and the rooms above
- The age and type of the building
- Any notes from building control
Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.
Our engineers write the calculations and drawings. Our builders build from them, so a question on site is answered inside one team. Our people bring combined team experience of 834 design projects and 561 major construction projects.
Work already done without approval? Our engineers can inspect and write up what is there for regularisation. Whatever stage you are at, send us your drawings and we start with the loads.