What Does a Structural Engineer Actually Do?
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
A structural engineer works out how a building carries its weight and makes sure it does so safely. They inspect, calculate the loads and design beams, walls, floors and foundations, then produce the calculations and drawings that building control checks.
- Homeowners call one to remove a wall, convert a loft, extend, dig a basement or check a crack.
- Developers need one for the frame, the foundations and the temporary works that hold a site up.
- An architect designs how a building looks and works; the structural engineer makes sure it stands up.
- Our structural engineers work in one team with our architects and builders.
What does a structural engineer do? In plain words, they make sure a building stands up. They work out the weight each part carries, choose beams, walls and foundations that can take it, and prove it on paper.
This guide covers what that means on a house, an extension or a bigger scheme, and when you need one. Our structural engineers work in the same team as our architects and builders. Have a job in mind? Send us your drawings or a few photos.
What a structural engineer does day to day
The National Careers Service, the government's careers site, lists the core tasks. A structural engineer could do all of these:
- Work out the loads and stresses on different parts of a building
- Investigate building materials such as glass, steel and concrete
- Develop engineering plans using computer software
- Use computer models to predict how structures react to the weather
- Inspect unsafe buildings and decide whether they should be demolished
- Work out why and how buildings have collapsed
On a real job these tasks turn into three things you can hold: an inspection or report, a set of calculations, and drawings. Building control and the builder work from those.
The rules behind the work are in Part A of the Building Regulations. It covers loading, ground movement and disproportionate collapse. That last one means an accident must not cause a collapse out of proportion to its cause.
What a structural engineer does on a home project
A home job that touches the structure needs an engineer's design. The table shows what the engineer does on each one and what you receive.
| Your job | What the engineer does | What you receive |
|---|---|---|
| Removing a wall | Checks if it is load-bearing, traces the loads, designs the beam | Calculations and a beam drawing |
| Loft conversion | Checks the joists and roof, designs new floor beams and supports | Calculations and drawings for building control |
| Extension | Designs the foundations, beams and openings into the house | Calculations, foundation and steel details |
| Basement | Designs the underpinning, walls and temporary works | Calculations, drawings and a digging sequence |
| Cracks or movement | Inspects, finds the likely cause, says what to do | A written report, and a repair design if needed |
Planning Portal guidance says a structural engineer or surveyor can be employed to decide if a wall is load-bearing and then design a beam. Our guide to steel beam and RSJ sizes shows how that beam is chosen.
When you need a structural engineer
You need one whenever you change how weight travels through a building, or when you see signs that it has stopped travelling safely. These are the main triggers.
- Taking out or cutting into a wall. Any wall that may carry floors, a roof or a wall above.
- Adding weight. A loft room, an extra storey, a heavy bath or a roof terrace.
- Digging. Extensions, basements and new foundations, especially next to a neighbour.
- Movement. Cracks that are new or growing, doors that stick, floors that slope.
- Buying. A survey flags structural movement and you need to know what it means.
- Developing. Any new building, conversion or frame needs a structural design.
Under the Building Regulations 2010, building work includes extending a building, a material alteration and underpinning. Part A is one of the rules that work must meet. A structural engineer's design is how you show it does.
Structural engineer vs architect, civil engineer and surveyor
Four professionals can work on the same building. Each answers a different question.
| Professional | The question they answer | What they produce |
|---|---|---|
| Architect | How should the building look, work and get planning approval? | Design and planning drawings |
| Structural engineer | Will it stand up, and how? | Calculations and structural drawings |
| Civil engineer | How is a wider construction project designed and managed? | Designs for projects such as buildings, bridges, flood defences and transport links |
| Surveyor | What condition is the building in? | A survey report, such as a RICS Home survey |
The National Careers Service describes civil engineers as designing and managing construction projects such as buildings, bridges, flood defences and transport links. Structural engineering is the part that deals with how a structure carries load.
The RICS describes its most detailed home survey, level three, as giving detailed information about the structure and fabric. A surveyor flags a problem. An engineer designs the fix. Our guide to structural survey cost compares the two.
How the engineer's work goes through building control
The engineer's calculations and drawings go to a building control body. That is your council's building control team, or a registered building control approver. You choose which.
GOV.UK lists three routes. Full plans is the most thorough option. A building notice is for smaller projects only. Regularisation is retrospective approval for work done without consent, and only councils give it.
Our guide to planning and building regulations drawings shows how the engineer's drawings sit with the architect's.
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
How to brief a structural engineer
A good brief saves a visit and gets you a firm fee. Our guide to structural engineer cost shows what drives the fee. Send these with your first message.
- What you want to do, in one or two sentences
- Photos of the wall, crack or area, and of the rooms above and below
- The age and type of the building
- Any drawings, surveys or old approvals you have
- Your timing, and whether builders are already booked
One team that designs, calculates and builds
When the engineer and the builder are separate firms, the builder has to read the drawing, price it and build it. Questions on site go back and forth between two firms.
Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.
Our structural engineers inspect, calculate and sign off the design. Our builders prop, dig and fit from the same drawings, and questions are answered inside one team.
Our team delivered the structural works at Slingsby Place in Covent Garden. The street walls were held on temporary works while the building behind them was taken out and a new base formed. Read the Slingsby Place case study.
Homeowners are welcome, from one wall to a whole house. Developers get the same team for frames, conversions and basements. Send us your drawings and tell us what you plan.