Commercial to Residential Conversion in Sussex
Offices, parades of shops and former pubs in East and West Sussex re-planned as flats, with planning, design and the build in one contract.
Our track record
100% of projects delivered aheadof programme and on budget
What our team has delivered
- 2made from an old retail unit in Chelsea, with the agreed quote kept (client review)
- 4made from an old warehouse near Tower Bridge, on plan and on time (client review)
- 1,100in the Holborough Lakes masterplan on a former quarry in Kent, a team scheme
- 7in the largest of four costed options for Allitsen Road
Sussex buildings that have stopped earning, re-planned as homes
We handle commercial to residential conversion across Sussex: Peacehaven and the coast road, Haywards Heath and Burgess Hill, Crawley, Worthing, Eastbourne, Horsham and the edges of Brighton and Hove. Our team works out the planning route, designs the flats, fixes the price and builds them.
The buildings vary more than the county's size suggests. Seafront and parade shops with flats possible above, 1980s offices in the market towns, business-park blocks near Gatwick and former pubs and halls all need a different route through the council. We tell you which one applies before you spend money on drawings.
From our office in central London we reach most of Sussex in about an hour and a half. Our own trades carry out most of each project, and one director is your contact from the first site visit to the day the last flat is handed over.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Which Sussex buildings we turn into flats
From the first layout to the last certificate, one firm. More on the service nationally: commercial to residential conversion; for a house split into flats, house to flats conversion.
Market-town offices
Two and three-storey offices in Haywards Heath, Horsham and Lewes, re-planned around their stairs and windows.
Parades and seafront shops
Shops along the coast road and in town parades, with homes made in the floors above or behind.
Business-park blocks
Office buildings in the Crawley and Gatwick business areas, where parking and access shape the scheme.
Former pubs and halls
Pubs, clubs and church halls, which sit outside Class E and go through a full planning application.
Floors added on the roof
An extra storey or two of homes where the building and the planning route can take the load.
Interiors built to sell
Fitted kitchens, bathrooms, flooring and storage specified for the buyers or tenants in that town.
Peacehaven, Haywards Heath and the rest of Sussex
Peacehaven, on the cliffs between Brighton and Newhaven, grew up along the coast road, and its parades mix shops and offices with space above that is often empty. Haywards Heath and Burgess Hill sit on the Brighton main line to London, so flats near their stations appeal to commuters. Crawley, beside Gatwick, has the county's biggest stock of offices, many of them in purpose-built blocks.
Along the coast, Worthing, Bognor Regis and Eastbourne have period commercial buildings on and behind the seafront, while Chichester, Horsham and Lewes bring conservation areas and listed facades into almost every scheme.
Sussex schemes we take on range from the floor above a single parade shop to an entire office building, at construction values from about £100,000 past £10M.
National park, protected landscapes and water: what limits a Sussex scheme
Under Class MA, a building used within Class E for at least two unbroken years can become flats through prior approval rather than a full planning application. The council's scope is limited to a set list of matters, among them transport, flooding, noise and daylight in each habitable room, and each flat has to meet the national space standard.
In Sussex the map matters more than usual. Class MA does not apply inside a national park, and the South Downs National Park takes in a large share of the county between Eastbourne and the Hampshire border. Areas of outstanding natural beauty are excluded too, including the High Weald and Chichester Harbour, and so are listed buildings anywhere.
Parts of Horsham, Crawley and Chichester districts draw water from the Sussex North supply zone, where councils have asked new homes to show water neutrality; we check the current position before the layouts are drawn. On the coast and in the river valleys, flood risk is assessed as part of the application.
Pubs, halls and buildings outside Class E
A pub, a social club or a church hall is not in Class E, so it cannot use prior approval. Each one needs a full planning application, and a pub that is listed as an asset of community value gives the local community a chance to bid before it is sold.
These buildings are often the best conversions in a Sussex town: solid walls, high rooms and a central site. We show the council what the building offers as homes, keep the features that matter in a conservation area, and prepare the change of use with the design, so one scheme goes in. More on change of use applications.
How it works
From survey to keys in Sussex
01
Visit and verdict
A director surveys the building and tells you what it can become and through which route.
02
Scheme and figures
Layouts drawn to the space standard, a build cost and a programme, so you can run your numbers.
03
Consent
Prior approval or a full application prepared, submitted and followed through to a decision.
04
Drawings and contract
Fire, acoustic and services design finished, then a single contract sum for the works.
05
Works and handover
Our trades on site, building control sign-off and every certificate in the handover file.
The Craftex Guide to Office to Residential Conversion
Which planning route applies, the space standards your flats must meet, fire safety and a checklist to run through before you buy, borrow or appoint a contractor. Free, and written by the team that does the work.
Our terms for Sussex conversions
Six promises in the contract
What you can hold us to on every building we convert.
-
The route before the drawings
Planning route and flat count confirmed before design fees start.
Allitsen Road: four schemes priced in four weeks
-
A sum that does not drift
Changes only go ahead once you have their price in writing and have said yes.
Chelsea shop-to-flat client: quote kept
-
Built around your exit
We run design and site work side by side so the flats can be sold or let from the date agreed.
From a client review: 8 apartments from an office, 2 months early
-
Directly employed trades
Roughly 60% of the people on our sites work for Craftex.
-
£10M of cover
£10M each of public liability, employers' liability and professional indemnity cover.
-
A complete handover file
Completion certificate, test certificates and manuals ready for the lender, the warranty and buyers.
Already have a quote? Send it to us. We'll beat it.
Already priced your Sussex conversion with another firm? Send their figure with the plans. We read the scope item by item, then return our own fixed sum for the identical work, together with a timetable.
Compare your quotes
What goes wrong on Sussex conversions, and our answer
Six points to compare between the tenders on your desk.
| Area | The usual risk | With Craftex |
|---|---|---|
| Protected land | National park or AONB status found after purchase | The map and designations checked on day one |
| Use class | A pub or hall pushed through the wrong route | Class E or full planning decided before design |
| Water and flooding | Raised by the council late in the process | Covered in the application from the start |
| Light and layout | Flats redrawn after the daylight check | Every room tested before layouts are fixed |
| Fire separation | Designed by whoever installs it | Fire strategy agreed with building control first |
| Completion | Snags and missing certificates at sale | Signed off and documented at handover |
What a Sussex conversion costs in 2026
Build rates we charge in 2026 per m² of gross internal floor, excluding VAT and professional fees.
| Finish | Suits | Per m² of floor | Example: 400 m² building |
|---|---|---|---|
| Essential | Rented flats and student lets | £880–1,035 | £352,000–414,000 |
| Standard | Flats for sale in the towns | £1,150–1,350 | £459,000–540,000 |
| Premium | Seafront and period buildings | £1,490–1,755 | £597,000–702,000 |
| Added storey | New flats on the roof | £1,440–2,025 | Per m² of the new floor |
Land, finance, agents' and legal fees are not included. Keep 5–10% aside for what opening up the building reveals. Most of the work on a conversion to homes is charged VAT at 5%: see VAT on conversions.
A detailed cost plan starts at £750 + VAT and is credited when you build with us.
Free cost calculator
Estimate your Sussex conversion
Key in the floor area and choose a finish level for an early range at our 2026 rates.
Homes our team has planned and delivered
-
St John's Wood, London Allitsen Road: a derelict members' club tested as flats, from four to seven homes, priced option by option. View case study
-
Our team's scheme: Kent Holborough Lakes, Snodland: a former quarry turned into a lakeside housing development. View case study
-
Islington, London Collingwood House: up to nine new flats planned on the roof of an occupied block, now at pre-application. View case study
The same directors lead every project
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Conversions in Sussex: your questions
Do you cover Peacehaven and Haywards Heath?
Yes, and the whole of East and West Sussex: Brighton and Hove's edges, Newhaven, Lewes, Burgess Hill, Crawley, Horsham, Worthing, Shoreham, Bognor Regis, Chichester, Eastbourne and Hastings.
Can a former pub become flats?
Yes, through a full planning application, as pubs are not in Class E. If the pub is an asset of community value, the community has a window to bid before any sale.
What will the build cost per m²?
At our 2026 rates the build is £880 to £1,755 per m² of floor, excluding VAT and fees, with the finish deciding where you land. The calculator gives a figure for your own building.
Do you manage building control and the fire strategy?
Yes. We prepare the fire strategy, sound insulation and the Building Regulations application and hand over the completion certificate with the keys.
Is my building inside the South Downs National Park?
Many villages and some town edges are. If it is, Class MA does not apply and the scheme needs a full planning application to the park authority. We check the boundary before anything else.
How long does prior approval take?
The council normally decides a Class MA application within 56 days. Once approved, the conversion must be finished within three years.
Can we add a storey on the roof?
Often, where the frame and foundations can carry it. A roof storey over flats created through Class MA needs full planning permission, so we usually apply for the whole scheme in one go.
Do you also fit out commercial space in Sussex?
Yes. Shops, offices and restaurants in Brighton and the towns: see builders in Brighton and Hove.
Before you buy or convert
The process: converting commercial property to residential in 9 steps. Budget: conversion costs explained. Flat sizes: space standards for flats.
What our clients say
See all reviews on Google-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Speed and proactivity, proven on our projects
We plan ahead: every change is priced and agreed in writing before the work is done.
-
3 weeks
to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.
-
8 weeks
to design and build the 2,500 m² Banbury warehouse, with the site kept running.
-
8 weeks
on site at Drake's flagship on Savile Row, with the shop open throughout.
Speak to us and you will see how we work.
We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.
A building to convert in Sussex?
Tell us the address, the size and how it is used now. A director comes back with the likely route and what happens next.



























