Pictured: offices our team designed and built inside a warehouse in Banbury, Oxfordshire
Warehouse Construction in Kent
New units, extensions, mezzanines and full refits for owners and occupiers, from Dartford to Ashford and across the South East.
Our track record
100% of projects delivered aheadof programme and on budget
Warehouses our team has delivered
- 2,500 m²Banbury warehouse, Oxfordshire: designed and refitted around live operations
- 8 weekson site at Banbury, with offices, welfare, racking and power upgraded
- 500 m²Drake's railway arch, Bethnal Green: converted in 8 weeks on site
- £10Mpublic, employers’ and professional liability cover
One contractor for the shell, the slab and the fit-out
Craftex builds, extends and fits out warehouses in Kent for logistics operators, manufacturers, e-commerce businesses and landlords. One team designs the building or the alteration, deals with planning and building control, prices it and builds it, so the slab, the frame, the power and the offices arrive in the right order.
We are a London design and build contractor and we work across the South East with our own trades; Kent is an hour from our office. A director surveys your site and stays responsible until the keys are handed over.
We are quick to start and quick on site. At Banbury in Oxfordshire our team designed and refitted a 2,500 m² warehouse in 8 weeks while it kept trading. Tell us your date and see for yourself how fast a programme comes back.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Warehouse work we carry out in Kent
Designed and built under one contract. Nationally: warehouse and logistics construction and warehouse fit-out and refurbishment.
New warehouses and units
Steel portal frames, cladding, slabs and yards for a new unit, from groundworks to handover.
Extensions and mezzanines
More floor space inside or beside the shed: extensions, mezzanine decks, stairs and barriers.
Offices and welfare
Offices, canteens, changing rooms and WCs built inside the unit to the standard visitors see.
Loading doors and yards
Sectional doors, dock levellers, yard surfacing and protection for the vehicles that use them.
Power, lighting and heat
Supply upgrades, high-bay LED lighting, heating and ventilation sized for the way you operate.
Refits of older sheds
Roofs, floors, insulation and services renewed so an older unit lets or works again.
Where we build in Kent: the M20, the M2 and the Thames
Kent’s warehouse market follows its roads. Dartford and Gravesend sit at the Dartford Crossing on the M25, minutes from London. The M20 corridor runs through Aylesford, Maidstone and Ashford towards the Channel Tunnel. The M2 serves Medway and Sittingbourne, and the A2 and Thames-side sites carry port traffic.
Each site brings its own questions: flood risk near the Thames and the Medway, ground conditions for the slab, the power available from the network and the hours a council allows for deliveries. We look at these first, because they decide the programme and the cost more than the frame does.
We take on projects from about £100,000 to £10M and above, from a single unit refit to a new building with its yard.
Planning, permitted development and Building Regulations
A new warehouse needs planning permission from the district council, such as Dartford, Maidstone, Swale, Tonbridge and Malling or Ashford, or from Medway Council. Smaller extensions to an existing warehouse can sometimes go ahead as permitted development under Part 7, Class H of the General Permitted Development Order: outside protected areas, an extension may add up to 50% of the original floor space or 1,000 m², whichever is less, with height limits near boundaries.
Every new building, extension and most alterations must also meet the Building Regulations, including fire safety and energy performance, with sign-off from the council’s building control or a registered building control approver. Mezzanines often trigger new escape routes and fire protection.
We confirm the planning route at the first visit, prepare the drawings and the building control application, and agree the fire strategy before any steel is ordered.
How it works
How a Kent warehouse project runs
01
Site visit
We walk the site or the unit with you, check the ground, the power and access, and agree the date you need it working.
02
Design and fixed figure
Layout, frame, services and fit-out drawn by our team and priced as one, with a programme.
03
Planning and building control
The planning route confirmed, drawings submitted and the fire strategy agreed early.
04
Build in sequence
Groundworks, frame, envelope and fit-out by our own trades, or phased around operations in an existing unit.
05
Handover
Every system tested, certificates and manuals handed over and the building ready to trade.
Sussex, Essex and Hertfordshire
Sussex. Units around Crawley and Gatwick, Burgess Hill and the coastal towns, where airport and distribution businesses need space close to the A23 and M23.
Essex. Thurrock and the Thames ports, Basildon and Harlow, with large sheds on the M25 and the A13. Hertfordshire. Units on the M1 and A1(M) corridors serving north London.
The same team, the same contract and the same programme discipline apply wherever the site is. In Surrey we also have a local page: warehouse refurbishment in Surrey.
The Craftex Guide to Warehouse Fit Out
Layout, budget, compliance and the checklist that keeps a warehouse project on time, from the first survey to the keys.
In every Kent warehouse contract
Six commitments in writing
Each one is a contract term.
-
A programme to your date
Set before you sign and built back from the day you need the unit.
Banbury: 2,500 m² refitted in 8 weeks.
-
A fixed figure
One price for the agreed scope; changes priced and approved first.
-
Operations protected
Phased zones and safe routes so goods keep moving in an existing unit.
-
Our own trades
Around 60% of the labour is ours, so the programme stays in our hands.
-
£10M cover
Public, employers’ and professional liability; ISO 9001, 14001 and 45001.
-
Certificates at handover
Electrical, fire and building control paperwork ready for your insurer.
Already have a quote? Send it to us. We'll beat it.
Holding a price for a new unit, an extension or a refit? Send it to us. We check it against the site and your date and reply with our figure for the same scope, plus a programme.
Compare your quotes
Where warehouse projects in Kent lose time, and how we prevent it
Six questions to put to any builder.
| Area | The usual risk | With Craftex |
|---|---|---|
| Planning route | Work starts on an extension that is not permitted development | Class H limits and planning checked at the first visit |
| Ground and slab | A slab poured without knowing the ground or the racking loads | Ground and load data before the slab is designed |
| Power | The network cannot supply the new load | Supply checked early and upgrades ordered with the programme |
| Fire and escape | A mezzanine that building control will not sign off | Fire strategy agreed before steel is ordered |
| Several firms | Frame, cladding and fit-out contractors blaming each other | One design and build contract for the whole building |
| Trading | Operations stopped for the works | Phasing around your shifts and deliveries |
Warehouse construction cost in Kent, 2026
Our 2026 rates, ex VAT and fees. The site, the ground and the specification set your figure.
| Item | What it covers | Rate |
|---|---|---|
| New shell for letting | Frame, cladding, roof, slab and basic services | £104/sq ft (£1,120/m²) |
| New unit, ready to occupy | Shell with lighting, power, welfare and offices | £117/sq ft (£1,260/m²) |
| Temperature-controlled or high-spec | Insulated envelope, refrigeration-ready services | £188/sq ft (£2,025/m²) |
| Refit of an existing unit | Power, heating, lighting, welfare and loading doors | £27–58.50/sq ft |
| Mezzanine floor | Structure and deck; stairs and fit-out on top extra | £72–180/m² of deck |
Groundworks on poor ground, drainage, yard surfacing, a new substation and racking are priced for each site.
Send us the site plan and your date; after a survey you receive a fixed figure and a programme.
Free cost calculator
What will your Kent warehouse cost to build?
Enter the floor area and choose a specification for a range at our 2026 rates.
Warehouses our team has delivered
-
Banbury, Oxfordshire Banbury warehouse: 2,500 m² designed and refitted in 8 weeks, never closed View case study
-
Hackney, London Hackney unit: phase one finished early, then the client came back for more View case study
-
Bethnal Green, London Drake's railway arch: 500 m² converted and moved into in 8 weeks View case study
The same directors lead every project
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Warehouse construction in Kent: your questions
Do you build new warehouses or only fit them out?
Both. Our team designs and builds new units and extensions, and fits out and refurbishes existing ones. On a new building we handle the frame, envelope, slab, yard and services as well as the offices inside.
Do I need planning permission to extend my warehouse?
Sometimes not. Permitted development (Class H) lets an existing warehouse grow by half its original size, capped at 1,000 m², outside protected areas and within height limits. A larger extension or a new building needs planning permission; we confirm the route first.
Can you work while our warehouse keeps trading?
Yes. At Banbury the 2,500 m² warehouse kept operating for the whole 8 weeks; we split the works into zones and kept walkways and fire exits open.
Do you work in Sussex, Essex and Hertfordshire too?
Yes, with the same team and the same contract: Crawley and Gatwick, Thurrock and Basildon, and the M1 and A1(M) corridors in Hertfordshire.
Do you have a Kent office?
No. We are based in London, about an hour from most Kent sites, and send our own trades to every South East job. A director visits before we price and stays with the job.
How much does it cost to build a warehouse in Kent?
Our 2026 rate for a new shell starts at £104 per sq ft, ex VAT; a unit ready to occupy with offices and welfare is around £117 per sq ft. The calculator gives a range; the site sets the fixed figure.
Do you install mezzanine floors?
Yes, designed to your loads with stairs, barriers, fire protection and building control sign-off, priced from £72 per m² of deck.
How quickly can you start?
We reply within one hour, Monday to Saturday, 8am to 6pm, and can usually survey within days. For a refit, work can start within weeks; a new building starts once planning and building control allow.
Read before you start
Planning the budget: cost to build a warehouse in the UK, what a warehouse fit-out includes and mezzanine floor regulations. Nearby: property developers in Kent.
What our clients say
See all reviews on Google-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Speed and proactivity, proven on our projects
We plan ahead: every change is priced and agreed in writing before the work is done.
-
3 weeks
to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.
-
8 weeks
to design and build the 2,500 m² Banbury warehouse, with the site kept running.
-
8 weeks
on site at Drake's flagship on Savile Row, with the shop open throughout.
Speak to us and you will see how we work.
Urgent? Message us on WhatsApp: we reply straight away, any day.
Planning a warehouse in Kent or the South East?
Send us the site, the size and the date you need it working. A director replies with the next step and a programme.



























