Structural Survey Cost and What You Get
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
A structural survey cost depends on the question: one crack, or the whole building. HomeOwners Alliance's 2026 guide gives £175 to £300 for an engineer's inspection and £500 to £2,000 for a written report, as market figures, not our prices.
- An engineer's survey answers one structural problem, such as a crack, a bulge or a wall you want to remove.
- A RICS Home survey level three reports on the condition of the whole home.
- The fee grows with the size of the building, the access and the work to open things up.
- Our structural engineers give you a fixed fee after the first call.
A structural survey cost depends on one thing first: what the engineer has to answer. A single crack over a window takes less time than a full report on an old house. Below are 2026 market ranges, what you get for the fee and how the survey leads to a repair.
Our structural engineering services cover the inspection, the report and the repair design. Our builders can then do the work. See how our structural survey works. Worried about a crack or a wall? Book a structural survey and tell us what you see.
How much a structural survey costs in 2026
There is no national price list for a structural survey. The ranges below come from HomeOwners Alliance, a UK consumer advice website, in its 2026 guide to structural engineer costs. We read it on 21 November 2026.
They are market figures, not our prices. Each engineer sets their own fee.
| Service | Market range |
|---|---|
| Structural engineer inspection | £175 to £300 |
| Structural engineer report | £500 to £2,000 |
| Consultation for a loft conversion or extension | £750 to £2,200 |
| Average hourly rate | £90 to £200 |
The same guide says to expect around £100 an hour for a structural engineer in 2026. An inspection is a visit and a short answer. A report is a written document with the cause and the next steps.
Our structural engineers give you a fixed fee after the first call. By then we know the building, the problem and what you need the report for.
Structural survey vs building survey
The two are easy to mix up. An engineer's structural survey answers one question about the structure. A building survey by a surveyor reports on the whole home.
The RICS names three levels of home survey: RICS Home survey level one, level two and level three. Level three is its most detailed. RICS says it suits a large, older or run-down property, a building that is unusual or altered, or a home where you plan major works.
| Question | Our structural engineer's survey | RICS Home survey level three |
|---|---|---|
| Who carries it out | A structural engineer | A surveyor licensed to do RICS Home surveys |
| What it looks at | One structural problem: a crack, a bulge, a sagging floor, a wall to remove | The condition of the whole home, its structure and fabric |
| When to choose it | You see movement, or you plan to change the structure | You are buying, selling or living in an older or altered home |
| What you receive | The likely cause, what to do next and, if needed, a repair design | Visible defects, repair options and the likely result of doing nothing |
Survey prices for the RICS levels are set by each surveyor too. HomeOwners Alliance's survey cost guide, updated on 18 November 2026, gives these market ranges.
| RICS survey | Market range |
|---|---|
| Home survey level one | £300 to £900 |
| Home survey level two | £400 to £1,000 |
| Home survey level three | £630 to £1,500 |
Which? gave a similar picture on 26 March 2026. It said to expect from a few hundred pounds for a level one report to over £1,000 for more bespoke services.
What drives the cost of a structural survey
Two surveys on the same street can cost very different amounts. These six things move the fee.
- The question. One crack is quicker to judge than a whole house that has moved.
- Size and age. RICS points larger, older and altered buildings to its most detailed survey.
- Access. Lofts, cellars, high walls and locked rooms take longer to reach.
- Opening up. Lifting floorboards or digging a small hole by a wall takes time and needs your consent.
- Monitoring. Some cracks need readings over several weeks before anyone can judge them.
- Design work. Calculating and drawing a repair is a separate job from the visit.
A survey for a buyer before exchange is also different from a survey for a repair. Tell us why you need it, so the report answers the right question.
What the engineer checks on a structural survey
A structural survey follows the load from the roof down to the ground. The engineer looks for where that path has been broken, changed or overloaded.
These are the things our engineers look at on a visit.
- Cracks: their width, their direction and whether they are old or still moving
- Walls that lean, bulge or have lost their ties
- Floors and roofs that sag or bounce
- Beams and lintels over openings, and what they rest on
- Chimney breasts removed below a stack that is still there
- Trees, drains and clay ground close to the walls
- Past changes made without approval
Trees matter on clay. The government's own notes on Approved Document A say poplars have a high water demand and can cause serious problems to foundations in shrinkable clays.
Past changes matter too. The same notes cover work done without approval. Covered work may then need to be exposed to check, for example, the size of a steel beam.
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations. The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner. I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.
When you need a structural survey
Here are five reasons to book a structural survey. Each one has a different question behind it.
- Before you buy. The home shows cracks, a lean or old alterations, and you want to know what they mean before you sign.
- Before you change the structure. You want to remove a wall, convert a loft, add a floor or extend.
- When cracks appear or grow. A new crack, or one that keeps opening, needs a cause found first.
- Before you dig. A basement or deep foundations near a neighbour's wall can bring in the Party Wall etc. Act 1996.
- After damage. A leak, a fire or a vehicle strike has hit part of the structure.
If digging is part of the plan, read our guide to the Party Wall Act for developers. If the ground has moved, our guide to underpinning explains when deeper foundations are needed. Looking at cracks right now? Our guide to subsidence cracks explains which ones to worry about.
What you receive and what happens next
After the visit you get a written answer: what we found, the likely cause and what to do next. If the next step is work, our engineers write the structural calculations and drawings for building control.
When the report and the repair come from different firms, the builder may read the report differently. With us the people who wrote the report work in the same team as the people who build the repair.
Craftex is a team of architects with 50 years of experience, interior designers, engineers and builders.
Our team delivered the structural works at Slingsby Place in Covent Garden. The street walls stayed standing on temporary works while the building behind them was taken out and a new base was formed. Read the Slingsby Place case study.
Small jobs are welcome: one crack, one wall, one beam. Larger schemes get the same team. Book a structural survey and send us photos of what worries you.