Skip to content
Request a callbackCallback
Converted red-brick maltings building beside a river in an English market town

Commercial Conversions in Chelmsford and Essex

Offices, shops and former banks turned into flats across Essex, from the first feasibility check to the completion certificate.

Our track record

100% of projects delivered ahead
of programme and on budget

What our team has delivered

  • 8apartments from a 600 m² office, sold 2 months sooner than competing schemes (client review)
  • 11,127homes our team has taken through planning
  • 3,985homes our team has delivered
  • 4 weeksto cost four options for Allitsen Road, a derelict club to flats

Essex offices that no longer let, turned into homes that sell

Craftex carries out commercial conversions in Chelmsford, Colchester, Southend-on-Sea, Brentwood, Basildon and the rest of Essex, turning offices, shops and former banks into flats. One team checks the planning route, draws the flats, prices them and builds them, so the owner deals with one firm and one programme.

A typical Essex brief is one of three buildings: a 1970s or 1980s office block near the station that has lost its tenants, a high-street shop with empty floors above it, or an office where the owner also wants extra floors built above it. At the first visit we tell you which of these you have and how many flats it can hold.

We run Essex jobs from our central London base, roughly an hour's drive from Chelmsford and Brentwood. Our own employed trades carry out most of the build, and the director who first walks the building with you remains in charge until handover.

Open-plan living room and kitchen in a finished apartment with timber floors and grey sofas

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Buildings we convert to flats in Essex

Planning, design and the build under one contract. Our national service: commercial to residential conversion. Splitting a house instead? See house to flats conversion.

Office building with long bands of glazing next to a period stone block

Offices into flats

Station-side office blocks re-planned as one and two-bedroom flats, with the cores and windows tested before any layout is fixed.

Stone-fronted shops and houses along an English market-town street

Shops with empty floors above

Upper floors over a high-street shop given their own front door, stair and services while the shop keeps trading below.

Ornate Victorian stone commercial building with tall arched windows

Former banks and period buildings

Victorian banks, halls and chambers where the facade is kept and everything behind it is rebuilt as homes.

Brick building with a planted roof terrace and a clock turret against a blue sky

New storeys on the roof

One or two floors of flats added above the existing building, where the frame can carry them and the consent allows it.

Converted brick works building with a tall chimney behind a garden fence

Works buildings and warehouses

Brick industrial buildings opened up into homes with high ceilings, big windows and the original walls on show.

Living room with a green sofa and an exposed brick wall in a converted flat

Flats finished for sale or rent

Kitchens, bathrooms, floors and joinery chosen to match the price your agent expects for each flat.

Long red-brick terrace of former works buildings along a quiet English street

Chelmsford, Colchester, Southend and the commuter towns

Essex conversion stock follows the railway into London. Chelmsford, a city since 2012, has office buildings a short walk from a station with direct trains to Liverpool Street, and Brentwood and Shenfield sit on the Elizabeth line. Flats there sell to people who commute, which is why owners of half-let offices near the station ask whether the building would be worth more as homes.

Colchester and Southend-on-Sea, both made cities in 2022, have town-centre shops and offices with empty upper floors. In Basildon, Harlow and the other post-war new towns the stock is 1960s and 1970s office blocks with deep floors, where daylight decides how many flats fit and has to be checked before anyone buys.

Typical jobs range from two or three flats over a high-street shop to a complete office block, with construction budgets from roughly £100,000 to well over £10M.

Section drawing of a flats option drawn by our team for Allitsen Road, St John's Wood
Drawn by our team for Allitsen Road, St John's Wood, London

Class MA, prior approval and when full planning is needed

Most Essex office and shop conversions qualify for Class MA: the permitted development right that turns a Class E building into flats through prior approval rather than a full planning application. The Class E use must have run for at least two continuous years before you apply, and since 5 March 2024 neither a size cap nor a vacancy period applies.

The council's review is then limited to a fixed list: transport, contamination, flooding, noise from neighbouring businesses, natural light in every habitable room, the loss of a ground-floor use in a conservation area and fire safety in taller buildings. Every flat also has to meet the nationally described space standard. Listed buildings are outside the route, as is anything in an area of outstanding natural beauty such as Dedham Vale on the Suffolk border.

Flood risk carries more weight here than in most counties. Parts of Southend, Canvey Island, Maldon and the estuary towns lie in flood zones, so the application must show how the flats stay safe. Changes to the outside of the building need planning permission of their own, and where the council has removed the right with an Article 4 direction the whole scheme goes in as a full planning application.

Stripped room inside the former club at Allitsen Road before its conversion was designed
Pictured: Allitsen Road, St John's Wood, London, a former club our team appraised for flats

Converting the floors and adding storeys on top

Some owners want both: flats in the existing floors and one or two new storeys on the roof. The two follow different rules. Class AA allows up to two extra storeys of flats on a detached office or shop building of at least three storeys built between 1 July 1948 and 5 March 2018, but not where the homes below exist only because of Class MA.

So a conversion with new floors usually goes to the council as one full planning application. Before the scheme is costed our engineers check that the frame and foundations can carry the extra weight, and whether a lift and a second escape route are needed for the taller building.

Roof storeys on their own are covered by our airspace and upward extension service.

How it works

How an Essex conversion runs

01

Building check

We visit, measure and tell you how many flats the floors can hold and which planning route fits.

02

Layouts and appraisal

Flat plans drawn to the space standard and priced, ready to test against local sale values.

03

Prior approval or planning

We prepare and submit the application and answer the council until it is decided.

04

Technical design and fixed price

Fire strategy, sound insulation, drainage and services drawn, then one agreed price for the build.

05

Build and completion

Our crews on site, building control signed off, certificates and manuals handed over with the keys.

What lenders, buyers and HMRC will ask for

A development lender sends a monitoring surveyor to check the budget, the programme and the contractor before each drawdown. We give them a fixed price, a programme with dates and monthly progress in the form they expect.

Buyers' mortgage lenders usually want a new-home warranty on converted flats, so when your scheme has one we build to the warranty inspector's checks from the first week. Turning a commercial building into homes normally takes the reduced VAT rate of 5% on the building work; our article on VAT on commercial to residential conversions explains the conditions.

Cover of the free Craftex Guide to Office to Residential Conversion

Free guide: converting an office into flats

Planning routes, space standards, fire safety for flats and a checklist to work through before you buy a building or instruct anyone. Written by the team that appraises and builds conversions, in plain English.

In every Essex conversion contract

What we sign up to

Six terms we put in writing before work starts.

  1. A verdict before design fees

    We tell you whether the building works as flats before you pay for drawings.

    Allitsen Road: four options costed in four weeks

  2. One price that holds

    The agreed sum is what you pay; any change is priced in writing and approved by you first.

    Chelsea shop-to-flat client: no hidden extras

  3. Your sales date in the programme

    We overlap design, ordering and site work so the flats are finished in time for your sales launch.

    Client review: 600 m² office to 8 apartments, 2 months faster

  4. Our own people on site

    About six in ten workers on our sites are Craftex employees.

  5. Insured to £10M

    Public, employers' and professional liability, £10M each.

  6. Every certificate at handover

    Building control completion, electrical and fire alarm certificates and a manual for each flat.

Example conversion quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Holding another builder's price for your Essex conversion? Send it with the drawings. We check what it includes and leaves out, then return our own fixed figure for the same scope, with a programme.

Compare your quotes

Where Essex conversions overrun, and how we prevent it

Put these six questions to any contractor you are pricing.

AreaThe usual riskWith Craftex
Planning routeChosen after the building is boughtSettled before you commit, in writing
Daylight and flat sizesFound to fail at prior approvalEvery room and flat checked against the rules first
Structure for new storeysAssumed, then redesigned on siteFrame and foundations surveyed before pricing
Fire and sound between flatsLeft to a subcontractor to solveAgreed with building control before work starts
Services for each flatMeters and risers squeezed in lateA riser and meter plan for the whole building
Handover paperworkCertificates chased for monthsHanded over with the keys for lender and buyers

Commercial conversion cost in Essex, 2026

Our 2026 build rates, before VAT and fees, on gross internal floor area.

Finish levelUsually chosen forPer m²A 600 m² building
EssentialFlats to rent£880–1,035£528,000–621,000
StandardFlats for sale in the commuter towns£1,150–1,350£689,000–810,000
PremiumLarger flats and period buildings£1,490–1,755£895,000–1,053,000
New storey on the roofExtra floors of flats£1,440–2,025Per m² of new floor

Land, finance, sales and legal costs are on top. Allow a contingency of 5–10% for what the strip-out reveals. Cost detail: how much a conversion costs.

A detailed cost plan starts at £750 + VAT and is credited when you build with us.

Free cost calculator

What will your Essex conversion cost?

Put in the gross floor area and a finish level to see a first cost range at our 2026 build rates.

Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, before VAT and fees, for the build only. Roof storeys, lifts and facade work are priced after a survey.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Commercial conversions in Essex: your questions

Where in Essex do you take on conversions?

Anywhere in the county: Chelmsford, Colchester, Southend-on-Sea, Brentwood, Basildon, Harlow, Braintree, Billericay, Epping, Maldon and the surrounding villages, all about an hour from our London office.

How long does the council take to decide?

For a Class MA prior approval the council normally has 56 days to decide, and the flats must then be completed within three years of the approval date. A full planning application usually takes longer.

What does a conversion cost per square metre?

Our 2026 build rates for a conversion are £880 to £1,755 per m² of floor before VAT and fees; where you sit in that range depends on the finish. The calculator on this page works it out for your own floor area.

Will the flats need a second staircase?

Only in taller buildings. Most Essex conversions are low-rise, where one protected stair with the right fire doors and alarms is enough. Above 18 metres the rules change, and we design for them from the start.

Can my Chelmsford office become flats without full planning permission?

In many cases, yes. If the building has been in Class E use for at least two years without a break and is not listed, a prior approval application is normally enough. We tell you which route applies at the first visit.

Can you add floors on top as part of the conversion?

Yes, where the structure can take them. If the flats below come through Class MA, the new floors need full planning permission, so we usually submit one application covering both.

Do you work for developers and investors as well as owners?

Yes: owners converting their own building, developers buying to convert, and investors who want a verdict on a building before they bid at auction.

Would you buy the building or partner with us instead?

Where the numbers suit, our development team can buy it or work with you as a partner. See property developers in Essex.

Read before you convert

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.

Converting a building in Essex?

Send the address and how it is used today. A director replies with the planning route and the next step.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us