Restaurant, Pub and Bar Fit-Out in Edinburgh
Dining rooms, bars and pubs in listed Old Town and New Town buildings, designed, approved and built by one team.
Our track record
100% of projects delivered aheadof programme and on budget
Sloane Place, Chelsea: our team
- 27 roomsboutique hotel in Chelsea, bar and dining room included
- 28 weekson site, while the members’ club next door kept its doors open
- £1.29Mvalue of the Sloane Place remodel our team delivered
- £10Minsurance for each of public, employers’ and professional liability
Hospitality space in a city of listed buildings
We design and build restaurants, bars and pubs in Edinburgh for independent operators, hotel owners and groups opening a new site. One team plans the room and the kitchen, prepares the planning, building warrant and listed building drawings, and carries out the fit-out.
Craftex is a London firm and we take on projects anywhere in the UK; there is no Edinburgh branch. Before any figure is given, a director comes to see the building. Most of the labour on site is our own, and a single contract covers design, approvals and construction.
Openings run to a date, and we move fast to meet it. The people who designed and built the cocktail bar and dining room of Sloane Place, a 27-bedroom Chelsea hotel finished in 28 weeks while the club beside it stayed open, are the people who would run your job. Get in touch and judge our response time yourself.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Six kinds of Edinburgh venue we fit out
Planned, approved and built by one firm. Nationally: hospitality and restaurant fit-outs, and our bar and pub design and build service.
Restaurants and dining rooms
Seating plans, banquettes, lighting and acoustics for a room that works at 30 covers or 130.
Cocktail and hotel bars
Counters, back bars, glass washers and cellar lines built for fast service.
Traditional pubs
Bar fittings, tiles and panelling repaired or reinstated, with new cellars and toilets behind.
Cafés and all-day spaces
Counters, coffee stations and seating that work from breakfast to late evening.
Private dining and function rooms
Separate rooms with their own lighting, sound and service routes for groups and events.
Period frontages
Fascias, lanterns, etched glass and lettering restored, with consent, while the room behind is modernised.
Old Town vaults, New Town basements and the Shore at Leith
Edinburgh’s hospitality buildings are rarely simple boxes. In the Old Town, around the Royal Mile, the Grassmarket and the Cowgate, venues sit in tenement ground floors and stone vaults with thick walls, low ceilings and little room for ducts. In the New Town, Rose Street, Thistle Street and George Street have bars and restaurants in Georgian basements and former banks, many of them listed.
Leith Shore and Stockbridge have their own character: converted warehouses and shopfronts on the water at the Shore, smaller neighbourhood places in Stockbridge. Each needs a different answer for the kitchen extract, the toilets and the route for deliveries and bins.
Much of the centre is inside the Old and New Towns of Edinburgh World Heritage Site, inscribed by UNESCO in 1995. That raises the bar for anything visible from the street: flues, signs, plant and shopfronts. We survey the building and the street before we draw, so the design is one the council can approve.
Planning, building warrant, listed building consent and the licence
Four approvals shape an Edinburgh venue. Planning comes first: Scottish law puts restaurants in Class 3 of the 1997 Use Classes Order and leaves pubs outside any class, so a pub, shop or office becoming a restaurant needs consent from the City of Edinburgh Council, as do most flues and lit signs. Building standards come next: works to kitchens, ventilation, WCs or fire detection generally require a warrant under the Building (Scotland) Act 2003 and end with a completion certificate.
Listed buildings: a listing in Scotland covers the inside as well as the outside, so bar fittings, ceilings and panelling may need listed building consent; Historic Environment Scotland is consulted on some cases. Licensing: the City of Edinburgh Licensing Board grants premises licences under the 2005 Licensing Act for Scotland, and the board expects certificates for planning and building standards, plus food hygiene if you serve food, before it issues a new one.
Our team draws all four sets and orders them so that nothing is still pending when the bar is finished.
How it works
From first visit to opening night
01
Brief on site
Covers, concept, menu and the opening date first; then gas, power, drainage and the extract route are checked.
02
Room and kitchen designed
The dining room, bar and kitchen are drawn together and costed as they develop.
03
Approvals prepared
Planning, warrant, listed building consent and the licence layout plan, drawn by our team.
04
Shell and workshop at once
While the room is stripped and serviced, bars and banquettes are being made in the workshop.
05
Handover and first service
Kitchen ventilation, gas safety and fire detection signed off, and the completion certificate with the council before guests arrive.
Timing a refit around the Edinburgh year
Many Edinburgh operators earn a large share of their year in August, when the Festival and the Fringe fill the city. A refit is best planned to finish before the summer peak, or to run in the quieter months after it.
We fix the opening date with you on day one, begin the warrant and consent packages immediately and have bars, banquettes and panelling built in the workshop during the strip-out. If you keep trading during the work, it is phased around lunch and dinner.
The Craftex Guide to Hospitality Design
How a hospitality fit-out is planned, what drives the budget and the checklist that protects an opening date.
In every Edinburgh hospitality contract
Six promises in writing
Each one is a term of the contract.
-
Your opening night
Set with you at the start and fixed in the programme.
Sloane Place: hotel, bar and dining room in 28 weeks.
-
A figure that holds
Priced on the approved design; extras only after your written approval.
-
Kitchen and room together
The pass, the bar and the dining room are planned by the same designers.
-
Our own workforce
Most trades on site are employed by Craftex, so the timetable is ours to keep.
-
Insured to £10M
Each of public, employers’ and professional liability; ISO 9001, 14001, 45001.
-
Ready for the board
The certificates your licence depends on, handed over before trading starts.
Already have a quote? Send it to us. We'll beat it.
Already have a price from a shopfitter or builder? Send it over. We read it against your plan and opening date and return our own figure for the same work, with a programme.
Compare your quotes
Why Edinburgh openings slip, and what we do about it
Six risks to raise with any contractor.
| Area | The usual risk | With Craftex |
|---|---|---|
| Listed fabric | A bar back or ceiling removed before consent | Listing checked first; consent drawings prepared before strip-out |
| Flues and plant | An extract route the council will not allow on a listed street | Route surveyed and agreed in principle before the kitchen is ordered |
| Change of use | A pub or shop converted without asking | Planning position confirmed at the first visit |
| Licence | Certificates missing when the board meets | Planning, warrant and completion sequenced for the licence |
| Programme | Joinery late, trades waiting for each other | Joinery off site, our own trades in parallel |
| One point of contact | Designer and builder blaming each other | One team, one contract, one director |
Restaurant and bar fit-out cost in Edinburgh, 2026
What we charge in 2026 per square metre, before VAT and fees. Edinburgh jobs use our national figures without a London loading.
| Scope | Indication |
|---|---|
| Refit of a restaurant, bar or pub | £1,225–1,710/m² (£114–159/sq ft) |
| Kitchen, equipment included | £2,430–2,880/m² of kitchen |
| Venue built from new | £2,295–2,700/m² (£213–251/sq ft) |
| Size of project | £100,000 to £10M+ |
Stone vaults, listed rooms, long flue runs and conditions set by the licensing board are costed per building once surveyed.
Share the layout and the date you want to open, and you will receive a costed plan with a timetable.
Free cost calculator
Estimate your Edinburgh venue
Type the size of the room and choose a level of finish; a range at this year’s rates appears immediately.
Hospitality and pub work by our team
-
Design visual: Chelsea, London Sloane Place: 27 bedrooms, a cocktail bar and a dining room, finished in 28 weeks View case study
-
Marylebone, London Gloucester Arms: an old corner pub kept on the street, new inside View case study
-
Knightsbridge, London Medusa: four floors on Beauchamp Place finished in 17 weeks View case study
The same directors lead every project
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Restaurant and bar fit-out in Edinburgh: your questions
Are you based in Edinburgh?
No; Craftex is based in London and builds throughout the UK. A director inspects your premises before quoting and remains your contact through to the first service.
Which planning rules apply in Edinburgh?
Applications are judged against the City of Edinburgh local development plan and National Planning Framework 4, the national policy adopted in February 2023, with extra care for listed buildings and the World Heritage Site.
Our building is listed. What can we change?
More than people expect, with listed building consent: the listing covers the interior, so we record the fabric first and design around ceilings, panelling and bar fittings worth keeping.
How much does a bar fit-out in Edinburgh cost?
For a refit of a restaurant, bar or pub our 2026 price begins at £1,225 per m² before VAT; the kitchen is costed separately. Try the calculator, then let us survey for a firm figure.
Do you also fit out hotels?
Yes, from lobby and bar to bedrooms. Sloane Place in Chelsea, delivered by our team, combined 27 rooms with a cocktail bar and restaurant over 28 weeks.
Do I need planning permission for a restaurant in Edinburgh?
If the unit is already a restaurant (Class 3), a refit inside usually does not. Turning a pub, shop or office into a restaurant needs planning permission, and so do most new external flues and illuminated signs, especially in conservation areas.
Is a building warrant needed for a bar or restaurant fit-out?
In most cases. The council has to approve kitchens, extraction, WCs and fire or escape changes before they are built, and accept the completion certificate afterwards. Our team draws and submits both.
How does the licence fit in?
Premises licences in the city come from the City of Edinburgh Licensing Board. For a fresh licence it wants planning and building standards certificates, plus food hygiene where food is served; an altered layout normally means applying for a variation. Your licence plan is taken from our working drawings.
Can we open before the Festival?
If the approvals allow, yes. Tell us the date first; we start the drawings and order long-lead items at once and plan the works backwards from August.
Read before you start
In the west of Scotland: Glasgow restaurants, pubs and bars. Offices in the capital: Edinburgh office fit-out. Background reading: how a hospitality fit-out works. The city overview: Edinburgh.
What our clients say
See all reviews on Google-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Speed and proactivity, proven on our projects
We plan ahead: every change is priced and agreed in writing before the work is done.
-
3 weeks
to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.
-
8 weeks
to design and build the 2,500 m² Banbury warehouse, with the site kept running.
-
8 weeks
on site at Drake's flagship on Savile Row, with the shop open throughout.
Speak to us and you will see how we work.
We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.
Planning a venue in Edinburgh?
Tell us where it is, how big it is and when you want to open. A director answers with a first programme and what happens next.