Skip to content
Request a callbackCallback
The Mathematical Bridge over the River Cam beside Queens' College, Cambridge

Office Fit Out in Cambridge

Offices, research space and workshops for Cambridge companies, designed, consented and built by one team on a fixed price.

Our track record

100% of projects delivered ahead
of programme and on budget

Delivered by our team

  • 4 weeksfor phase one of an engineering and research centre in Hackney, about a week early
  • 6 mceilings in that unit, with workstation extraction taken 12 m above the roof
  • 1,550 m²of offices at Portsoken House, Aldgate, completed with the building in use
  • 1 weekearly on an office re-planned to fit more people (client review)

Workspace for Cambridge teams that grow fast

Craftex is an office fit out company working in Cambridge for technology, life-science and professional firms. We plan the space, deal with the landlord and building control, set one price and build it, from a single suite near the station to a whole building on a science park.

Cambridge companies often need more than desks: a workshop with three-phase power, a wet room with an emergency shower, a quiet lab bench beside the engineers. Our team has built that kind of space before, including an engineering and research centre in Hackney with fume extraction, pumped waste and high-voltage supply.

We are based in London, about an hour from Cambridge by train from King's Cross or Liverpool Street. A director surveys every project and stays responsible to handover; most of the work is carried out by our own tradespeople.

Sinks, benches and an emergency safety shower in the research unit our team fitted out in Hackney
Pictured: the research unit our team fitted out for Fuse Energy in Hackney, London

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What we fit out for Cambridge companies

One contract from the first layout to the certificates. Related services: laboratory fit-out, office space planning and Cat A fit-out for landlords.

Rows of white desks in the open-plan office at Beaumont House, Kensington
Pictured: Beaumont House, Kensington, London

Open-plan offices

Desks, quiet rooms and collaboration space laid out for a headcount that may double within a year.

Sink and eyewash station installed by our team in the Hackney research unit
Pictured: our Hackney research unit, London

Wet labs and research rooms

Sinks, safety showers, eyewash stations and the drainage and ventilation behind them.

Power drops and wall heaters in the workshop our team fitted out in Hackney
Pictured: our Hackney research unit, London

Workshops and test areas

Power drops, heating and high-bay lighting for engineering and prototyping space.

Fitted meeting room at Portsoken House, Aldgate
Pictured: Portsoken House, Aldgate, London

Meeting rooms

Sound-rated rooms with screens for the calls that run between Cambridge, London and the rest of the world.

Office kitchen with pendant lights at Beaumont House, Kensington
Pictured: Beaumont House, Kensington, London

Kitchens and breakout

A proper place to eat and talk, which matters when the team works long hours on site.

High-bay lights and cable tray installed by our team in Hackney
Pictured: our Hackney research unit, London

Electrical and mechanical services

New supplies, distribution boards, cooling and extraction designed and installed by us, then tested.

Street in the centre of Cambridge with stone college buildings and a red bus

CB1, the science parks and the historic centre

Cambridge office space falls into three kinds. Around the station, the CB1 quarter has modern floors that are let in shell or Cat A condition and need a tenant's fit-out. On the edges of the city, the Cambridge Science Park, St John's Innovation Park, Cambridge Business Park and the Biomedical Campus offer buildings where offices sit next to labs and workshops.

In the centre, many offices are in listed or college-owned buildings inside the conservation area, with small floors, old services and strict rules on what can be fixed to the fabric. There, listed building consent and the landlord's conditions shape the design as much as the brief does.

Our Cambridge work reaches the surrounding villages and on to Ely, Huntingdon, St Neots and Royston, on projects worth about £100,000 to more than £10M.

Copper pipework to a lab sink installed by our team in Hackney
Pictured: our Hackney research unit, London

Fitting out research and engineering space

A research fit-out lives or dies on the services. Drainage for sinks and safety showers, extraction that clears the roof by the right height, enough power for test rigs and a fire strategy that allows for what is stored on site all need to be designed before the walls go up.

That was the work at Fuse Energy's engineering and research centre in Hackney: our team redesigned the electrical layout, heating and lighting from scratch, connected the unit to the high-voltage supply, and installed sinks, an emergency shower, pumped waste and workstation extraction. The client returned for a second phase. More on laboratory fit-out.

How it works

Your Cambridge fit-out, start to finish

01

Brief

A call about the team, the work it does and the date; then a director surveys the building and its services.

02

Plan and price

A layout and a fixed sum delivered together, so the decision is made once.

03

Approvals

Landlord's licence, building control and any listed building consent prepared by our team.

04

Construction

Trades on site together, working to a programme set by your move-in or lab start date.

05

Commissioning

Services tested and certified, the space cleaned and the manuals handed to your facilities lead.

Cover of the free Craftex Guide to Office Fit-Out

Free guide: getting an office fit-out right

What to agree before signing the lease, the budget lines people overlook, which approvals apply and how to hold the moving date. In plain English, from the team that carries out the work.

Every Cambridge contract

Six promises in writing

What you can hold us to, from the survey to the handover.

  1. Programme from your date

    The schedule is built back from the day your team or your lab needs to start.

    Hackney research unit: phase one a week early

  2. No unpriced changes

    Extra work is costed in writing and only goes ahead once you approve it.

  3. Design and construction together

    Layout, services design, consents and build from one firm.

  4. Our own people

    Most of the tradespeople on our sites are Craftex employees.

  5. £10M cover

    Insurance of £10M for each of public liability, employers' liability and professional indemnity.

  6. Signed-off services

    Electrical, fire alarm and building control certificates at handover.

Example quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Comparing fit out companies in Cambridge? Send us the quote you hold and the plan. We check the scope and the services allowances, then come back with our own fixed price and programme for the same job.

Compare your quotes

Where Cambridge fit-outs overrun, and how we stop it

Six things to check in every tender before you choose.

AreaThe usual riskWith Craftex
Services capacityPower or drainage found short mid-jobSupplies and drainage surveyed before the price
Lab and workshop needsLeft to a late variationDesigned into the first layout
Listed or college buildingsConsent or landlord approval stalls the startApplied for alongside the design
GrowthSpace full within a yearLayout planned for the next headcount
TradesOne after anotherSide by side under one site manager
HandoverMissing certificatesTested, certified and documented

Cambridge office fit-out cost, 2026

Our 2026 rates for office fit-out works, before VAT and fees. Labs and workshops are priced from the survey, because services drive the cost.

SpecificationWorks per m²Works per sq ftFurniture and AV, per sq ft
Essential£678£63£22.50
Standard£872£81£40.50
Premium£1,165£108£67.50

Shell floors, listed buildings and out-of-hours work add cost. A breakdown: office refurbishment cost.

A detailed cost plan starts at £750 + VAT and is credited when you build with us.

Free cost calculator

Estimate a Cambridge office budget

Enter the floor area or the size of the team and pick a specification.

I know my
Add
Your estimateEnter your spaceex VAT and fees Ask for a fixed price

A guide only, before VAT and fees, for office space. Lab and workshop services are priced after a survey.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Cambridge office fit-out: your questions

Do you work on the Cambridge Science Park and the other parks?

Yes, and on St John's Innovation Park, Cambridge Business Park, the Biomedical Campus and in the CB1 offices by the station.

Are you one of the fit out companies that also designs?

Yes. Our team plans the space and designs the services, then builds it under the same contract.

How quickly can you start?

A reply comes within one hour, Monday to Saturday, 8am to 6pm. A survey is usually possible within days, and for a tight date we can be on site around two weeks after your first call.

Do you carry out commercial building works too?

Yes: refurbishments, extensions and new commercial buildings. See construction in Cambridge.

Can you fit out labs as well as offices?

Yes: wet benches, sinks, safety showers, extraction, drainage and power, designed with the office layout so the services fit.

Can you work in a listed building in the city centre?

Yes. Where listed building consent is needed we prepare it, and we pick fixings, partitions and cable routes that leave historic fabric untouched.

How much does an office fit-out cost in Cambridge?

Office fit-out works on our 2026 rates come to £63 to £108 per sq ft before VAT, plus furniture and AV. Lab services are priced once we have surveyed.

Do you work outside the city?

Yes, across Cambridgeshire, including Ely, Huntingdon and St Neots, and over the border into Hertfordshire and Suffolk.

Read before you start

What our clients say

See all reviews on Google
  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

Urgent? Message us on WhatsApp: we reply straight away, any day.

Fitting out an office or lab in Cambridge?

Give us the address, the area and your target date. A director replies with the next step and a first programme.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us