Skip to content
Request a callbackCallback
A quiet central London street of red-brick mansion blocks and period houses with iron railings

Office Refurbishment and Fit Out in Marylebone

Offices and consulting suites refurbished around your lease and your team, by one London team.

Our track record

100% of projects delivered ahead
of programme and on budget

Office work by our team

  • 750 m²the largest single office floor our team has turned around against a lease deadline
  • 2 weeksfrom that client's first call to our people working on the floor
  • 7 monthsfor two occupied office floors at Portsoken House in Aldgate
  • £10Mpublic liability, employers' liability and professional indemnity cover

Office refurbishment in Marylebone's buildings

We refurbish and fit out offices and professional suites in Marylebone, from Baker Street and Portman Square to Harley Street. Our team refurbished a 750 m² office in three weeks so more than 150 staff could move before their lease ended.

Marylebone offices come in three kinds. Georgian terraces where each floor is a few rooms and the stair is the only way up; red-brick mansion blocks and converted houses let as suites; and larger modern floors along Baker Street and Marylebone Road. Each needs a different plan for layout, services and access.

Tell us your date and headcount on the first call. Reach out and see for yourself how quickly we respond.

The galleried interior of Daunt Books on Marylebone High Street, with a skylight and timber balconies

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What we do in Marylebone offices

One team draws, prices and builds it. Medical and consulting suites follow clinic standards: see clinic fit-out and refurbishment.

Open office floor between columns at Beaumont House after our refurbishment

Floors re-planned for more desks

We draw the layout around how your people work, so the same floor seats more of them. The full service: office fit-out in London.

Two people working at desks beside a large sash window in a dark-walled office

Suites in Georgian houses

Small rooms on several floors turned into offices that work together, without harming plaster, joinery or stairs.

Treatment room after our fit-out at Medusa, Knightsbridge

Consulting and treatment rooms

Rooms with wash-hand basins, good light and the ventilation clinical use needs.

Glazed meeting rooms beside a living wall at Beaumont House

Meeting rooms with sound control

Glass or solid walls built to keep conversations private, with screens ready for calls.

Lighting wiring and underfloor data being installed at Beaumont House

Cooling, power and data

Air conditioning, lighting and cabling routed through old floors and ceilings with care.

Office kitchen with chrome and black finishes at Beaumont House

Kitchens and breakout

Tea points and staff kitchens that make a small floor feel generous.

Meeting room under an arched window at Beaumont House, refurbished by our team

Estates, licences and working hours in Marylebone

Two old estates own much of Marylebone. The Howard de Walden Estate looks after the streets around Marylebone High Street and the Harley Street Health District; the Portman Estate covers about 110 acres from Edgware Road to beyond Baker Street. If either is your freeholder, its consent sits behind your landlord's licence for alterations.

Marylebone is in the City of Westminster, so noisy work follows the council's permitted hours, and louder work outside them needs prior consent under section 61 of the Control of Pollution Act. Many streets are in conservation areas and many houses are listed: changes inside a listed house can need listed building consent too.

We check the estate, the listing and the lease on the first visit, then prepare one set of drawings and method statements for everyone who has to approve them.

How it works

How an office refurbishment in Marylebone runs

01

Call and visit

Your date, headcount and building first; then we see the floor and its services.

02

Plan and price

A layout and a fixed figure, drawn and costed by the people who will build it.

03

Estate and landlord

Licence drawings, method statements and any estate or council consent.

04

Build

Noisy work in permitted hours; quiet work after hours where the building allows.

05

Move in

Tested, cleaned and certified, ready for your team on the first morning.

Breakout benches under arched windows at Beaumont House

When the lease date cannot move

Our fastest office job so far: a UK tech company with five weeks of lease left and a team of more than 150. Price, mobilise and build had to fit inside that window, so design, ordering and the landlord's paperwork ran at the same time, and our own carpenters, electricians and decorators worked side by side. We started within a fortnight of the call; the 750 m² floor took three weeks.

Marylebone floors are usually smaller, but the method is the same: fix the date, work back, and keep every trade we can in-house so nobody waits for another firm's diary.

Refurbished oak staircase in a period building fitted out by our team in Knightsbridge

Consulting suites on and around Harley Street

Harley Street and the streets around it have housed private doctors and specialists since the 19th century, and the Howard de Walden Estate now runs the area as the Harley Street Health District. Many practices rent a floor or a few rooms in a terraced house and need them refreshed without closing for long.

We plan these jobs room by room: consulting rooms first or last depending on your diary, washbasins and lighting placed for examinations, quiet finishes in waiting areas and the clinical standards your regulator expects. Where the house is listed, the plasterwork and joinery stay; the services are threaded around them.

Cover of the free Craftex Guide to Office Fit-Out

The Craftex Guide to Office Fit-Out

A short read for whoever runs the move: briefing a contractor, the landlord's licence, budgets and the dates that slip.

In every Marylebone office contract

Our commitments to you

Each one is a term of the contract.

  1. Dates set by your lease

    Your move-in day is fixed first; every trade is scheduled back from it.

    Our record: 750 m² in three weeks.

  2. One sum, held

    Anything you add later is costed on paper and signed by you before it starts.

    100% of projects on budget.

  3. More seats per floor

    Our designers squeeze extra workstations out of awkward Georgian rooms.

  4. Direct labour

    Roughly 60% of the people on your floor are on our payroll.

  5. Insured to £10M

    Public liability, employers' liability and PI, with ISO 9001, 14001 and 45001.

  6. Signed-off handover

    Electrical, fire and building control certificates in a folder on day one.

Example office fit-out quotation from another contractor with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Holding a proposal from another firm for a Marylebone suite? Upload it. Our estimator reads every line against your floor and your move date, and you get our lower figure for identical work, with dates attached.

Compare your quotes

What delays Marylebone office projects, and how we prevent it

Ask any contractor how they handle these six.

AreaThe usual riskWith Craftex
Estate consentThe freeholder asked last, after the design is fixedEstate and landlord approvals planned from the first visit
Old buildingsServices designed for a modern floor, then forced into a townhouseRoutes found through existing voids before the layout is final
Small floorsWasted space and too few desksLayouts drawn to fit more people where the building allows
AccessOne narrow stair and no plan for deliveriesDeliveries timed and materials sized for the stair
Time to startA month to price and another to mobiliseWork can begin a fortnight after your first call if the date requires it
HandoverCertificates chased after you move inEverything signed off before the first person arrives

Office fit-out cost in Marylebone, 2026

What a Marylebone office floor costs per sq ft at our 2026 rates, before VAT and fees. Small floors in old houses tend to land near the top of each band.

ItemWhat it coversLow to high spec
Construction (Cat B)New walls and ceilings, flooring, the tea point and reworked services£63–108/sq ft (£678–1,165/m²)
FurnitureWorkstations, seating and tables for the meeting rooms£18–54/sq ft
AV and ITDisplays, conferencing kit and structured cabling£4.50–13.50/sq ft
TotalThe whole fit-out£85.50–176/sq ft (£920–1,890/m²)

Repairs to period fabric, conditions set by the estate and evening shifts are costed separately for each building. Full breakdown: office refurbishment cost.

For a firm number send the plan and your date; a detailed cost plan costs from £750 + VAT and is credited against the build if you go ahead with us.

Free cost calculator

What will your Marylebone office cost?

Type in square metres or how many people will sit on the floor, choose basic, mid or premium, and the range appears.

I know my
Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

A starting point only, before VAT and fees; Georgian-house repairs and freeholder conditions are added once we have seen the building.

The same directors lead every project

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Office refurbishment in Marylebone: your questions

Do I need Howard de Walden or Portman estate consent?

If either estate is your freeholder, your lease will usually need its consent as well as your landlord's licence for alterations. We prepare the drawings and method statements for both; see licence for alterations explained.

Can you fit out consulting rooms in Marylebone?

Yes: treatment and consulting rooms with basins, lighting and ventilation to suit clinical use. See clinic fit-out and refurbishment.

Can you work out of hours?

Quiet tasks can run in the evening. Noisy work follows Westminster's permitted hours unless the council gives prior consent, which we apply for.

Do you do Cat A and Cat B?

Both: Cat A to make a floor lettable, Cat B to fit it out for your team. Our guide: Cat A, Cat A+ and Cat B.

Can you refurbish a listed townhouse office?

Yes. If the house is listed, works that affect its character, inside or out, need listed building consent from Westminster City Council. We check the listing first and build the decision time into your programme.

How fast can you start?

We visit after your first call and come back with a layout, a price and a programme. For a 750 m² office our team started a fortnight after the first call and finished three weeks later.

What does it cost?

Cat B construction is about £63–108 per sq ft ex VAT before furniture and IT. The calculator above gives a range; a survey gives a fixed figure.

How do we start?

Send the address, floor area and your date. We call back, visit and return with a plan, a price and a programme.

Before you refurbish

Planning a move? Start with our office refurbishment checklist and office refurbishment while occupied. Everything we do for offices across the capital: office fit-out in London. Homes and shops locally: builders in Marylebone. Nearby: office refurbishment in Mayfair and office refurbishment in Westminster.

What our clients say

See all reviews on Google
  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Speed and proactivity, proven on our projects

We plan ahead: every change is priced and agreed in writing before the work is done.

  • 3 weeks

    to refurbish a 750 m² office for a fast-growing UK tech company, on site within two weeks of the first call.

  • 8 weeks

    to design and build the 2,500 m² Banbury warehouse, with the site kept running.

  • 8 weeks

    on site at Drake's flagship on Savile Row, with the shop open throughout.

Speak to us and you will see how we work.

We reply within one hour, Monday to Saturday, 8am to 6pm. Urgent? Message us on WhatsApp: we reply straight away, any day.

Refurbishing an office in Marylebone?

Send the address, the floor area and your date. We will tell you what the building and the estate allow, and what can be done by then.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us