Skip to content
Request a callbackCallback

Green belt and grey belt land

Green belt and grey belt land development

Own green belt land in England? Since the new planning rules of 17 August 2026, some green belt development is possible on land that counts as grey belt, and we can buy your land, go into a joint venture, or take it through planning and building for you.

Craftex is a London-based property development and construction company. We take on schemes from about £3M GDV. Most are between £3M and £150M GDV, and larger schemes are welcome, with no upper limit: sites for 100, 500 or 1,000+ homes are exactly what we want. 50+ homes is our preference.

We reply within one hour, Monday to Saturday, 8am to 6pm.

Large open field next to a new housing estate on the edge of a town, seen from above

What green belt land do we look for?

What
SizeSchemes from about £3M GDV. We typically take on £3M–£150M GDV. Larger schemes are welcome: there is no upper limit. GDV is what all the finished homes or buildings would sell for.
Best fit50 or more homes. Large schemes of 100, 500 or 1,000+ homes are welcome.
WhereEngland only.
PlanningWith planning permission or without it. Refused or expired permission is fine too.
WhatLand, buildings and roof space.
Who can send a siteThe owner, an agent, an introducer, a receiver or a lender.
Best placesLand next to a town or village, or within a walk of a railway station.
Used landGreen belt land that has been built on before: yards, old farm buildings, hardstanding.

Is this your land?

Five examples of green belt land that owners send us. They are examples, not our finished projects.

  • A field at the edge of a town

    Houses on one side, open land on the other. Room for 100 or more homes.

  • An old yard or depot

    Sheds, concrete and parking inside the green belt. It has been built on before.

  • Land by a station

    Fields or paddocks within a walk of a railway station.

  • A golf course or nursery that has closed

    Land with buildings and car parks that is no longer in use.

  • A large holding beside a town

    Land that could take several hundred to 1,000+ homes over time.

Three ways to work with us

Three routes, side by side. Ask us which one fits your site.

We buy itJoint ventureWe do it for you
In plain wordsYou sell us the land or building.You put in the land. We put in the work. We share what the scheme makes, as agreed.You keep the land. We run planning, building and sales for you as a turnkey service.
Who pays for planningWe do.Shared, as agreed.You do. We run it.
When you are paidOn completion of the sale, or when planning is granted if the sale is subject to planning.From the scheme's profit, as agreed.You keep the profit. We are paid a fee.
Who carries the riskWe do.We share it, as agreed.You do. We manage it for you.
Who keeps the upsideWe do. Your price is agreed first.Both of us, as agreed.You do.
What you doSend the site. Agree the sale with your solicitor.Agree the plan and the big decisions with us.Approve the key decisions. We do the rest.

More on a joint venture and on development management, which is the route where we do it for you. We can also buy through an option or promotion agreement.

When can green belt land be built on?

These points come from national planning policy, published on 17 August 2026 (GOV.UK). The council decides each case.

  • It must be grey belt

    Grey belt is green belt land that has been built on before, or other green belt land that does little to stop towns from sprawling or merging. Read more about grey belt land.

  • The area must need the homes

    There must be a proven need for the kind of building proposed that is not being met.

  • The place must work

    The site must be in a sustainable location, such as near shops, schools and transport.

  • Land near a station

    Homes within a walk of a well-connected station can also be allowed in the green belt.

The Golden Rules

A large housing scheme on green belt land (10 or more homes, or a site of half a hectare or more) must meet three rules in national policy (GOV.UK).

  • More affordable homes

    Until the council sets its own level, the share of affordable homes is 15 percentage points above the highest level the council asks for elsewhere, up to a cap of 50%.

  • Roads and services

    The scheme must make the necessary improvements to local or national infrastructure, such as roads and services.

  • Green space

    New green space, or better existing green space, that the public can use.

  • Can the rules be reduced?

    Only in a few cases, with a viability assessment: used land with high costs, a strategic site, or a scheme very different from what the local plan tested.

New brick houses at the edge of a grass field with dandelions

Who buys the finished homes

The Golden Rules mean a large share of the homes must be affordable homes.

Larger schemes give more ways to sell the finished homes: on the open market, to housing associations (registered providers) and to investors.

So size matters on green belt land. We plan who will buy each kind of home before the planning application goes in.

That is why 50 or more homes is our best fit, and why larger schemes are welcome.

What can stop green belt land

We check these early. None of them is a reason not to send your land.

  • It is not grey belt

    Land that does a strong job of keeping towns apart is unlikely to count as grey belt.

  • Too far from anything

    A field far from a town, a village or a station is unlikely to pass the location test.

  • The cost of the rules

    Affordable homes, roads and green space all cost money. On a small site the numbers may not work.

  • The council's plan

    A council can also take land out of the green belt through its local plan. We look at where your council's plan stands.

What happens after you send your land

01

Send the address

Fill in the short form: the address or postcode, and a line about the site.

02

We reply

We reply within one hour, Monday to Saturday, 8am to 6pm.

03

We look and call you

We look at planning, size and value. Then we call you.

04

You get the routes in writing

We set out which of the three routes fits your site, in writing.

Send us your site

Tell us where it is and what it is. All enquiries are confidential.

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Tell us about your site in the message box: address, what it is, what you have in mind. You can send plans by email or WhatsApp afterwards.

Other sites we buy

Craftex

10 years on the market,
trading since 2016

Combined team experience

  • 11,127homes taken through planning
  • £228Mland acquired for development
  • 561major construction projects delivered
  • 834design projects delivered

Who you will talk to

Sviatoslav Jerdetchii, our founder, and Robert Barton, our Development Director, look at the sites that come in. Our Development Director's record: 3,985 homes delivered. Work in hand: a rooftop scheme on an occupied block in Islington, now at pre-application.

  • in

Agents and introducers

Have a client with land or a building in England? Send us the site, or register the introduction first.

On land, a building or a development deal, you earn 5–10% of the deal value, paid on exchange.

Guides to green belt land

Green belt land: your questions

Is my green belt land now grey belt?

It may be. Land that has been built on before often is. Other land can count too, if it does little to stop towns from sprawling or merging. There is no national map of grey belt. The council judges it site by site. Send us the address and we will give you our view.

Can I get planning on green belt land without the Golden Rules?

Not for a large housing scheme: 10 or more homes, or a site of half a hectare or more. National policy says such a scheme on green belt land should meet all three Golden Rules. A lower level can be argued only in a few cases, and it must be backed by a viability assessment.

Will you buy green belt land without planning?

Yes. Most green belt land that owners send us has no planning yet, and that is where we help most. One way is an option or promotion agreement, where the cost of the planning work is not yours. We can also buy the land, or run the planning for you while you keep it.

How long does green belt planning take?

It can take a long time, often years. It depends on the council, the local plan and the site. We do not promise a date. We tell you plainly what we think the steps are, and your land can stay in use while the work goes on, as agreed.

What is a rural exception site?

It is a site used for affordable homes that meet local needs, on land that would not normally be used for housing. The homes must stay affordable for good. It is a different route from grey belt.

Do you work outside the London green belt?

Yes. England has green belts around many towns and cities, not only London. We look at green belt land anywhere in England. We do not buy in Scotland, Wales or Northern Ireland.

Do you help with the planning application?

Yes. Our team handles planning for green belt land as part of each route. If we buy the land or work in a joint venture, we carry out the planning work. If you keep the land, we run it for you.

Do you buy land without planning permission?

Yes. Most sites we see have no planning permission yet. We can buy the land outright, agree to buy it once planning is granted (a sale subject to planning), or take an option, which is a right to buy it later. In those cases we pay for the planning work. You can also keep the land and have us run the planning for you.

Is my site big enough?

We take on schemes from about £3M GDV. That means the finished homes or buildings would sell for about £3M or more in total. Most of our schemes are between £3M and £150M GDV, but that is not a cap: larger sites, for hundreds of homes or 1,000+, are welcome. Our best fit is 50 homes or more. A smaller site can still work if neighbouring plots are sold together. If you are not sure, send it.

Do you buy sites outside London?

Yes. Our office is in London, and we buy and develop sites across England: towns, villages, city edges and open land. Send us the address or postcode and we will tell you if the site fits.

Can I keep my land and still develop it?

Yes. That is our third route. You keep the land. We run the planning, the design, the building and the sales for you as one team, and we are paid a fee. You keep the profit and you approve the key decisions. It suits owners who want to keep the land and the result without running the scheme themselves.

What does it cost me to send a site?

Nothing. There is no fee to send us a site and no fee for our first look at it. You do not have to sign anything to ask. If the site fits, we set out the routes in writing and you decide whether to go further.

Is my enquiry confidential?

Yes. All enquiries are confidential. Your details are used only to answer your enquiry, as our privacy notice says. We do not make your site public.

I am an agent or introducer. Is my introduction protected?

Yes. Register the introduction with us in writing before we contact the owner. It is then registered to you for 12 months. What you earn and when it is paid are set out on our page for land agents and in the referral terms.

Not sure if your site fits? Send it anyway.

It costs nothing to ask. We tell you plainly which route fits, or that none does.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us