Brownfield, yards and industrial sites
Brownfield land development: sell, partner or build
Own a yard, an old industrial site, a garage court or other brownfield land in England? Brownfield land development is supported by national planning policy, and you can sell the site to us, go into a joint venture, or keep it and let us build it out for you.
Craftex is a London-based property development and construction company. We take on schemes from about £3M GDV. Most are between £3M and £150M GDV, and larger schemes are welcome, with no upper limit: sites for 100, 500 or 1,000+ homes are exactly what we want. 50+ homes is our preference.
We reply within one hour, Monday to Saturday, 8am to 6pm.
What brownfield sites do we look for?
| What | |
|---|---|
| Size | Schemes from about £3M GDV. We typically take on £3M–£150M GDV. Larger schemes are welcome: there is no upper limit. GDV is what all the finished homes or buildings would sell for. |
| Best fit | 50 or more homes. Large schemes of 100, 500 or 1,000+ homes are welcome. |
| Where | England only. |
| Planning | With planning permission or without it. Refused or expired permission is fine too. |
| What | Land, buildings and roof space. |
| Who can send a site | The owner, an agent, an introducer, a receiver or a lender. |
| Brownfield | Land that has been built on before: yards, works, depots, garages, car parks and empty buildings. |
What this looks like
Four example sites, so you can spot your own. They are examples, not our finished projects.
-
A yard with old sheds
A depot or builder's yard today. Room for 30 to 60 homes.
-
An old factory in a town
Brick works or a mill with land around it. It could become flats and houses.
-
Garage courts on one estate
Each court is small. Sold together they make one scheme.
-
A large former works
Many acres of used land. Room for several hundred homes or more.
Sites we look at
Pick the one closest to yours. If none fits, send it anyway.
-
Yards and depots
Builders' yards, haulage yards, council depots and storage land.
-
Factories and warehouses
Old works, mills, sheds and industrial units, empty or still let.
-
Garage courts
Rows of lock-up garages, best where several sit close together.
-
Petrol stations
Closed or trading forecourts on a main road.
-
Car parks
Surface car parks in a town centre or beside a station.
-
Scrapyards and open storage
Hard, used land with few buildings on it.
-
Empty commercial buildings
Offices, shops and pubs have their own page.
Three ways to work with us
Three routes, side by side. Ask us which one fits your site.
| We buy it | Joint venture | We do it for you | |
|---|---|---|---|
| In plain words | You sell us the land or building. | You put in the land. We put in the work. We share what the scheme makes, as agreed. | You keep the land. We run planning, building and sales for you as a turnkey service. |
| Who pays for planning | We do. | Shared, as agreed. | You do. We run it. |
| When you are paid | On completion of the sale, or when planning is granted if the sale is subject to planning. | From the scheme's profit, as agreed. | You keep the profit. We are paid a fee. |
| Who carries the risk | We do. | We share it, as agreed. | You do. We manage it for you. |
| Who keeps the upside | We do. Your price is agreed first. | Both of us, as agreed. | You do. |
| What you do | Send the site. Agree the sale with your solicitor. | Agree the plan and the big decisions with us. | Approve the key decisions. We do the rest. |
More on a joint venture and on development management, which is the route where we do it for you. We can also buy through an option or promotion agreement.
What planning policy says about brownfield land
These points come from national planning policy, published on 17 August 2026 (GOV.UK).
-
What brownfield means
Planners call it previously developed land: land that was lawfully built on and has, or had, a permanent building on it.
-
Inside a town or village
National policy says building inside a settlement should be approved unless the harm would be much greater than the benefits.
-
Outside a town or village
Fewer things are allowed there. Redeveloping previously developed land is one of them.
-
Empty buildings
Where an empty building is reused or rebuilt, the affordable housing asked for should be reduced in proportion. This does not apply to abandoned buildings.
Contamination, levy and other costs
We check these early. None of them is a reason not to send your site.
-
Contamination
Old industrial land can be polluted. The ground must be tested before anyone can price the clean-up. Some clean-up costs get tax relief: see land remediation relief.
-
Building Safety Levy
A charge on most schemes of 10 or more homes in England since 1 October 2026. The rate is halved where 75% of the site is previously developed land (Savills, November 2026).
-
Wildlife and habitat
Most schemes must leave nature better off. Since 6 August 2026, sites of 0.2 hectares or less are exempt (GOV.UK).
-
A business still on the site
A tenant, or your own business, can often stay while planning is worked on. We agree that at the start.
-
Old buildings and services
Demolition, asbestos and old pipes and cables all add cost. We allow for them in the numbers.
-
Size
One garage court or a small plot is usually below about £3M GDV. Several sites together can reach it.
What happens after you send your site
01
Send the address
Fill in the short form: the address or postcode, and a line about the site.
02
We reply
We reply within one hour, Monday to Saturday, 8am to 6pm.
03
We look and call you
We look at planning, size and value. Then we call you.
04
You get the routes in writing
We set out which of the three routes fits your site, in writing.
Send us your site
Tell us where it is and what it is. All enquiries are confidential.
Tell us about your site in the message box: address, what it is, what you have in mind. You can send plans by email or WhatsApp afterwards.
Other sites we buy
Or see every site type we buy.
-
Farmland, fields and barns
Arable land, pasture, paddocks and farm buildings, often on the edge of a town or village.
-
Green belt and grey belt land
Fields, yards or used land inside the green belt.
-
Freehold blocks and roof space
You own the freehold of a block of flats, or the space above it.
-
Offices, shops, pubs and hotels
Empty or trading. Churches and care homes too.
-
Large gardens and backland
Several plots sold together, or land behind houses with its own way in.
-
Land with planning permission
Owners and developers: a site with consent that you do not want to build out yourself.
-
A portfolio of sites or buildings
Investors and funds: several assets that need one team to plan, build and sell.
-
Problem site?
A stalled or half-built scheme, planning refused or expired, a site that is not selling, or a lender pressing.
Craftex
10 years on the market,trading since 2016
Combined team experience
- 11,127homes taken through planning
- £228Mland acquired for development
- 561major construction projects delivered
- 834design projects delivered
Who you will talk to
Sviatoslav Jerdetchii, our founder, and Robert Barton, our Development Director, look at the sites that come in. Our Development Director's record: 3,985 homes delivered. Work in hand: a rooftop scheme on an occupied block in Islington, now at pre-application.
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Agents and introducers
Have a client with land or a building in England? Send us the site, or register the introduction first.
On land, a building or a development deal, you earn 5–10% of the deal value, paid on exchange.
Guides to brownfield land
-
Brownfield register
How to check if your land is on it, and how to put a site forward.
-
Greenfield or brownfield
How the two kinds of site differ for planning, cost and risk.
-
Derelict buildings and brownfield land
What buyers look for in a brownfield site.
-
Backland and garage sites
How small sites behind houses get planning.
Brownfield sites: your questions
Is my site brownfield?
Probably, if it has been built on. Planners use the term previously developed land. It covers land with a permanent building on it, or one that used to stand there, and the hard surfaces around it. Yards, works, depots and car parks usually count. If you are not sure, send us the address and we will check.
Do you buy contaminated land?
Yes, we look at it. Many old industrial sites have some pollution in the ground. We arrange the ground tests, and the cost of the clean-up becomes part of the deal. Tell us what the site was used for and what you already know.
Do you buy garage courts?
Only where several come together, or where the scheme reaches about £3M GDV. One court of lock-up garages on its own is usually too small for us. If you own several, or the court sits next to other land you own, send it.
Can my business stay on the site until planning is granted?
In most cases, yes. Planning takes time, and the site can stay in use while the work goes on. We agree with you at the start what stays, and for how long, and it is written into the agreement.
Is my site on the brownfield register?
Each council keeps a brownfield land register. It is a list of used sites the council thinks are suitable for homes. You can look on the council's website or ask its planning team. A site does not have to be on the register for us to look at it.
Can an old factory or warehouse become flats?
Sometimes the building is kept and converted. Sometimes it is cleared and new homes are built. It depends on the building and the place. Our page on industrial to residential conversion explains how conversions work.
Do you buy land without planning permission?
Yes. Most sites we see have no planning permission yet. We can buy the land outright, agree to buy it once planning is granted (a sale subject to planning), or take an option, which is a right to buy it later. In those cases we pay for the planning work. You can also keep the land and have us run the planning for you.
Is my site big enough?
We take on schemes from about £3M GDV. That means the finished homes or buildings would sell for about £3M or more in total. Most of our schemes are between £3M and £150M GDV, but that is not a cap: larger sites, for hundreds of homes or 1,000+, are welcome. Our best fit is 50 homes or more. A smaller site can still work if neighbouring plots are sold together. If you are not sure, send it.
Do you buy sites outside London?
Yes. Our office is in London, and we buy and develop sites across England: towns, villages, city edges and open land. Send us the address or postcode and we will tell you if the site fits.
Can I keep my land and still develop it?
Yes. That is our third route. You keep the land. We run the planning, the design, the building and the sales for you as one team, and we are paid a fee. You keep the profit and you approve the key decisions. It suits owners who want to keep the land and the result without running the scheme themselves.
What does it cost me to send a site?
Nothing. There is no fee to send us a site and no fee for our first look at it. You do not have to sign anything to ask. If the site fits, we set out the routes in writing and you decide whether to go further.
Is my enquiry confidential?
Yes. All enquiries are confidential. Your details are used only to answer your enquiry, as our privacy notice says. We do not make your site public.
I am an agent or introducer. Is my introduction protected?
Yes. Register the introduction with us in writing before we contact the owner. It is then registered to you for 12 months. What you earn and when it is paid are set out on our page for land agents and in the referral terms.
Not sure if your site fits? Send it anyway.
It costs nothing to ask. We tell you plainly which route fits, or that none does.