Stalled, refused or half-built sites
Stalled development or problem site? Talk to us
Is your site a stalled development, a half-built scheme, or land with refused or expired planning in England? We can buy it as it is, go into a joint venture to finish it, or take over planning, building and sales for you while you keep it.
Craftex is a London-based property development and construction company. We take on schemes from about £3M GDV. Most are between £3M and £150M GDV, and larger schemes are welcome, with no upper limit: sites for 100, 500 or 1,000+ homes are exactly what we want. 50+ homes is our preference.
We reply within one hour, Monday to Saturday, 8am to 6pm.
Which problem do you have?
Pick the one closest to yours. Receivers, lenders and administrators can send us a site too.
-
Planning refused
The council said no. We look at why, and whether a changed scheme or an appeal could work.
-
Planning expired, or about to
The permission has run out, or the date is close and nothing has started.
-
Build stopped or half built
Work began and then stopped. The frame, the shell or some of the homes are up.
-
Builder or developer gone bust
The contractor or the developer has failed and the site is standing still.
-
A lender pressing, or a receiver
The loan is overdue, or a receiver has been appointed to sell the site.
-
The numbers do not work
The site has planning, but the scheme costs more to build than it would sell for.
-
No way in, or a ransom strip
Someone else owns the strip between your land and the road.
-
It has not sold
The site has been on the market, with or without planning, and no deal has been done.
What sites do we look for?
| What | |
|---|---|
| Size | Schemes from about £3M GDV. We typically take on £3M–£150M GDV. Larger schemes are welcome: there is no upper limit. GDV is what all the finished homes or buildings would sell for. |
| Best fit | 50 or more homes. Large schemes of 100, 500 or 1,000+ homes are welcome. |
| Where | England only. |
| Planning | With planning permission or without it. Refused or expired permission is fine too. |
| What | Land, buildings and roof space. |
| Who can send a site | The owner, an agent, an introducer, a receiver or a lender. |
| Problem sites | Stalled, half built, refused, expired, in receivership or not selling. Send it as it is. |
What this looks like
Four example sites, so you can spot your own. They are examples, not our finished projects.
-
A scheme with consent that never started
Planning is in place for flats or houses. The funding fell away and the date is getting close.
-
A block built to the second floor
The builder went bust. The frame is up and the site is fenced off.
-
A site refused for too many homes
The council refused the scheme. A smaller or different one might pass.
-
A large site held by a lender
A receiver has it for sale. It needs a buyer who can also build it.
Three ways to work with us
We buy it as it is. Or we finish it together with you in a joint venture. Or we restart it for you, and you keep it.
| We buy it | Joint venture | We do it for you | |
|---|---|---|---|
| In plain words | You sell us the land or building. | You put in the land. We put in the work. We share what the scheme makes, as agreed. | You keep the land. We run planning, building and sales for you as a turnkey service. |
| Who pays for planning | We do. | Shared, as agreed. | You do. We run it. |
| When you are paid | On completion of the sale, or when planning is granted if the sale is subject to planning. | From the scheme's profit, as agreed. | You keep the profit. We are paid a fee. |
| Who carries the risk | We do. | We share it, as agreed. | You do. We manage it for you. |
| Who keeps the upside | We do. Your price is agreed first. | Both of us, as agreed. | You do. |
| What you do | Send the site. Agree the sale with your solicitor. | Agree the plan and the big decisions with us. | Approve the key decisions. We do the rest. |
More on a joint venture and on development management, which is the route where we do it for you. We can also buy through an option or promotion agreement.
Taking over a half-built scheme
A stopped site needs checking before anyone can price it. This is what we do first.
-
What is built
We survey what stands on the site and compare it with the approved drawings.
-
The papers
Building control records, warranties and test certificates show what was signed off. Gaps are common. We work out what can be recovered.
-
Tall buildings
Building work on a block with 7 or more storeys, or 18 metres or higher, needs approval from the Building Safety Regulator before it starts (GOV.UK).
-
Levies and agreements
Unpaid levies and planning duties stay with the land. See CIL and Section 106 explained.
What can stop a deal
We tell you early and plainly if one of these applies.
-
Debt above the value
If the loans on the site are more than it is worth, a sale needs the lender to agree.
-
Open disputes
A dispute with a builder, a partner or a neighbour can hold up a sale until it is settled.
-
No legal way in
A site with no right of way from the road may depend on a deal with a neighbour.
-
Size
A single plot well below about £3M GDV is too small for us.
What happens after you send your site
01
Send the address
Fill in the short form: the address or postcode, and a line about the site.
02
We reply
We reply within one hour, Monday to Saturday, 8am to 6pm.
03
We look and call you
We look at planning, size and value. Then we call you.
04
You get the routes in writing
We set out which of the three routes fits your site, in writing.
Send us your site
Tell us where it is and what it is. All enquiries are confidential.
Tell us about your site in the message box: address, what it is, what you have in mind. You can send plans by email or WhatsApp afterwards.
Other sites we buy
Or see everything we take on, and how to sell land to a developer.
-
Farmland, fields and barns
Arable land, pasture, paddocks and farm buildings, often on the edge of a town or village.
-
Green belt and grey belt land
Fields, yards or used land inside the green belt.
-
Brownfield, yards and industrial sites
Factories, depots, garages and land that has been built on before.
-
Freehold blocks and roof space
You own the freehold of a block of flats, or the space above it.
-
Offices, shops, pubs and hotels
Empty or trading. Churches and care homes too.
-
Large gardens and backland
Several plots sold together, or land behind houses with its own way in.
-
Land with planning permission
Owners and developers: a site with consent that you do not want to build out yourself.
-
A portfolio of sites or buildings
Investors and funds: several assets that need one team to plan, build and sell.
Craftex
10 years on the market,trading since 2016
Combined team experience
- 11,127homes taken through planning
- £228Mland acquired for development
- 561major construction projects delivered
- 834design projects delivered
Who you will talk to
Sviatoslav Jerdetchii, our founder, and Robert Barton, our Development Director, look at the sites that come in. Our Development Director's record: 3,985 homes delivered. Work in hand: a rooftop scheme on an occupied block in Islington, now at pre-application.
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Agents and introducers
Have a client with land or a building in England? Send us the site, or register the introduction first.
On land, a building or a development deal, you earn 5–10% of the deal value, paid on exchange.
Guides for owners of problem sites
-
Planning permission refused: what next
Appeal, resubmit, change the scheme, or sell or partner.
-
LPA receivers explained
What a receiver is, what happens to the owner and how receivers sell a site.
-
Ransom strips
What a ransom strip is, and how access problems are solved.
-
Planning appeal guide
How an appeal works after a refusal, and when it is worth it.
-
Development management
How we run a scheme for an owner who keeps the site.
-
A development site in real numbers
How a buyer works out what a site is worth.
Problem sites: your questions
My planning was refused. Should I appeal or sell?
It depends on why it was refused. Sometimes a changed scheme does better than an appeal, and sometimes the refusal can be overturned. Our team handles planning appeal and resubmission. Send us the decision notice. We will give you our view, and say whether we would buy the site as it stands.
My planning permission is about to expire. What can I do?
Send it to us now, before the date. In some cases a proper start on site keeps a permission alive. In others a new application is needed. We look at what your permission says and tell you what we think can be done in the time left.
My builder went bust halfway. Can you finish the scheme?
Yes, we look at schemes like this. We develop and we build, so we can take over the scheme for you, finish it with you in a joint venture, or buy it as it stands. First we survey what is built and check the papers.
Will you buy a site with a charge or a loan on it?
Yes. Many development sites have a loan secured on them. The loan is normally repaid from the sale money when the sale completes, and your solicitor deals with the lender. If the debt is more than the site is worth, the lender must agree to the sale.
The numbers no longer work. Is there still a deal?
Often, yes. A different scheme, a different mix of homes or a different route can change the numbers. We work it through and tell you plainly. If we cannot see a deal, we say so.
I am a receiver or a lender. Can you buy from us?
Yes. Receivers, administrators and lenders can send us a site in the same way as an owner. Say in the message box that you are a receiver or lender, and add the title number if you have it. We act only as a buyer or a development partner. We do not act as a receiver, a lender, a solicitor or a tax adviser.
Do you buy land with a ransom strip or no access?
We look at it. A ransom strip is a strip of land, owned by someone else, between your site and the road. Sometimes it can be bought, and sometimes another way in can be found. We check the title plans first.
Do you buy land without planning permission?
Yes. Most sites we see have no planning permission yet. We can buy the land outright, agree to buy it once planning is granted (a sale subject to planning), or take an option, which is a right to buy it later. In those cases we pay for the planning work. You can also keep the land and have us run the planning for you.
Is my site big enough?
We take on schemes from about £3M GDV. That means the finished homes or buildings would sell for about £3M or more in total. Most of our schemes are between £3M and £150M GDV, but that is not a cap: larger sites, for hundreds of homes or 1,000+, are welcome. Our best fit is 50 homes or more. A smaller site can still work if neighbouring plots are sold together. If you are not sure, send it.
Do you buy sites outside London?
Yes. Our office is in London, and we buy and develop sites across England: towns, villages, city edges and open land. Send us the address or postcode and we will tell you if the site fits.
Can I keep my land and still develop it?
Yes. That is our third route. You keep the land. We run the planning, the design, the building and the sales for you as one team, and we are paid a fee. You keep the profit and you approve the key decisions. It suits owners who want to keep the land and the result without running the scheme themselves.
What does it cost me to send a site?
Nothing. There is no fee to send us a site and no fee for our first look at it. You do not have to sign anything to ask. If the site fits, we set out the routes in writing and you decide whether to go further.
Is my enquiry confidential?
Yes. All enquiries are confidential. Your details are used only to answer your enquiry, as our privacy notice says. We do not make your site public.
I am an agent or introducer. Is my introduction protected?
Yes. Register the introduction with us in writing before we contact the owner. It is then registered to you for 12 months. What you earn and when it is paid are set out on our page for land agents and in the referral terms.
Not sure if your site fits? Send it anyway.
It costs nothing to ask. We tell you plainly which route fits, or that none does.