Skip to content
Request a callbackCallback
Hotel suite sitting room in a period building, with panelled walls, tall draped windows, a gilt-framed landscape and striped sofas

Hotel Interior Design

Rooms, lobby, restaurant and bar designed as one property, then built floor by floor while you keep taking guests.

Craftex team

834 design projects delivered
(combined team experience)

A hotel our team delivered

  • 27 keysin our team's Chelsea boutique hotel remodel
  • 28 weeksfor that remodel, beside a members’ club that stayed open
  • 10 yearson the market, trading since 2016
  • £10Mprofessional indemnity cover behind every drawing

Your hotel designed and built by one team, with guests still checking in

Craftex provides hotel design for boutique and independent hotels in London and across the UK: guest rooms, lobby, restaurant, bar and back of house, from the concept to the build. We take on hotel projects from £100,000 to £10M and above in construction value, and our team delivered the £1.29M, 28-week remodel of Sloane Place, a 27-key boutique hotel in a five-storey Victorian building in Chelsea.

Every closed room costs you money. So we design the hotel around the way it will be built: one floor at a time, with a sample room agreed first and the long-order items bought early. The same team draws it, prices it and builds it.

What we design: rooms and suites, lobby and reception, restaurant and bar, corridors, bathrooms and the services behind them. For whom: owners and operators of boutique and independent hotels, aparthotels and serviced apartments. Where: London first, and hotels across the UK.

Stone, timber, carpet and fabric samples laid out side by side to choose the finishes for a room

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What do we design in a hotel?

Six parts of one property, designed to one standard so a guest never sees the join. When the design is agreed our own team builds it: for works without a new design, see hotel refurbishment.

Hotel bedroom in a period building with a tall upholstered headboard, a dark feature wall and ceiling roses

Guest rooms and suites

Layouts, joinery, headboards, lighting and fabrics for each room type, tested in a sample room first.

Hotel lobby with a curved timber reception desk, a gold fluted wall and leather armchairs on a round rug

Lobby and reception

The first thing a guest sees: the desk, the seating, the lighting and a clear way to the lifts.

Hotel bar with a long counter, leather stools, a lit back bar of bottles and tall brass chandeliers

Hotel restaurant and bar

A room that works for breakfast and for the evening, with the kitchen and bar planned behind it.

Lift lobby with veined marble walls, steel lift doors and a dark ceiling with spotlights

Corridors, lifts and stairs

Carpet, wall finishes, lighting and signs that carry the same look from the lobby to the room door.

Bathroom lined in black marble with a white bath, a heated towel rail and a vanity unit under a wide mirror

Bathrooms

Stone, tiles, vanity units and showers drawn to fit each room, with every pipe and drain checked.

Ventilation grille and duct boxed into a finished ceiling beside a recessed light

Services: heating, cooling, ventilation and fire systems

Quiet heating and cooling in every room, fresh air, hot water and the fire alarm, all hidden in the ceilings.

Which projects do we take on?

Hotel corridor with textured wall covering, patterned carpet and new ceiling lights leading to the room doors

We design for hotel owners and operators, and for investors who are re-positioning a hotel or turning another building into one. Most of our clients run boutique or independent hotels, aparthotels or serviced apartments, and need to keep trading.

The build should be worth £100,000 or more. There is no upper limit. We are not the right firm for a soft refresh of a few rooms: new paint, curtains and bedding are better bought direct.

Send us your brief: number of keys, floors, address, rough budget and your target re-opening date.

How it works

How does a hotel design project run?

01

Survey and brief

Our design lead and quantity surveyor walk the hotel with you and write down the keys, the standard and your trading plan.

02

Concept, sample room and cost plan

Our interior designers set the look. We build one sample room and give you a cost plan before you order the rest.

03

Approvals

Planning and building control, plus listed building or conservation consent where needed. The fire strategy is prepared by the appointed specialist.

04

Drawings, FF&E schedule, fixed price

Construction drawings, the furniture and fittings schedule, and one fixed price from our quantity surveyor.

05

Phased build and handover

Our site team builds floor by floor while the hotel trades, then hands each floor back ready to sell.

Cover of the free Craftex Guide to Hotel Design

The Craftex Guide to Hotel Design

Concept, layout and design for bedrooms, bars and public spaces, and what to settle before you close a single room. A free, short read for owners and operators.

Our promises

Six promises, written into your contract

These are the terms we design and build every hotel to.

  1. One team, concept to keys

    The designers, the quantity surveyor and the site team work for one firm, under one contract.

  2. The design is priced as it grows

    You see the build cost at each stage. Any change is priced and agreed in writing first.

  3. You keep taking guests

    We build in phases, a floor or a wing at a time, with quiet hours agreed with your manager.

  4. Built as drawn

    Around 60% of the labour on site is our own, so the sample room you signed off is the room you get.

    Kensington Olympia: built by the team that drew it

  5. £10M cover on every job

    Public, employers' and professional indemnity cover. ISO 9001, 14001 and 45001, CHAS and SafeContractor.

  6. Zero snags at handover

    We stay until every room is right. Certificates and manuals come with the keys.

Example hotel design and build quotation with a note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a fee proposal from a hotel designer, or a price for the works? Send it to us. A director reads it line by line and comes back with our figure for the same scope, and a phasing plan that keeps rooms on sale.

Check your plans

Where do hotel design projects go wrong?

Hold your plans against these six points before you close a room. Each one costs room nights when it is missed. More on the two routes in design and build vs traditional procurement.

AreaThe usual riskWith Craftex
Rooms off saleRooms stay closed far longer than the plan saidA phasing plan by floor, agreed with your manager before work starts
The sample roomSkipped, so problems show up in every room at onceOne room built and signed off first, then repeated
Furniture and fittingsOrdered late, so finished rooms sit emptyLong-order items listed and bought during the design
NoiseComplaints from guests and neighboursNoisy work kept to agreed hours, with empty rooms as a buffer
Fire and building controlSign-off left to the end, with rooms ready but not openFire and building control agreed during the design, not after it
After re-openingA snag list worked through around paying guestsEach floor checked and put right before it goes back on sale

What do you receive at each design stage?

You never pay for a stage you cannot see. Each one ends with something you can walk through or hold.

StageWhat you receive
ConceptThe look of the hotel, with mood boards, samples and one built sample room
LayoutsRoom and public-area layouts, with the FF&E schedule
ApprovalsDrawings for planning, building control and any consent the building needs
Technical designConstruction drawings and a fixed price for the build
BuildThe works in agreed phases, with a weekly report
HandoverAs-built drawings, test certificates and the operation and maintenance files

We set the design fee after the consultation. It follows the scope of your brief.

Free cost calculator

How much will the build cost?

Enter the floor area and pick a scope. You get a first range for the build at our 2026 rates, ex VAT. This is the cost to build, not a design fee.

Add
Your estimateEnter your spaceex VAT and fees Get a fixed build figure

Indicative build cost, ex VAT, fees and furniture, fittings and equipment. London runs about 9% higher, not applied here. Your fixed figure follows the survey and the agreed design.

Hotel interior design in London and across the UK

Design visual: a Sloane Place lounge with a leather sofa, timber floor, brick chimney breast and a bright painting

Sloane Place, Chelsea: 27 keys as one property

Our team delivered the remodel and refurbishment of Sloane Place in Chelsea, a boutique hotel spread over the five storeys of a Victorian building. In a building like this, no two rooms are the same shape. The task was to make 27 keys feel like one property, with one standard of joinery, lighting and finish in every room. The scope ran across joinery, M&E, finishes and FF&E. The members’ club next door kept operating all the way through, so noise, deliveries and access had to be planned with care.

Bedroom with a tall padded headboard and full-height windows, designed and built by Craftex at Kensington Olympia

One team for the design and the build

On our own projects the same team does both. At Kensington Olympia we designed 400 sq m and rebuilt it in 12 weeks, inside a block where people were living.

Running more than one venue? See hospitality design for groups and investors.

Read more

Owners searching for hotel interior designers in London often meet two kinds of firm: a studio that draws, and a builder that builds. We do both, which matters most in boutique hotel design, where every room is a little different. Luxury hotel interior design depends on details that must be made as they are drawn: joinery, stone, lighting and fabrics. If you are comparing hotel designers or hotel architects, ask who builds the sample room, who orders the furniture and who answers for the re-opening date. One hotel interior designer on our team stays with your project from the first visit to the last room.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Hotel interior design: your questions

How much does hotel interior design cost?

Design fees are set at the consultation, once we have your brief. They depend on the number of keys and the stages you need. We take on builds from £100,000, and the calculator above gives a first range for the build. See also hotel refurbishment cost.

Do you design a sample room first?

Yes. We build one room in full and you sign it off before the main order is placed. It is the cheapest place to find a problem.

How long does a hotel redesign take?

It depends on the number of keys and how many rooms you can close at once. As a guide, our team's Sloane Place remodel took 28 weeks for 27 keys. We set your programme at the brief.

Do you also design the hotel restaurant and bar?

Yes. The restaurant and bar are designed with the rest of the hotel, so guests feel one standard. More on our restaurant interior design page.

Do you work outside London?

Yes. We are based in London and design and build hotels across the UK.

Can the hotel stay open during the works?

Yes, in most cases. We close one floor or one wing, finish it and move on, while the other rooms stay on sale. At Sloane Place, which our team delivered, the members’ club next door stayed open throughout.

Do you handle FF&E?

Yes. We write the schedule, buy the items and install them. Read what hotel FF&E covers.

Can you design a boutique hotel in a listed or period building?

Yes. We design for period buildings, and we apply for listed building or conservation consent where the building needs it. We check this at the survey.

How should the hotel room layout be planned?

Start with the bed, the bathroom door and the window. Then place storage, the desk and the sockets. We test each room type as a sample room before the rest are built.

What our clients say

See all reviews on Google
  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Planning to redesign your hotel?

Send us the number of keys, the floors, the address, a rough budget and the date you want to re-open. A director reads every brief. We reply within one hour, Monday to Saturday, 8am to 6pm.

Urgent? Message us on WhatsApp: we reply straight away, any day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us