Skip to content
Request a callbackCallback
Club lounge with tub chairs around low tables, a white fireplace, a mirror and tall windows

Hospitality Interior Design

Guest spaces designed for how the venue trades, then built by the same team to your opening date.

Combined team experience

834 design projects delivered
by our team

What stands behind your project

  • 10 yearson the market, trading since 2016
  • £10Mprofessional indemnity cover on our design work
  • 27 keysin a Chelsea boutique hotel remodelled in 28 weeks, delivered by our team
  • 17 weeksfrom concept to handover at Medusa, a Knightsbridge spa and salon

One team for every guest space

Craftex provides hospitality interior design for operators, groups and investors in London and across the UK: hotels, restaurants, bars, members' clubs and spas, from the first concept to the build. We take on hospitality projects from £100,000 to £10M and above in construction value (spas and beauty from £150,000), and our team delivered the £1.29M, 28-week remodel of Sloane Place, a 27-key boutique hotel in Chelsea next to a members' club that kept trading.

You get one team from the first concept to opening. The people who draw your venue also price it and build it, so each space is designed to a budget and a date.

What we design: lobbies and guest rooms, restaurants, bars, members' clubs, spas and back of house. For whom: operators, groups and investors. Where: London first, then the rest of the UK.

Material board with marble, timber, fabric and ceramic samples laid out on a table

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Which hospitality spaces do we design?

Six kinds of space, one design team and one contract, so the whole venue reads as one place.

Hotel lobby lounge at night with a long glass-fronted fireplace, dark panelling and low seating

Hotel lobbies and guest rooms

Arrival, lounge and bedrooms designed as one property, room type by room type.

Restaurant tables set with blue plates and glasses beside curved tub chairs

Restaurants and cafes

Dining rooms and kitchens planned around covers. More on our restaurant interior designers page.

Bar with a dark panelled counter, hanging glass racks and tall arched windows

Bars and lounges

The bar, back bar and seating, with drinks service and storage worked out.

Large club lounge with leather wing chairs, a stone fireplace and chandeliers under a timber ceiling

Members' clubs and private dining

Rooms that feel like home to your members, with service kept out of sight.

A treatment room at Medusa, Knightsbridge, with blue hand-finished walls, a couch and a gold mirror

Spas, salons and wellness

Treatment rooms and wet areas planned around water, power and fresh air.

New ductwork, cable trays and lighting under an open ceiling at Portsoken House

Back of house and services

Kitchens, stores, plant and fresh air designed with the guest spaces, so nothing is squeezed in later.

Which projects do we take on?

Hotel corridor with blue walls, panelled doors and gilt-framed flower paintings

Right for us

Operators, groups, investors and landlords of hospitality buildings, including roll-outs over several sites. The building work is worth £100,000 or more, and our largest jobs go past £10M.

Not for us

Decoration-only refreshes and projects under £100,000.

What to tell us first

Where the venue is, which spaces are in the project, how it trades today, roughly what you plan to spend and when you need to open.

How it works

How does a hospitality design project run?

01

Brief and survey

We learn how the venue trades, who the guests are and what must stay open. Then we measure the building.

02

Concept and cost plan

Our interior designer draws a concept for each space. Our quantity surveyor prices it as it is drawn.

03

Approvals

We handle landlord consent, planning for signs and outside units, licensing drawings and building control.

04

Drawings, FF&E and price

Construction drawings, a schedule of furniture, fittings and equipment, and one fixed price.

05

Build and handover

Our site team builds in phases, so the venue or its neighbours can keep trading.

Cover of the free Craftex guide to hospitality design

The Craftex Guide to Hospitality Design

Our free guide to hospitality design, planned around the guest: layout, atmosphere, cost and the steps before opening. Read it before you brief a design team.

Our promises

Six promises, written into your contract

These are terms in your contract, not sales lines. They apply to every venue we design and build.

  1. One team from concept to opening

    Designers, surveyor and builders in one company, under one contract.

    Medusa spa and salon: concept to handover in 17 weeks

  2. The agreed price stands

    We fix the price when the drawings are done. A change is written down and priced before anyone starts it.

  3. Guests and neighbours come first

    We phase the works so the venue, or the business next door, keeps trading.

    Sloane Place, delivered by our team: the club next door stayed open

  4. Built faster with our own labour

    Around 60% of the labour on site is our own, so the programme does not wait for other firms.

  5. £10M insurance cover

    Public liability, employers' liability and professional indemnity: £10M each.

  6. Every certificate at handover

    Electrical, gas and fire certificates in one file, with the manuals for each system.

A printed quotation for a hospitality interior on a desk with a note saying send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have a quote for the works, or a concept priced by someone else? Send it to us. We survey first, then come back with our price for the same scope.

Compare the two routes

Where do hospitality design projects go wrong?

Hospitality projects have more parts than most: rooms, kitchens, bars, furniture and guests on site. These are the six places they can fail.

AreaThe usual riskWith Craftex
The conceptA concept that cannot be built for the budgetEach space is priced while it is drawn
Furniture and fittingsFF&E ordered late, so rooms open half finishedLong-lead items are scheduled and ordered early
GuestsNoise and dust reach guests during the worksWorks are phased and screened around trading
Licensing and fireLicensing drawings or fire sign-off missed before openingWe prepare the drawings and collect each sign-off
Who owns the dateOne consultant per trade and nobody owns the dateOne team, one programme, one opening date
OpeningA long snag list on opening daySnags closed before you open

What do you receive at each design stage?

Each stage ends with something you can check and sign off before the next one starts.

StageWhat you receive
ConceptA concept for each space and a first cost plan
Layout and FF&ELayouts and a schedule of furniture, fittings and equipment
ApprovalsDrawings for the landlord, planning, licensing and building control
Construction drawingsThe full technical design and one fixed price
BuildA phased programme and every change agreed in writing
HandoverThe finished spaces, certificates and operating manuals

Design fees are set at the consultation, from your brief. What FF&E covers is explained in our guide to hotel FF&E.

Free cost calculator

How much will the build cost?

Enter the floor area and pick a scope. You get a first range for the build cost at our 2026 rates for restaurant, bar and front-of-house work. It is the cost of building work, not a design fee.

Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, ex VAT, fees and loose furniture, for a sound building with services available. Hotel bedrooms are priced after a walk-round. Your fixed figure comes after a survey.

Hospitality interior design in London and across the UK

Design visual of a Sloane Place lounge with an orange velvet sofa and green walls

London first. We work in Chelsea, Knightsbridge and Mayfair, and take the same team to venues across the UK.

Design visual of a Sloane Place suite with a brass four-poster frame against a green wall

Sloane Place, Chelsea: a hotel project our team delivered

Our team delivered the remodel and refurbishment of Sloane Place, a boutique hotel of 27 bedrooms and suites in a five-storey Victorian building in Chelsea. The programme ran for 28 weeks beside a members' club that stayed open, and the project value was £1.29M. The images here are design visuals.

Read more

The scope ran across joinery, M&E, finishes and FF&E. Every bedroom and suite called for bespoke high-gloss joinery, velvet headboards and stone en-suites, all to one standard. Works were sequenced floor by floor to contain noise and mess and to protect the neighbours. The same team delivered the hotel's lower-ground cocktail bar.

When the design is agreed, the same team can build it as a hospitality fit out.

Looking for a hospitality interior designer, hospitality designers or hospitality architects in London? Ask who prices the concept and who builds it. Hospitality design that is costed as it is drawn does not need redrawing after the tender. For shops, salons and showrooms, see our page on commercial interiors.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Hospitality interior design: your questions

What does a hospitality interior designer do?

A hospitality interior designer sets a concept for each guest space, plans the layouts, chooses furniture, finishes and lighting, and prepares the approvals and the construction drawings. At Craftex the same company then builds it.

How much does hospitality interior design cost?

The design fee is set at the consultation, once we have your brief. The build is priced by our quantity surveyor as the scheme is drawn, and the calculator above gives a first range for restaurant and bar areas.

Can you work while the hotel or venue keeps trading?

Yes. We phase the works, screen them and plan noisy tasks around your guests. Our team delivered the Sloane Place hotel remodel in Chelsea, where the members' club beside the site kept operating for the whole programme.

Do you handle FF&E?

Yes. We schedule the furniture, fittings and equipment with the design, order long-lead items early and install them before handover.

Do you handle licensing drawings, planning for signage and plant, and building control?

Yes. We prepare the drawings, make the applications and manage each approval through to sign-off.

Can you roll one design out across several sites?

Yes. We prepare one design pack, then survey and price each site on its own, with the same team on every one.

Can you work with our brand designer or architect?

Yes. We take their concept, turn it into construction drawings and build it.

Do you design hotels, restaurants and bars separately?

Yes. A single restaurant, a bar or one floor of a hotel can be its own project, as long as the build is worth £100,000 or more. A whole hotel has its own page: hotel interior design.

Do you work outside London?

Yes. Our base is in Victoria, London, and we design and build across the UK when the project fits our size range.

What our clients say

See all reviews on Google
  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Planning a hotel, restaurant, bar or club project?

Send us your brief: floor plan, address, rough budget and opening date.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us