Retail and Shop Interior Design
Stores and showrooms designed to sell, with the joinery made and fitted by the same team.
Craftex team
834 design projects delivered(combined team experience)
A flagship we designed and built
- 4 weeksof design for Drake’s flagship on Savile Row, Mayfair
- 8 weekson site at Drake’s, with the shop open throughout
- 10 yearson the market, trading since 2016
- £10Mprofessional indemnity cover behind every drawing
A store designed to sell, drawn and built by one team
Craftex provides shop interior design and retail design for brands in London and across the UK: flagship stores, showrooms and roll-outs, from the layout and joinery to the build. We take on retail projects from £100,000 to £10M and above in construction value: for Drake’s on Savile Row we spent 4 weeks on design and 8 weeks on site, with the shop open throughout.
A store design is only as good as the way it is made. When one firm draws the joinery and another makes it, the detail gets lost and the opening date slips. Our designers draw the store, our quantity surveyor prices it, and our own team makes and fits it.
What we design: the layout and customer route, joinery, rails and displays, fitting rooms, showrooms, lighting, power and data. For whom: brands and retailers opening a flagship, a showroom or several stores. Where: Mayfair, Knightsbridge and the City first, and stores across the UK.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What do we design in a store?
Six parts of one store, drawn by one team and built by it too. For the works without a new design, see retail fit out.
Store layout and customer route
Where people come in, what they see first and how they move past the product to the till.
Bespoke joinery, rails and displays
Shelving, rails, tables and counters drawn for your product, then made and installed by our team.
Fitting rooms and made-to-order areas
Mirrors, seating, lighting and privacy planned so a customer is happy to stay and try more.
Showrooms and brand spaces
Rooms that show a product at its best, for trade buyers, press days and private clients.
Retail lighting
Light that shows the true colour and texture of the product, with feature lights where you want people to stop.
Services: power and data to tills and workstations
Sockets, data and screens placed where the tills, the stock room and the staff desks need them.
Which projects do we take on?
We design for brands and retailers planning a flagship store, a showroom, a department-store concession with a full build, or the same design in several stores.
The build should be worth £100,000 or more per project. There is no upper limit. We are not the right firm for a refresh of one small shop: a local shopfitter will serve you better.
Send us your brief: floor plan, address, brand guidelines, rough budget and opening date.
How it works
How does a retail design project run?
01
Brand brief and survey
Our design lead and quantity surveyor learn your brand and product, then measure the unit.
02
Layout, joinery concept, cost plan
Our interior designers draw the layout and the joinery. You get a cost plan with it.
03
Landlord and consents
We get the licence to alter from your landlord, and signage consent where needed.
04
Drawings and fixed price
Construction and joinery drawings, with one fixed price from our quantity surveyor.
05
Build and handover
Our site team builds while you trade, or before you open, and hands over every certificate.
The Craftex Guide to Retail Design
What drives the cost of a store, how long each stage takes, which consents you need and what to ask before you sign, in one short guide. It is free to download.
Our promises
Six promises, written into your contract
These are the terms we design and build every store to.
-
One team, first sketch to opening day
The designers, the joiners and the site team work under one contract, with one point of contact.
-
The design is priced as it grows
You see the build cost at each stage. Any change is priced and agreed in writing first.
-
Your store keeps trading
We work in phases and out of hours, and keep the shop floor clean for your customers.
Drake’s, Savile Row: open throughout
-
Built as drawn
Around 60% of the labour on site is our own, so the joinery matches the drawing.
Drake’s: joinery designed, made and installed by us
-
£10M cover on every job
Public, employers' and professional indemnity cover. ISO 9001, 14001 and 45001, CHAS and SafeContractor.
-
Zero snags on opening day
We stay until it is right. Certificates and manuals are handed over with the keys.
Already have a quote? Send it to us. We'll beat it.
Have a fee proposal from a retail designer, or a shopfitting price? Send it to us. A director reads it line by line and comes back with our figure for the same scope, and a programme that meets your opening date.
Check your plans
Where do retail design projects go wrong?
Hold your plans against these six points before you sign. Each one can move an opening date. More on the two routes in design and build vs traditional procurement.
| Area | The usual risk | With Craftex |
|---|---|---|
| The joinery | Designed by one firm and made by another, so details are lost | Drawn, made and installed by one team |
| Trading | The store closes for longer than planned | Phased and out-of-hours work, as at Drake’s |
| The lighting | Flat light that makes good product look dull | Lighting designed around your product, with fittings chosen for true colour |
| The landlord | Approval asked for late, so the start date moves | Licence drawings sent early and questions answered by us |
| The roll-out | A first store that costs too much to repeat | One design pack, priced per site before you commit |
| Handover | Keys with no certificates | Electrical, fire and building control certificates with the keys |
What do you receive at each design stage?
You never pay for a stage you cannot see. Each one ends with something you can check and sign off.
| Stage | What you receive |
|---|---|
| Brief | A written brief: brand, product, customers, budget and opening date |
| Concept | Layout and joinery concept, with samples and a cost plan |
| Approvals | The pack for your landlord and any consent the unit needs |
| Technical design | Construction and joinery drawings and a fixed price for the build |
| Build | The works in agreed phases, with a weekly report |
| Handover | As-built drawings, certificates and the operation and maintenance files |
We set the design fee after the consultation. It follows the scope of your brief.
Free cost calculator
How much will the build cost?
Enter the floor area and pick a tier. You get a first range for the build at our 2026 rates, ex VAT. This is the cost to build, not a design fee.
Shop interior design in London and across the UK
Drake’s, Savile Row: a flagship redesigned while it traded
For Drake’s at 9 Savile Row we designed and built a £410K project in a 120 sq m store. We replaced the lighting with commercial-grade retail luminaires and laid new flooring made for high footfall. Our team designed, made and installed the bespoke joinery, including desks for the office team and a 5 m clothing rail system. We re-planned the made-to-order area and gave it pull-out angled mirrors. New power and data went to the shop floor and the staff workstations. The shop stayed open to customers from start to finish.
Flagships, showrooms and roll-outs
We work in Mayfair and Savile Row, Knightsbridge and the City, and on stores across the UK. For ideas on layout, read our guide to retail design.
Designing an office, a clinic or another business space too? See interior design for commercial spaces.
Read more
Brands looking for retail designers or a retail design agency in London often want two things: a store that looks like the brand, and a firm that can build it on time. We are retail interior designers who also build, so the drawings are made to be built. For shop design in London we prepare the full pack your landlord asks for. Showroom interior design follows the same steps, with more weight on lighting and display. If you are comparing a retail interior designer with retail architects, ask who makes the joinery and who answers for the opening date.
Retail design projects
A Savile Row flagship, a Knightsbridge salon with its own retail counter and a City reception: three front-of-house spaces our team designed and built.
-
Drake’s, Savile Row, Mayfair A 120 sq m menswear flagship: 4 weeks of design and 8 weeks on site, joinery made by us, open throughout. View case study
-
Medusa, Knightsbridge A salon and spa on Beauchamp Place over 4 levels, from concept to handover in 17 weeks. View case study
-
Portsoken House reception, Aldgate A 70 sq m reception designed and rebuilt in 12 weeks of nights and weekends, with every tenant at work. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Shop interior design: your questions
How much does shop interior design cost?
Design fees are set at the consultation, once we have your brief. They depend on the size of the store and the stages you need. We take on builds from £100,000, and the calculator above gives a first range for the build. See also shop fit-out cost.
Do you make the joinery?
Yes. At Drake’s we designed, made and installed the joinery, from the shelving to a 5 m clothing rail system. You deal with one team for the drawing and the finished piece.
Can you roll a design out across several stores?
Yes. We produce one design pack and price it for each site, so you know what the next store will cost before you sign its lease.
Do you handle landlord approval and signage consent?
Yes. We prepare the drawings your landlord asks for and apply for signage consent where the unit needs it.
Do you work outside London?
Yes. We are based in London and design and build stores across the UK.
Can the store keep trading during the works?
Yes, in most cases. We work in phases and out of hours. Drake’s on Savile Row stayed open for all 8 weeks we were on site.
Are you a retail design agency?
We design the store and we build it. Your brand identity, logo and campaigns stay with your brand agency, and we work from their guidelines.
Do you design showrooms?
Yes. We design showrooms for trade buyers and private clients. Read showroom fit out in London.
Do you also do the shopfitting?
Yes. Our own team builds what we draw. See shopfitting and retail fit out.
Read before you design your store
Guides written from stores we have designed and built: layout, cost and showrooms.
-
Guide Retail Design: How to Plan a Store That Sells Read the guide
-
Guide How Much Does a Shop Fit-Out Cost? 2026 Prices per m² for UK and London Stores Read the guide
-
Guide Showroom Fit-Out in London: From Consents to Opening Day Read the guide
What our clients say
See all reviews on Google-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Planning a flagship, a showroom or a roll-out?
Send us the floor plan, the address, your brand guidelines, a rough budget and your opening date. A director reads every brief. We reply within one hour, Monday to Saturday, 8am to 6pm.
Urgent? Message us on WhatsApp: we reply straight away, any day.



























